← Back
Parks / recreation facility
56-01 GRAND CENTRAL PKWY
QUEENS · BIN 4618795
💬 Discuss this project
1939Year Built
—Stories
Q1Building Class
PARKZoning
1,258,350 sfGross Floor Area
1Units
LL97 Covered36 Open Violations 9 unresolved · 27 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 17,870,000 sf lot · 0.07 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction210p · 2 filings · 20 docs
Floor 4Under Construction221p · 1 filing · 20 docs
Floor 3Under Construction221p · 1 filing · 20 docs
Floor 2Under Construction222p · 1 filing · 20 docs
Floor 1Under Construction222p · 2 filings · 20 docs
CellarUnder Construction45p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
USTA6307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PLATFORM SOLUTIONS INC1008/18/2026
MATTHEW L ROSSETTI ARCHITECT PC1407/08/2026
WSP608/25/2025
ME ENGINEERS1108/20/2025
AKRF, INC.307/21/2025
VELOCITY MONITORING & INSTRUMENTATI202/10/2025
EXDEM ENGINEERING SERVICES309/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC1403/21/2026
JAM CONSULTANTS, INC.6603/21/2026
DANICO SERVICES403/21/2026
MERCURE CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN CONSTRUCTION CORPGeneral Contractor1107/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor1009/26/2026
W5 GROUP LLCGeneral Contractor603/21/2026
NEPTUNE MECHANICAL INCPlumbing607/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection407/08/2026
ECD NY INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6872907/08/2026
WSP USA CORP1848910/20/2025
CROSSCHECK INSPECTION SER544108/29/2024
MUESER RUTLEDGE CONSULTIN977208/08/2024
Building Lifecycle
All (201)Filed (49)Permit Issued (32)Signed Off (4)Inspection (46)Objection (40)Special Inspection (30)
09/25/2026
Permit issued — Construction Fence
Q01299605-I1-FN
09/03/2026
Permit issued — Protection and Mechanical Methods
Q01289922-I1-PMM
09/03/2026
Permit issued — Sidewalk Shed
Q01285147-I1-SH
08/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01285147-P2
08/17/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
Q01285147-P1
08/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Q01299605-P2
08/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2026
Filed — New Building
Foundation work in conjunction with new building construction
Q01061043-Z9
07/07/2026
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2026
Permit issued — Mechanical Systems
Q01061043-S8-MS
05/13/2026
Permit issued — Standpipe
Q01061043-Z2-EW-SP
05/13/2026
Permit issued — Standpipe
Q01061043-Z2-EW-SD
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2026
Permit issued — Plumbing
Q01061043-S5-PL
02/26/2026
Permit issued — Structural
Q01061043-S2-ST
02/25/2026
Permit issued — General Construction
Q01061043-I1-GC
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/19/2026
Special inspection requirement — Protection of exposed foundation insulation
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Walter Kaeck
02/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Insulation placement and R values
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Fenestration areas
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Lowest Floor Elevation
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Fenestration air leakage
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
02/19/2026
Special inspection requirement — Air barrier - visual inspection
RICHARD GREENWALD
01/30/2026
Objection resolved — Addressed
01/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR NEW BUILDING CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Q01118558-I1
01/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Q01299605-P1
01/06/2026
Signed off — New Building
Foundation work in conjunction with new building construction
Q01061043-S4
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2025
Objection resolved — Addressed
12/04/2025
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
12/04/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
12/04/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
12/02/2025
Filed — Alteration
INSTALLATION OF A TEMPORARY PERSONNEL HOIST AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HOIST SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
Q01309939-P1
12/01/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
12/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Heating Systems
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Lighting controls
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
12/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Maintenance information
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
12/01/2025
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
RICHARD GREENWALD
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPLATFORM SOLUTIONS, INC09/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATFORM SOLUTIONS, INC09/03/2026
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC09/03/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN CONSTRUCTION CORP05/15/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC05/13/2026
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC05/13/2026
DOB NOWPlumbingPermit IssuedNEPTUNE MECHANICAL INC03/04/2026
DOB NOWStructuralPermit IssuedTISHMAN CONSTRUCTION CORP02/26/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP02/25/2026
DOB NOWSupported ScaffoldPermit IssuedPLATFORM SOLUTIONS, INC11/24/2025
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC11/24/2025
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP11/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATFORM SOLUTIONS, INC10/29/2025
DOB NOWConstruction FencePermit IssuedPLATFORM SOLUTIONS, INC10/08/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATFORM SOLUTIONS, INC09/19/2025
DOB NOWSidewalk ShedPermit IssuedPLATFORM SOLUTIONS, INC09/12/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC05/14/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC05/14/2025
DOB NOWMechanical SystemsPermit IssuedTISHMAN CONSTRUCTION CORP05/06/2025
DOB NOWFoundationSigned-offTISHMAN CONSTRUCTION CORP05/06/2025
DOB NOWEarth WorkPermit IssuedTISHMAN CONSTRUCTION CORP04/30/2025
DOB NOWPlumbingPermit IssuedNEPTUNE MECHANICAL INC03/25/2025
DOB NOWPlumbingPermit IssuedNEPTUNE MECHANICAL INC03/11/2025
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP03/06/2025
DOB NOWStructuralPermit IssuedTISHMAN CONSTRUCTION CORP02/25/2025
DOB NOWGeneral ConstructionPermit IssuedTISHMAN CONSTRUCTION CORP02/21/2025
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC12/23/2024
DOB NOWFoundationSigned-offTISHMAN CONSTRUCTION CORP10/31/2024
DOB NOWFull DemolitionSigned-offW5 GROUP LLC10/17/2024
DOB NOWConstruction FenceSigned-offECD NY INC10/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offW5 GROUP LLC09/24/2024
DOB NOWConstruction FenceSigned-offW5 GROUP LLC09/23/2024
BISPLISSUEDJ.E.S. PLBG & HTG CORP08/13/2014
BIS—ISSUEDW.J. NORTHRIDGE CONST COR08/06/2014
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP10/26/2004
BIS—ISSUEDANCHOR BREAK & CUTTING.CO08/20/2004
1 project · most recent 07/08/2026
Sprinkler System
FiledStatusContractorScope
07/08/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSprinkler System
1 project · most recent 07/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/08/2026Permit IssuedNEPTUNE MECHANICAL INCGas, Storm, Water/Sanitary
9 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedTUXEDO ELEC'L CONTR'G INC—
03/02/2026Permit IssuedENOK ELECTRICAL CO LLC—
12/11/2025Permit IssuedTEAM ELECTRIC, INCGeneral Wiring
12/05/2025Permit IssuedTEAM ELECTRIC, INCGeneral Wiring
10/21/2025Permit IssuedSOLAS ELECTRICAL CORP—
09/26/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
09/24/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
05/06/2024Permit IssuedTUXEDO ELEC'L CONTR'G INC—
03/23/2023Permit IssuedTUXEDO ELEC'L CONTR'G INC—
1 project · most recent 07/08/2026
Concrete
FiledStatusContractorScope
07/08/2026Permit IssuedTISHMAN CONSTRUCTION CORPConcrete
2 projects · most recent 08/18/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/18/2026Permit IssuedPLATFORM SOLUTIONS, INCSidewalk Shed
08/17/2026Permit IssuedPLATFORM SOLUTIONS, INCFence
▾Field Inspections (DOB CAP) — 46
DateTypeResultReport
08/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/28/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/17/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/15/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
Latest 25 of 46.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/07/2026Sprinkler SystemsRICHARD GREENWALDspecial
02/19/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
02/19/2026Lowest Floor ElevationRICHARD GREENWALDprogress
02/19/2026Protection of exposed foundation insulationRICHARD GREENWALDenergy_progress
02/19/2026Insulation placement and R valuesRICHARD GREENWALDenergy_progress
02/19/2026Fenestration and door U-factor and product ratingsRICHARD GREENWALDenergy_progress
02/19/2026Air barrier - visual inspectionRICHARD GREENWALDenergy_progress
02/19/2026Fenestration areasRICHARD GREENWALDenergy_progress
02/19/2026Subsurface Investigations (Borings/Test Pits)Walter Kaeckspecial
02/19/2026Fenestration air leakageRICHARD GREENWALDenergy_progress
02/19/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
12/04/2025Post-installed AnchorsRICHARD GREENWALDspecial
12/04/2025Sprinkler SystemsRICHARD GREENWALDspecial
12/04/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
12/04/2025Standpipe SystemsRICHARD GREENWALDspecial
12/01/2025Mechanical SystemsRICHARD GREENWALDspecial
12/01/2025Lighting controlsRICHARD GREENWALDenergy_progress
12/01/2025Shutoff dampersRICHARD GREENWALDenergy_progress
12/01/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
12/01/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
12/01/2025Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
12/01/2025Maintenance informationRICHARD GREENWALDenergy_progress
12/01/2025FinalRICHARD GREENWALDprogress
12/01/2025Interior lighting powerRICHARD GREENWALDenergy_progress
12/01/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
Latest 25 of 150.
▾Documents — 479 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch49
08/21/2026Q01102222-S1Request digital key ↗
08/21/2026Q01102222-S2Request digital key ↗
08/21/2026Q01102222-I1Request digital key ↗
Showing 3 of 49 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION15
09/13/2022420925119Open ↗
12/15/2021401969036Open ↗
11/29/2021401969036Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP Stormwater Construction Permit4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
08/25/2014420925119Open ↗
08/15/2014420925119Open ↗
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
09/03/2014420925119Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/19/2026Q01061043-P5Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026Q01061043-I1Open ↗
Showing 1 of 3 on file for this type
▸BISVERIFY TAX LOT1
11/01/2022420925119Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/09/2022420925119Open ↗
▸BISZONING DIAGRAM1
03/26/2014420925119Open ↗
▸Seals & Professional Certifications205
▸DOB NOWSpecial Inspector Seal & Signature74
09/28/2026Q01061043-B5Open ↗
09/28/2026Q01061043-B5Open ↗
09/28/2026Q01061043-B5Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWProgress Inspector Seal & Signature69
09/27/2026Q01061043-P8Open ↗
09/27/2026Q01061043-P8Open ↗
09/27/2026Q01061043-P8Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature50
08/21/2026Q01102222-S1Open ↗
08/21/2026Q01102222-S2Open ↗
08/21/2026Q01102222-I1Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
12/18/2014420925119Open ↗
09/06/2014420925119Open ↗
09/06/2014420925119Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment24
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
08/19/2026Q01061043-P5Open ↗
08/19/2026Q01061043-S7Open ↗
08/19/2026Q01061043-S6Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
06/05/2015420925119Open ↗
10/27/2014420925119Open ↗
10/27/2014420925119Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
12/14/2022420925119Open ↗
10/07/2022420925119Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/15/2014420925119Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/07/2022420925119Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
03/26/2014420925119Open ↗
▸BISSCHEDULE B - PLUMBING1
11/23/2013420925119Open ↗
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWElectric Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
11/23/2013420925119Open ↗
▸BISSTREET TREE SIGNOFF1
11/01/2022420925119Open ↗
▸BISSTREET TREES SITE PLAN1
11/01/2022420925119Open ↗
▸Environmental & Asbestos1
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/28/2015420925119Open ↗
05/28/2015420925119Open ↗
08/13/2014420925119Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/29/2022420925119Open ↗
10/05/2021420925119Open ↗
▸BISFENESTRATION AREAS1
10/07/2022420925119Open ↗
▸BISAIR SEALING AND INSULATION-VISUAL1
10/07/2022420925119Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/07/2022420925119Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/23/2021420925119Open ↗
▸Inspections & Test Reports11
▸DOB NOWSOIL REPORT3
08/19/2026Q01061043-I1Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/09/2014420925119Open ↗
06/04/2014420925119Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
10/25/2018420925119Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/26/2014420925119Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/06/2014420925119Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/23/2021420925119Open ↗
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs98
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter49
08/21/2026Q01118558-P1Open ↗
08/21/2026Q01118558-I1Open ↗
Showing 2 of 49 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)32
08/19/2026Q01061043-P4Open ↗
08/19/2026Q01061043-P3Open ↗
08/19/2026Q01061043-P1Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
10/25/2018420925119Open ↗
10/25/2018420925119Open ↗
10/25/2018420925119Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/29/2018420925119Open ↗
10/25/2018420925119Open ↗
08/02/2017420925119Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
11/23/2013420925119Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
11/23/2013420925119Open ↗
▸DOB NOWDCLA Approval of Artwork1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/15/2014420925119Open ↗
▸BISCOST AFFIDAVIT1
11/23/2013420925119Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
11/23/2013420925119Open ↗
11/23/2013420925119Open ↗
11/23/2013420925119Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
08/03/2021420925119Open ↗
10/02/2018420925119Open ↗
04/24/2018420925119Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/29/2018420925119Open ↗
04/24/2018420925119Open ↗
▸Other Documents32
▸DOB NOWSite Survey: Initial10
08/19/2026Q01061043-S7Open ↗
08/19/2026Q01061043-S6Open ↗
08/19/2026Q01061043-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026Q01102222-I1Open ↗
08/19/2026Q01061043-P5Open ↗
08/19/2026Q01061043-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
11/29/2021401969036Open ↗
11/29/2021401969036Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
10/24/2014420925119Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type