← Back
Elevator apt, fireproof without stores
1206 EASTERN PARKWAY
BROOKLYN · BIN 3037592
💬 Discuss this project
2023Year Built
8Stories
D3Building Class
R7-1Zoning
19,475 sfGross Floor Area
18Units
Rent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 1206 EASTERN LLC · 4,325 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneral
Roof39p · 3 filings · 20 docs
Floor 830p · 1 filing · 20 docs
Floor 733p · 3 filings · 20 docs
Floor 631p · 2 filings · 20 docs
Floor 530p · 1 filing · 20 docs
Floor 431p · 2 filings · 20 docs
Floor 330p · 1 filing · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 131p · 1 filing · 20 docs
Cellar32p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP303/22/2026
HLB CONSTRUCTION903/22/2026
1206 EASTERN603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/14/2016$1.7M—1206 EASTERN PARKWAY LLC → 1206 EASTERN LLC— not available
05/13/2015$1.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.705/28/2025
CHOSEN MEP, CORP.402/24/2025
TOHFAZ UDDIN PE PC510/10/2024
BLACK SHEEP ENGINEERING GROUP110/10/2024
KZ ENGINEERING, P.C109/12/2024
BGM ENGINEERING503/19/2024
PAUL PERDEK, PROF. ENG. PLLC101/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VADEM BRODSKY803/21/2026
ELLIPSES DESIGN503/21/2026
AE DESIGN SOLUTION203/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HLB CONSTRUCTION CORPGeneral Contractor2607/08/2026
PRECISION HOIST & SCAFFO*General Contractor1407/08/2026
COUNTYWIDE BUILDERS INCGeneral Contractor807/08/2026
CREATIVE PLUMBING INPlumbing307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor303/21/2026
JONATHAN MANAGER LLCGeneral Contractor303/21/2026
MASTER INSIDE CORPGeneral Contractor103/22/2026
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
GREEN STAR ELECTL CONT INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514805/28/2025
KZ ENGINEERING, P.C.4665109/12/2024
TOHFAZ UDDIN P.E.2001106/16/2024
Building Lifecycle
All (182)Filed (24)Permit Issued (30)Signed Off (15)Violation (13)Inspection (8)Objection (62)Special Inspection (30)
06/26/2026
Violation issued (ECB, open)
Elevators
06/06/2025
Special inspection requirement — Fenestration air leakage
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Lighting in dwelling units
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Exterior lighting power
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Air barrier - visual inspection
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Interior lighting power
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Lighting controls
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Electrical motors and elevators
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Insulation placement and R values
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Protection of exposed foundation insulation
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Metering
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Fenestration areas
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
RAUL VELASQUEZ MARTINEZ
06/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RAUL VELASQUEZ MARTINEZ
05/28/2025
Filed — New Building
PROPOSED NEW 8 STORY + CELLAR MIXED USE BUILDING. PROPOSED 25 DWELLING UNITS AND COMMUNITY FACILITY AT GROUND FLOOR.
B00753885-P4
05/28/2025
Special inspection requirement — Fenestration air leakage
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Lighting in dwelling units
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Exterior lighting power
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Metering
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Air barrier - visual inspection
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Interior lighting power
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Protection of exposed foundation insulation
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Insulation placement and R values
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Electrical motors and elevators
RAUL VELASQUEZ MARTINEZ
05/28/2025
Special inspection requirement — Lighting controls
RAUL VELASQUEZ MARTINEZ
04/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2025
Filed — New Building
PROPOSED NEW 8 STORY + CELLAR MIXED USE BUILDING. PROPOSED 25 DWELLING UNITS AND COMMUNITY FACILITY AT GROUND FLOOR.
B00753885-P3
03/20/2025
Signed off — Alteration
Plumbing/Sprinkler plans in conjunction with nb B00753885
B01019392-I1
03/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Signed off — Alteration
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01066224-I1
03/12/2025
Signed off — Alteration
B01019186-I1
03/12/2025
Signed off — Alteration
B00616636-I1
03/10/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/05/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/27/2025
Permit issued — Curb Cut
B00616636-I1-CC
02/24/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01066226-I1
02/24/2025
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01066223-I1
02/24/2025
Filed — Alteration
Plumbing/Sprinkler plans in conjunction with nb B00753885
B01019392-P3
02/24/2025
Signed off — Alteration
Installation of temporary storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01124846-I1
02/24/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01063298-I1
02/21/2025
Permit issued — General Construction
B00753885-I1-GC
02/20/2025
Signed off — Alteration
B00538722-I1
02/20/2025
Signed off — New Building
PROPOSED NEW 8 STORY + CELLAR MIXED USE BUILDING. PROPOSED 25 DWELLING UNITS AND COMMUNITY FACILITY AT GROUND FLOOR.
B00753885-S1
02/17/2025
Objection resolved — Addressed
02/12/2025
Objection raised — Other
02/12/2025
Objection resolved — Addressed
02/12/2025
Objection resolved — Addressed
02/12/2025
Objection resolved — Addressed
02/12/2025
Objection resolved — Addressed
01/24/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/24/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJONATHAN MANAGER LLC02/27/2025
DOB NOWGeneral ConstructionPermit IssuedCOUNTYWIDE BUILDERS INC02/21/2025
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP12/16/2024
DOB NOWMechanical SystemsSigned-offCOUNTYWIDE BUILDERS INC11/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*10/11/2024
DOB NOWSuspended ScaffoldSigned-offPRECISION HOIST & SCAFFO*09/16/2024
DOB NOWPlumbingSigned-offMETFLOW FIRE CONTROL LLC08/06/2024
DOB NOWGeneral ConstructionPermit IssuedCOUNTYWIDE BUILDERS INC07/08/2024
DOB NOWSprinklersSigned-offAB PLUMBING INC06/20/2024
DOB NOWStructuralSigned-offCOUNTYWIDE BUILDERS INC06/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*06/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*06/17/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*06/17/2024
DOB NOWGeneral ConstructionPermit IssuedCOUNTYWIDE BUILDERS INC06/13/2024
DOB NOWConstruction FenceSigned-offCOUNTYWIDE BUILDERS INC06/11/2024
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*06/10/2024
DOB NOWConstruction FenceSigned-offHLB CONSTRUCTION CORP04/24/2024
DOB NOWGeneral ConstructionPermit IssuedHLB CONSTRUCTION CORP04/22/2024
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP04/19/2024
DOB NOWSupport of ExcavationSigned-offHLB CONSTRUCTION CORP04/17/2024
DOB NOWSupport of ExcavationSigned-offHLB CONSTRUCTION CORP04/14/2023
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP04/14/2023
DOB NOWConstruction FenceSigned-offHLB CONSTRUCTION CORP01/25/2023
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP01/14/2023
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP01/03/2023
DOB NOWConstruction FenceSigned-offHLB CONSTRUCTION CORP12/21/2022
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP06/14/2022
DOB NOWSupport of ExcavationSigned-offHLB CONSTRUCTION CORP06/03/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/31/2022
DOB NOWConstruction FenceSigned-offHLB CONSTRUCTION CORP12/29/2021
BIS—ISSUEDHLB CONSTRUCTION CORP05/18/2022
6 projects · most recent 01/02/2025
General Wiring
FiledStatusContractorScope
01/02/2025CompleteDENALI ELECTRIC CORP—
10/01/2024CompleteKWONG MING ELECTRIC INC—
07/25/2024CompleteGREEN STAR ELECTL CONT IN—
07/25/2024CompleteGREEN STAR ELECTL CONT INGeneral Wiring
06/11/2024CompleteNASH ELECTRIC SERVICES IN—
11/15/2022CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 05/28/2025
Concrete
FiledStatusContractorScope
05/28/2025Permit IssuedCOUNTYWIDE BUILDERS INCConcrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/24/2025Pass-Final PL - UndergroundPassView ↗
01/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/06/2025Fenestration air leakageRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Lighting in dwelling unitsRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Exterior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Air barrier - visual inspectionRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Interior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Lighting controlsRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Fenestration and door U-factor and product ratingsRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Electrical motors and elevatorsRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Insulation placement and R valuesRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Protection of exposed foundation insulationRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025MeteringRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Fenestration areasRAUL VELASQUEZ MARTINEZenergy_progress
06/06/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
06/06/2025Alternative Materials - OTCR Buildings Bulletin NumberRAUL VELASQUEZ MARTINEZspecial
06/06/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRAUL VELASQUEZ MARTINEZspecial
05/28/2025Fenestration air leakageRAUL VELASQUEZ MARTINEZenergy_progress
05/28/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
05/28/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRAUL VELASQUEZ MARTINEZspecial
05/28/2025Lighting in dwelling unitsRAUL VELASQUEZ MARTINEZenergy_progress
05/28/2025Fenestration and door U-factor and product ratingsRAUL VELASQUEZ MARTINEZenergy_progress
05/28/2025Exterior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
05/28/2025Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
05/28/2025MeteringRAUL VELASQUEZ MARTINEZenergy_progress
05/28/2025Air barrier - visual inspectionRAUL VELASQUEZ MARTINEZenergy_progress
Latest 25 of 59.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/01/2026B00538722-I1Request digital key ↗
08/31/2026B00616636-I1Request digital key ↗
08/31/2026B00670983-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
05/20/2022340854659Open ↗
06/04/2021322095914Open ↗
▸BISWORK PERMIT APPLICATION2
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/11/2024340854659Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00753885-I1Open ↗
08/13/2026B00753885-P4Open ↗
08/13/2026B00753885-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00753885-P1Open ↗
08/13/2026B00753885-P3Open ↗
08/13/2026B00753885-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/23/2022322095914Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00753885-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/01/2026B00538722-I1Open ↗
08/31/2026B00616636-I1Open ↗
08/30/2026B00701472-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026B00753885-I1Open ↗
08/31/2026B00753885-I1Open ↗
08/31/2026B00753885-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01066226-I1Open ↗
08/31/2026B00753885-I1Open ↗
08/31/2026B00753885-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/20/2022340854659Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/20/2022340854659Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00753885-P3Open ↗
08/13/2026B00753885-I1Open ↗
08/13/2026B00753885-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist4
08/25/2026B00753885-P3Open ↗
08/25/2026B00753885-P4Open ↗
08/15/2026B00753885-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/07/2025340854659Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/20/2022340854659Open ↗
▸BISSTREET TREE CHECKLIST1
12/03/2024340854659Open ↗
▸BISSTREET TREE SIGNOFF1
03/07/2025340854659Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
05/23/2022322095914Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/23/2022322095914Open ↗
▸BISSTREET TREES SITE PLAN1
12/03/2024340854659Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00753885-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00753885-I1Open ↗
▸Environmental & Asbestos4
▸BISRODENT CONTROL2
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B01019392-I1Open ↗
08/13/2026B01019186-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00753885-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00701472-S1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
▸BISLANDMARKS APPROVAL2
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
05/23/2022322095914Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/23/2022322095914Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/23/2022322095914Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
05/23/2022322095914Open ↗
05/23/2022322095914Open ↗
06/04/2021322095914Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/03/2024340854659Open ↗
▸BISEFILING COVER SHEET1
06/04/2021322095914Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/20/2022340854659Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial4
08/13/2026B00753885-I1Open ↗
08/13/2026B00753885-P4Open ↗
08/13/2026B00753885-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00753885-P3Open ↗
08/13/2026B00753885-P1Open ↗
08/13/2026B00753885-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026B00753885-P3Open ↗
08/25/2026B00753885-P4Open ↗
08/15/2026B00753885-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/03/2024340854659Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
12/03/2024340854659Open ↗
▸BISSupporting Document: Fee Exempt1
05/23/2022322095914Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00701472-S1Open ↗
▸DOB NOWCalculations1
08/13/2026B01102813-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00753885-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00701472-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01102813-I1Open ↗