← Back
Over six families without stores
1206 HOE AVENUE
BRONX · BIN 2010628
💬 Discuss this project
1910Year Built
3Stories
C1Building Class
R7-1Zoning
4,451 sfGross Floor Area
10Units
Rent Stabilized1 Open Violation ▸
Over six families without stores · Owner of record: 1206 HOE LLC · 2,500 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof20p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 219p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Basement20p · 1 filing · 20 docs
1 job · most recent 06/26/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2024Signed-offBUILDERS GROUP USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXS12LVJU 14,400 BTU · Heat Pump Outdoor ×7
2MXS18NMVJUA 18,900 BTU · Heat Pump Outdoor ×5
RXB12BXVJU 11,300 BTU · Heat Pump Outdoor ×7
4MXS36WMVJU9 36,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 06/26/2024
Sprinkler System
FiledStatusContractorScope
06/26/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 job · most recent 06/26/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/26/2024Signed-offA. M. PLUMBING COMPANYGas, Water/Sanitary
2 jobs · most recent 08/05/2024
General Wiring
FiledStatusContractorScope
08/05/2024CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
01/11/2023CompleteALL WAYS ELECTRIC CORP.W—
1 job · most recent 06/26/2024
Wood
FiledStatusContractorScope
06/26/2024Signed-offBUILDERS GROUP USA INCWood
Building Lifecycle
All (168)Filed (15)Permit Issued (5)Signed Off (4)Violation (58)Inspection (10)Objection (46)Special Inspection (30)
08/10/2025
Violation issued (HPD, closed)
A
08/10/2025
Violation issued (HPD, closed)
B
08/10/2025
Violation issued (HPD, closed)
B
08/10/2025
Violation issued (HPD, closed)
B
08/10/2025
Violation issued (HPD, closed)
C
08/10/2025
Violation issued (HPD, closed)
C
08/10/2025
Violation issued (HPD, closed)
C
08/10/2025
Violation issued (HPD, open)
B
08/10/2025
Violation issued (HPD, closed)
B
08/10/2025
Violation issued (HPD, closed)
B
12/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
11/19/2024
Violation issued (HPD, closed)
C
09/06/2024
Signed off — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-S3
07/09/2024
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
06/26/2024
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-A1
06/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/17/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/17/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/07/2024
Signed off — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-S1
05/07/2024
Signed off — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-S2
05/03/2024
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-P9
05/01/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/01/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
04/23/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/23/2024
Special inspection requirement — Metering
FAHAD FATEH
04/23/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/23/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
04/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/23/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/23/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/23/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/23/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
04/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/23/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
04/23/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/23/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/21/2024
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-P8
04/19/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/19/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/19/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
04/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/19/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/19/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/19/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/19/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/04/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2024
Violation issued (HPD, closed)
A
03/27/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
03/25/2024
Inspection — Fail-Final SP - Up to 9 Requested Floors
Fail
View inspection ↗
03/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2024
Objection raised — Other
03/18/2024
Objection resolved — Addressed
03/12/2024
Filed — Alteration CO
SPRINKLER SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00877388-I1
X00877388-P7
Latest 60 of 168 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1206 HOE LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/23/2023$985K—Private party → 1206 HOE LLC$221/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE406/26/2024
ADB ASSOCIATES1004/21/2024
ROBERT SIQECA PE110/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor603/21/2026
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
TRUE POWER ELECL CONT LLCElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161206/26/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA11/01/2023
DOB NOWStructuralSigned-offBUILDERS GROUP USA10/25/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY09/15/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA09/14/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC09/13/2023
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
04/04/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/27/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/25/2024Fail-Final SP - Up to 9 Requested FloorsFailView ↗
03/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/22/2023Pass-Final PL - UndergroundPassView ↗
11/16/2023Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
06/17/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/17/2024Post-installed AnchorsFAHAD FATEHspecial
06/17/2024Sprinkler SystemsFAHAD FATEHspecial
05/01/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/01/2024Post-installed AnchorsFAHAD FATEHspecial
05/01/2024Sprinkler SystemsFAHAD FATEHspecial
04/23/2024Maintenance informationFAHAD FATEHenergy_progress
04/23/2024Fenestration areasFAHAD FATEHenergy_progress
04/23/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/23/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
04/23/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/23/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/23/2024Interior lighting powerFAHAD FATEHenergy_progress
04/23/2024Lighting controlsFAHAD FATEHenergy_progress
04/23/2024Fenestration air leakageFAHAD FATEHenergy_progress
04/23/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/23/2024MeteringFAHAD FATEHenergy_progress
04/23/2024Exterior lighting powerFAHAD FATEHenergy_progress
04/23/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/23/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
04/23/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/19/2024Fenestration air leakageFAHAD FATEHenergy_progress
04/19/2024Fenestration areasFAHAD FATEHenergy_progress
04/19/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
04/19/2024MeteringFAHAD FATEHenergy_progress
Latest 25 of 105.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/22/2026X00877388-P8Request digital key ↗
08/22/2026X00877388-P6Request digital key ↗
08/22/2026X00877388-P5Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00877388-I1Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature20
09/24/2026X00877388-S2Open ↗
09/24/2026X00877388-S2Open ↗
08/31/2026X00877388-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/22/2026X00877388-P7Open ↗
08/22/2026X00877388-P6Open ↗
08/22/2026X00877388-P5Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026X00877388-P2Open ↗
08/31/2026X00877388-P3Open ↗
08/29/2026X00877388-P9Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/22/2026X00877388-P8Open ↗
08/22/2026X00877388-P5Open ↗
08/22/2026X00877388-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/22/2026X00877388-P6Open ↗
08/22/2026X00877388-P5Open ↗
08/22/2026X00877388-S4Open ↗
Showing 3 of 15 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/22/2026X00877388-P8Open ↗
08/22/2026X00877388-P5Open ↗
08/22/2026X00877388-P1Open ↗
Showing 3 of 4 on file for this type