← Back
Other miscellaneous
12020 FLATLANDS AVENUE
BROOKLYN · BIN 3348861
💬 Discuss this project
0Year Built
—Stories
Z9Building Class
R7-2Zoning
0 sfGross Floor Area
0Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Other miscellaneous · Owner of record: CHRISTIAN CULTURAL CENTER INC · 8,510 sf lot · 0 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOHLER ENGINEERING NY PLLC.306/23/2026
MRCE104/10/2026
SYNC ARCHITECTURE P.C107/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONADNOCK CONSTRUCTION INGeneral Contractor107/08/2026
Building Lifecycle
All (44)Filed (5)Permit Issued (1)Signed Off (1)Violation (24)Objection (8)Special Inspection (5)
07/28/2026
Objection resolved — Addressed
07/28/2026
Objection resolved — Resolved
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/23/2026
Filed — Alteration
proposed 30 foot curb cut as per plans filed
B01413327-S1
06/22/2026
Filed — Alteration
proposed 30 foot curb cut as per plans filed
B01413327-S2
06/22/2026
Filed — Alteration
proposed 30 foot curb cut as per plans filed
B01413327-I1
06/18/2026
Special inspection requirement — Final
05/18/2026
Permit issued — Foundation
B01383870-I1-FO
04/22/2026
Special inspection requirement — Deep Foundation Elements
Tony Canale
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Other
04/17/2026
Objection resolved — Addressed
04/10/2026
Filed — Alteration
Perform pile load tests on site as per plans filed
B01383870-I1
04/07/2026
Special inspection requirement — Final
Tony Canale
04/07/2026
Special inspection requirement — Footing and Foundation
Tony Canale
03/25/2026
Violation issued (FDNY_NOV, closed)
09/19/2025
Violation issued (ECB, open)
Construction
08/04/2025
Signed off — Alteration
Temporary tents in the parking lot for a groundbreaking ceremony. Removed at the end of the programming. No changes to use, occupancy or egress.
B01253117-I1
07/10/2025
Filed — Alteration
Temporary tents in the parking lot for a groundbreaking ceremony. Removed at the end of the programming. No changes to use, occupancy or egress.
B01253117-I1
07/09/2025
Special inspection requirement — Final
ANDY ENGLER ROTH
03/28/2024
Violation issued (FDNY_NOV, closed)
01/31/2022
Violation issued (ECB, closed)
Elevators
01/31/2022
Violation issued (ECB, closed)
Elevators
02/07/2019
Violation issued (FDNY_ORDER, closed)
06/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/12/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/21/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/21/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/06/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/03/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/03/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedMONADNOCK CONSTRUCTION IN05/18/2026
1 project · most recent 06/23/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/23/2026——Storm, Water/Sanitary
4 projects · most recent 08/18/2026
General Wiring Lighting
FiledStatusContractorScope
08/18/2026Permit IssuedAMBER LITE ELECTRIC CORP.—
08/06/2026Permit IssuedGLO ELECTRIC LLCGeneral Wiring, Lighting
10/29/2024Permit IssuedB.P. ELECTRIC CORP—
09/11/2024CompleteAMBER LITE ELECTRIC CORP.1 meters, 1 new_meters
1 project · most recent 04/10/2026
FiledStatusContractorScope
04/10/2026Permit IssuedMONADNOCK CONSTRUCTION IN1 scope_items
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/18/2026Final—progress
04/22/2026Deep Foundation ElementsTony Canalespecial
04/07/2026FinalTony Canaleprogress
04/07/2026Footing and FoundationTony Canaleprogress
07/09/2025FinalANDY ENGLER ROTHprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B01383870-I1Request digital key ↗
08/21/2026B01253117-I1Request digital key ↗
08/16/2026B01413327-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B01383870-I1Open ↗
08/16/2026B01413327-S2Open ↗
08/16/2026B01413327-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B01253117-I1Open ↗
08/22/2026B01383870-I1Open ↗
08/22/2026B01383870-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B01383870-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/16/2026B01413327-I1Open ↗
08/16/2026B01413327-S2Open ↗
08/15/2026B01413327-S1Open ↗
Showing 3 of 5 on file for this type