← Back
BROOKLYN
1209 CLEVELAND STREET
BROOKLYN · BIN 3430327
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Filed — no permit issued165p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CMTA312/18/2025
DE NARDIS ENGINEERING, LLC212/11/2025
MHG ARCHITECTS PC112/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
Building Lifecycle
All (46)Filed (6)Objection (10)Special Inspection (30)
07/23/2026
Special inspection requirement — Concrete - Cast-In-Place
06/25/2026
Special inspection requirement — Vestibules
06/18/2026
Objection resolved — Resolved
06/17/2026
Objection resolved — Addressed
06/17/2026
Special inspection requirement — Maintenance information
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/24/2026
Objection resolved — Resolved
03/19/2026
Objection resolved — Resolved
01/16/2026
Objection raised — Other
01/15/2026
Objection raised — Other
01/13/2026
Objection raised — Other
01/06/2026
Objection raised — Other
01/06/2026
Objection raised — Other
12/22/2025
Objection raised — Other
12/18/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299926-S4
12/18/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299926-S3
12/11/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299926-S2
12/11/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299926-S1
12/10/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299926-I1
12/10/2025
Filed — New Building
INSTALL PLUMBING WORK AS PER PLANS FILED.
B01299926-S5
10/24/2025
Special inspection requirement — Structural Steel - Welding
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/24/2025
Special inspection requirement — Sprayed fire-resistant materials
10/24/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
10/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/24/2025
Special inspection requirement — Fenestration areas
10/24/2025
Special inspection requirement — Insulation placement and R values
10/24/2025
Special inspection requirement — Protection of exposed foundation insulation
10/24/2025
Special inspection requirement — Air barrier continuity plan testing
10/24/2025
Special inspection requirement — Air barrier - visual inspection
10/24/2025
Special inspection requirement — Fenestration air leakage
10/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
10/24/2025
Special inspection requirement — Air barrier — testing
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/24/2025
Special inspection requirement — Sprinkler Systems
10/24/2025
Special inspection requirement — Standpipe Systems
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/24/2025
Special inspection requirement — Post-installed Anchors
10/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
10/24/2025
Special inspection requirement — Lighting in dwelling units
10/24/2025
Special inspection requirement — Concrete – Prestressed
10/24/2025
Special inspection requirement — Masonry
10/24/2025
Special inspection requirement — Post-installed Anchors
Nothing on file for this building.
1 project · most recent 12/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg ZRUM048GSS0 57 BTU · Vrf Outdoor ×3
1 project · most recent 12/18/2025
Sprinkler System
FiledStatusContractorScope
12/18/2025——Sprinkler System
1 project · most recent 12/18/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/18/2025——Storm, Water/Sanitary
1 project · most recent 12/18/2025
Steel Concrete Masonry
FiledStatusContractorScope
12/18/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
07/23/2026Concrete - Cast-In-Place—special
06/25/2026Vestibules—energy_progress
06/17/2026Maintenance information—energy_progress
06/17/2026HVAC-R and service water piping design and insulation—energy_progress
06/17/2026HVAC-R and service water heating equipment—energy_progress
06/17/2026HVAC-R and service water heating system controls—energy_progress
10/24/2025Structural Steel - Welding—special
10/24/2025Fire-Resistant Penetrations and Joints—special
10/24/2025Sprayed fire-resistant materials—special
10/24/2025Wall Panels, Curtain Walls, and Veneers—special
10/24/2025Energy Code Compliance Inspections—progress
10/24/2025Fire-Resistance Rated Construction—progress
10/24/2025Fenestration areas—energy_progress
10/24/2025Insulation placement and R values—energy_progress
10/24/2025Protection of exposed foundation insulation—energy_progress
10/24/2025Air barrier continuity plan testing—energy_progress
10/24/2025Air barrier - visual inspection—energy_progress
10/24/2025Fenestration air leakage—energy_progress
10/24/2025Fenestration and door U-factor and product ratings—energy_progress
10/24/2025Air barrier — testing —energy_progress
10/24/2025Fire-Resistant Penetrations and Joints—special
10/24/2025Sprinkler Systems—special
10/24/2025Standpipe Systems—special
10/24/2025Fire-Resistant Penetrations and Joints—special
10/24/2025Post-installed Anchors—special
Latest 25 of 49.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026B01299926-S4Request digital key ↗
08/19/2026B01299926-I1Request digital key ↗
08/19/2026B01299926-S5Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026B01299926-I1Open ↗
08/13/2026B01299926-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01299926-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026B01299926-I1Open ↗
08/19/2026B01299926-S4Open ↗
08/19/2026B01299926-S3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/14/2026B01299926-S1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/19/2026B01299926-S4Open ↗
08/19/2026B01299926-I1Open ↗
08/19/2026B01299926-S5Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026B01299926-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01299926-I1Open ↗