Innovative Urban Village
12074 FLATLANDS AVENUE · BIN 3429677
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction126p · 1 filing · 20 docs
Floor 14Under Construction159p · 1 filing · 20 docs
Floor 13Under Construction158p · 2 filings · 20 docs
Floor 12Under Construction170p · 2 filings · 20 docs
Floor 11Under Construction183p · 2 filings · 20 docs
Floor 10Under Construction189p · 2 filings · 20 docs
Floor 9Under Construction192p · 2 filings · 20 docs
Floor 8Under Construction189p · 2 filings · 20 docs
Floor 7Under Construction188p · 2 filings · 20 docs
Floor 6Under Construction189p · 2 filings · 20 docs
Floor 5Under Construction189p · 2 filings · 20 docs
Floor 4Under Construction297p · 2 filings · 20 docs
Floor 3Under Construction283p · 2 filings · 20 docs
Floor 2Under Construction273p · 1 filing · 20 docs
Floor 1Under Construction334p · 2 filings · 20 docs
CellarUnder Construction382p · 3 filings · 20 docs
1 job · most recent 01/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/09/2026Signed-offVERSUS PLBG AND HTG LLCStorm, Water/Sanitary
9 jobs · most recent 08/17/2026
General Wiring Lighting HVAC Wiring Boiler Controls
FiledStatusContractorScope
08/17/2026Permit IssuedB.P. ELECTRIC CORP4 meters
04/08/2026CancelledAMBER LITE ELECTRIC CORP.General Wiring, Lighting, HVAC Wiring, Boiler Controls
03/31/2026Permit IssuedITZ ELECTRIC CORP—
03/31/2026Permit IssuedITZ ELECTRIC CORP—
03/24/2026CancelledGLO ELECTRIC LLC—
03/24/2026CancelledGLO ELECTRIC LLC—
01/15/2026Permit IssuedAMBER LITE ELECTRIC CORP.—
01/09/2026Permit IssuedANTHONY G FERRY INCGeneral Wiring
10/14/2025Permit IssuedGLO ELECTRIC LLCGeneral Wiring, Lighting, HVAC Wiring, Boiler Controls
1 job · most recent 01/09/2026
Concrete
FiledStatusContractorScope
01/09/2026Signed-offMONADNOCK CONSTRUCTION INConcrete
3 jobs · most recent 05/28/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
05/28/2026Permit IssuedROCKLEDGE SCAFFOLD CORPSidewalk Shed
04/27/2026Permit IssuedCOSAN CONSTRUCTION CORPScaffold
04/08/2026Permit IssuedROCKLEDGE SCAFFOLD CORPFence
Building Lifecycle
All (216)Filed (60)Permit Issued (42)Signed Off (2)Violation (2)Inspection (20)Objection (60)Special Inspection (30)
09/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Air barrier — testing
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
08/27/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2026
Signed off — Alteration
B01350280-I1
08/12/2026
Signed off — Alteration
B01350067-I1
08/12/2026
Permit issued — Plumbing
B00851732-S6-PL
08/06/2026
Permit issued — Plumbing
B00851732-S6-PL
08/03/2026
Objection raised — Other
08/03/2026
Objection resolved — Resolved
07/30/2026
Objection raised — Other
07/30/2026
Objection resolved — Addressed
07/28/2026
Objection resolved — Addressed
07/23/2026
Objection raised — Other
07/22/2026
Permit issued — Plumbing
B00851732-S6-PL
07/13/2026
Objection resolved — Addressed
06/14/2026
Violation issued (ECB, closed)
Unknown
05/28/2026
Filed — Alteration
BLDG# 3 EQUIPMENT USE: DUAL 6000 # CAPACITY PERSONNEL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
B01313866-P4
05/28/2026
Objection raised — Other
05/27/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
05/20/2026
Filed — New Building
SPRINKLER/STANDPIPE WORK AS PER PLANS FILED
B00851732-B1
05/19/2026
Filed — New Building
SPRINKLER/STANDPIPE WORK AS PER PLANS FILED
B00851732-A9
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/30/2026
Objection resolved — Addressed
04/27/2026
Filed — Alteration
Installation of pipe scaffolding as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress or occupancy.
B01342673-P1
04/22/2026
Objection resolved — Addressed
04/13/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
04/08/2026
Filed — Alteration
BLDG# 4: CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST. FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01313851-P2
04/08/2026
Objection raised — Other
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/30/2026
Violation issued (ECB, closed)
Construction
03/26/2026
Objection raised — Other
03/20/2026
Permit issued — Protection and Mechanical Methods
B01036817-I1-PMM
Latest 60 of 216 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IUV PHASE 1B OWNER15909/13/2026
COSAN CONSTRUCTION404/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE2203/21/2026
JM ZONING, LLC.8003/21/2026
LAWRENCE K SHAPIRO ASSOCIATES403/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONADNOCK CONSTRUCTION INGeneral Contractor2407/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor907/08/2026
TT MECHANICAL CORPPlumbing408/20/2026
BUNLIN LLCGeneral Contractor304/09/2026
CMA PLUMBING & HEATING INFire Protection307/08/2026
COSAN CONSTRUCTION CORPGeneral Contractor204/09/2026
A.M. SAGE PLG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432705/20/2026
AMM ENGINEERING PC725204/27/2026
DESIMONE CONSULTING ENGIN5942612/22/2025
LANGAN ENG, ENV, SURVEYIN1265512/22/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTT MECHANICAL CORP08/12/2026
DOB NOWPlumbingPermit IssuedTT MECHANICAL CORP08/06/2026
DOB NOWPlumbingPermit IssuedTT MECHANICAL CORP07/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONADNOCK CONSTRUCTION IN03/20/2026
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP03/19/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOSAN CONSTRUCTION03/19/2026
DOB NOWProtection and Mechanical MethodsSigned-offBUNLIN LLC02/19/2026
DOB NOWProtection and Mechanical MethodsSigned-offBUNLIN LLC02/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMONADNOCK CONSTRUCTION IN02/10/2026
DOB NOWFoundationSigned-offMONADNOCK CONSTRUCTION IN02/06/2026
DOB NOWFoundationPermit IssuedMONADNOCK CONSTRUCTION IN02/06/2026
DOB NOWStructuralPermit IssuedMONADNOCK CONSTRUCTION IN02/06/2026
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP02/05/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP02/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/30/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP01/12/2026
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION01/09/2026
DOB NOWSupported ScaffoldPermit IssuedBUNLIN LLC12/19/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP12/05/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedROCKLEDGE SCAFFOLD CORP12/05/2025
DOB NOWStandpipePermit IssuedCMA PLUMBING & HEATING IN12/01/2025
DOB NOWSprinklersPermit IssuedCMA PLUMBING & HEATING IN11/28/2025
DOB NOWSprinklersPermit IssuedCMA PLUMBING & HEATING IN11/26/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK CONSTRUCTION IN11/24/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK CONSTRUCTION IN11/21/2025
DOB NOWConstruction FencePermit IssuedMONADNOCK CONSTRUCTION IN11/19/2025
DOB NOWMechanical SystemsPermit IssuedMONADNOCK CONSTRUCTION IN11/19/2025
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP11/07/2025
DOB NOWPlumbingPermit IssuedTT MECHANICAL CORP08/19/2025
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC07/16/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedMONADNOCK CONSTRUCTION IN04/07/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK CONSTRUCTION IN04/02/2025
DOB NOWSupport of ExcavationPermit IssuedMONADNOCK CONSTRUCTION IN03/24/2025
DOB NOWStructuralPermit IssuedMONADNOCK CONSTRUCTION IN02/28/2025
DOB NOWFoundationPermit IssuedMONADNOCK CONSTRUCTION IN02/27/2025
DOB NOWFoundationSigned-offMONADNOCK CONSTRUCTION IN02/27/2025
DOB NOWMechanical SystemsPermit IssuedMONADNOCK CONSTRUCTION IN12/12/2024
DOB NOWGeneral ConstructionSigned-offMONADNOCK CONSTRUCTION IN12/12/2024
DOB NOWSupport of ExcavationPermit IssuedMONADNOCK CONSTRUCTION IN12/12/2024
DOB NOWConstruction FencePermit IssuedMONADNOCK CONSTRUCTION IN12/04/2024
+ 2 more permits on file
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
09/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/24/2025No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
09/29/2025Pass-Final PL - UndergroundPassView ↗
09/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/17/2025Pass-Final PL - UndergroundPassView ↗
09/09/2025Pass-Final PL - UndergroundPassView ↗
09/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2025Pass-Final PL - UndergroundPassView ↗
07/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/27/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
08/27/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
08/27/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
08/27/2026Fenestration areasJOHN MCMONAGLEenergy_progress
08/27/2026VestibulesJOHN MCMONAGLEenergy_progress
08/27/2026Air barrier — testing JOHN MCMONAGLEenergy_progress
08/27/2026Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
08/27/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
08/27/2026Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
08/27/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
08/27/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/27/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
08/27/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
05/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
05/27/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/27/2026High-Pressure Fuel-Gas Piping (Welding)JOHN MCMONAGLEspecial
05/27/2026Post-installed AnchorsJOHN MCMONAGLEspecial
05/27/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
05/27/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
05/27/2026Maintenance informationJOHN MCMONAGLEenergy_progress
05/27/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
05/15/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/15/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/15/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
05/15/2026Maintenance informationJOHN MCMONAGLEenergy_progress
Latest 25 of 150.
▾Documents — 281 on file (BIS + DOB NOW)
▸Plans & Drawings64
▸DOB NOWPlans/Sketch64
08/27/2026B00851732-B1Request digital key ↗
08/27/2026B00851732-I1Request digital key ↗
08/27/2026B00851732-B2Request digital key ↗
Showing 3 of 64 on file for this type
▸Applications & Permits13
▸DOB NOWDEP Stormwater Construction Permit6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
05/13/2025340886802Open ↗
09/11/2024340886802Open ↗
06/15/2023340886802Open ↗
▸DOB NOWHPD - Permit Notice2
08/27/2026B00851732-I1Open ↗
Showing 1 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/24/2025340886802Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/10/2023340886802Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/27/2026B00851732-B2Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications126
▸DOB NOWSpecial Inspector Seal & Signature53
09/24/2026B00851732-P7Open ↗
09/23/2026B00851732-B2Open ↗
09/23/2026B00851732-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/14/2026B01301395-P1Open ↗
08/24/2026B01085315-I1Open ↗
08/23/2026B01145631-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/24/2026B00851732-P7Open ↗
09/24/2026B00851732-P7Open ↗
09/23/2026B00851732-B2Open ↗
Showing 3 of 35 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/10/2023340886802Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStandpipe Alarms Drawings2
08/21/2026B00864192-I1—
08/15/2026B00851732-I1—
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/27/2026B00851732-B2Open ↗
08/15/2026B00851732-I1Open ↗
08/15/2026B00851732-P2Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/15/2024340886802Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/15/2024340886802Open ↗
▸BISSTREET TREE CHECKLIST1
07/17/2024340886802Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos23
▸DOB NOWOER: Notice to Proceed21
08/27/2026B00851732-B1Open ↗
08/27/2026B00851732-B1Open ↗
08/27/2026B00851732-I1Open ↗
Showing 3 of 21 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
05/15/2024340886802Open ↗
▸DOB NOWOER: Notice of Satisfaction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWConcrete Testing Exception Report1
08/15/2026B00851732-S2Open ↗
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/17/2024340886802Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
06/24/2025340886802Open ↗
09/17/2024340886802Open ↗
05/15/2024340886802Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026B01313851-P2Open ↗
08/16/2026B01313851-P1Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/10/2023340886802Open ↗
▸Other Documents20
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/27/2026B00851732-B2Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/27/2026B00851732-B2Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/27/2026B00851732-B2Open ↗
08/15/2026B00851732-I1Open ↗
08/15/2026B00851732-P2Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/14/2023340886802Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/18/2023340886802Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD - Completion Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type