← Back
All parking garages
1204 WASHINGTON AVENUE
BRONX · Claremont Village-Claremont (East) · BIN 2001319
💬 Discuss this project
1963Year Built
2Stories
G1Building Class
R7-1Zoning
7,904 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
All parking garages · Owner of record: GOBEL HOLDING CORP · 11,881 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 4 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOBEL HOLDING1603/22/2026
GOBEL HOUSING CORP103/22/2026
GOBLE HOLDING CORP203/22/2026
OWNER OF 1204 WASHINGTON303/22/2026
1204 WASHINGTON RESTAURANT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M JUST ARCHITECTURE PC512/04/2024
THEODORE YEN110/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERFORMANCE MAINTENANCEGeneral Contractor207/08/2026
REPUBLIC CONSTRUCTION COGeneral Contractor203/21/2026
JOHNNY'S P&H CONTRAC INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHWANI KHANNA PE5256112/04/2024
HANSEN ENGINEERING PC8174207/09/2021
Building Lifecycle
All (73)Filed (6)Permit Issued (5)Signed Off (5)Violation (26)Inspection (7)Objection (8)Special Inspection (16)
07/03/2025
Signed off — Alteration
X01136921-I1
07/03/2025
Signed off — Alteration
PLUMBING WORK TO CAP & REMOVE (1) TOILET & (1) LAVATORY & RELOCATE (1) LAVATORY & (1) TOILET ON THE 2ND FLOOR ONLY.
X01136962-I1
05/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2025
Permit issued — General Construction
X01136921-I1-GC
02/27/2025
Permit issued — Plumbing
X01136962-I1-PL
12/04/2024
Filed — Alteration
X01136921-I1
12/04/2024
Filed — Alteration
PLUMBING WORK TO CAP & REMOVE (1) TOILET & (1) LAVATORY & RELOCATE (1) LAVATORY & (1) TOILET ON THE 2ND FLOOR ONLY.
X01136962-I1
11/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Final
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Interior lighting power
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Lighting controls
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASHWANI KHANNA
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
ASHWANI KHANNA
10/17/2024
Violation issued (ECB, closed)
Construction
09/26/2024
Violation issued (ECB, closed)
Construction
10/18/2023
Signed off — Alteration
Remove and dispose of illegal carport to restore to previous legal conditions. This application is being filed to correct the following ECB violations: 34838149Z, 35379332N, 35430438M, 35427142X, 35399336Z, & 35397991X.
X00511501-S1
10/18/2023
Signed off — Alteration
Remove and dispose of illegal carport to restore to previous legal conditions. This application is being filed to correct the following ECB violations: 34838149Z, 35379332N, 35430438M, 35427142X, 35399336Z, & 35397991X.
X00511501-I1
10/18/2023
Signed off — Alteration
Remove & cap (1) existing gas fired range, (1) bathtub, and (1) shower at second floor to restore to previous legal conditions. No change in use, egress, or occupancy under this application.
X00511461-I1
06/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/09/2023
Permit issued — Mechanical Systems
X00511501-S1-MS
02/07/2023
Permit issued — Plumbing
X00511461-I1-PL
02/06/2023
Permit issued — General Construction
X00511501-I1-GC
08/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/09/2021
Filed — Alteration
Remove and dispose of illegal carport to restore to previous legal conditions. This application is being filed to correct the following ECB violations: 34838149Z, 35379332N, 35430438M, 35427142X, 35399336Z, & 35397991X.
X00511501-S1
06/24/2021
Objection resolved — Addressed
06/24/2021
Special inspection requirement — Final
Ryan Hansen
06/24/2021
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
06/24/2021
Special inspection requirement — Maintenance information
Ryan Hansen
06/24/2021
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
06/24/2021
Special inspection requirement — Mechanical Systems
Ryan Hansen
05/12/2021
Objection raised — Other
05/12/2021
Objection resolved — Addressed
05/12/2021
Objection raised — Other
05/12/2021
Objection resolved — Addressed
05/12/2021
Objection raised — Other
05/12/2021
Objection resolved — Addressed
05/10/2021
Objection raised — Admin
04/28/2021
Filed — Alteration
Remove and dispose of illegal carport to restore to previous legal conditions. This application is being filed to correct the following ECB violations: 34838149Z, 35379332N, 35430438M, 35427142X, 35399336Z, & 35397991X.
X00511501-I1
04/28/2021
Filed — Alteration
Remove & cap (1) existing gas fired range, (1) bathtub, and (1) shower at second floor to restore to previous legal conditions. No change in use, egress, or occupancy under this application.
X00511461-I1
04/27/2021
Special inspection requirement — Final
Ryan Hansen
04/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
01/13/2020
Violation issued (ECB, closed)
Construction
11/26/2019
Violation issued (ECB, closed)
Construction
10/09/2019
Violation issued (ECB, closed)
Construction
10/09/2019
Violation issued (ECB, closed)
Construction
10/02/2019
Filed — Alteration
X00220805-I1
08/07/2019
Violation issued (ECB, closed)
Construction
08/07/2019
Violation issued (ECB, closed)
Construction
05/21/2019
Violation issued (ECB, closed)
Construction
05/21/2019
Violation issued (ECB, closed)
Construction
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offREPUBLIC CONSTRUCTION CO03/25/2025
DOB NOWPlumbingSigned-offJOHNNY NANHU02/27/2025
DOB NOWMechanical SystemsSigned-offPERFORMANCE MAINTENANCE02/09/2023
DOB NOWPlumbingSigned-offJOHNNY NANHU02/07/2023
DOB NOWGeneral ConstructionSigned-offPERFORMANCE MAINTENANCE02/06/2023
BISOTISSUEDREPUBLIC CONSTRUCTION CO05/05/2010
BISOTISSUEDREPUBLIC CONSTRUCTION CO03/01/2010
BISOTISSUEDREPUBLIC CONSTRUCTION12/11/1996
BISOTISSUEDREPUBLIC CONSTRUCTION10/29/1996
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/04/2024HVAC-R and service water piping design and insulationASHWANI KHANNAenergy_progress
11/04/2024FinalASHWANI KHANNAprogress
11/04/2024Energy Code Compliance InspectionsASHWANI KHANNAprogress
11/04/2024Fire-Resistance Rated ConstructionASHWANI KHANNAprogress
11/04/2024Interior lighting powerASHWANI KHANNAenergy_progress
11/04/2024Lighting controlsASHWANI KHANNAenergy_progress
11/04/2024Fire-Resistant Penetrations and JointsASHWANI KHANNAspecial
11/04/2024Energy Code Compliance InspectionsASHWANI KHANNAprogress
08/05/2021Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/24/2021FinalRyan Hansenprogress
06/24/2021HVAC-R and service water heating equipmentRyan Hansenenergy_progress
06/24/2021Maintenance informationRyan Hansenenergy_progress
06/24/2021HVAC-R and service water heating system controlsRyan Hansenenergy_progress
06/24/2021Mechanical SystemsRyan Hansenspecial
04/27/2021FinalRyan Hansenprogress
04/27/2021Fire-Resistant Penetrations and JointsRyan Hansenspecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/25/2026X00511501-S1Request digital key ↗
08/20/2026X01136921-I1Request digital key ↗
08/20/2026X01136962-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00220805-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/22/2010220049481Open ↗
▸BISWORK PERMIT APPLICATION1
03/01/2010220049481Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026X00511501-S1Open ↗
09/01/2026X00511501-S1Open ↗
09/01/2026X01136962-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00220805-I1Open ↗
08/25/2026X00511461-I1Open ↗
08/25/2026X00511501-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00511501-S1Open ↗
09/01/2026X01136962-I1Open ↗
08/22/2026X00511461-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/18/2012220140078Open ↗
02/22/2010220049481Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/22/2010220049481Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/22/2010220049481Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/22/2010220049481Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026X00220805-I1Open ↗
08/25/2026X00511501-S1Open ↗
08/14/2026X00511501-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/18/2012220140078Open ↗
04/18/2012220140069Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/25/2026X00511501-S1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/15/2015220140078Open ↗
07/15/2015220140078Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/18/2012220140078Open ↗
02/22/2010220049481Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/18/2012220140078Open ↗
02/22/2010220049481Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/22/2010220049481Open ↗