← Back
Two family converted from one family
121-15 GUY R BREWER BOULEVARD
QUEENS · BIN 4624717
💬 Discuss this project
1930Year Built
1.75Stories
B3Building Class
R3AZoning
1,750 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family converted from one family · Owner of record: 121-15 GUY BREWER BLVD. ASSOC. INC. · 5,065 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIDERIS KEFALAS ENGINEERS PC204/29/2025
RAS PE CONSULTING ENGINEERS302/04/2025
GERALD CALIENDO ARCHITECTS307/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KDK CONSTRUCTION CORPGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495106/14/2023
Building Lifecycle
All (74)Filed (8)Permit Issued (2)Objection (34)Special Inspection (30)
11/10/2025
Permit issued — General Construction
Q00885306-I1-GC
10/10/2025
Permit issued — Construction Fence
Q00885306-S1-FN
06/05/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Scope
05/07/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/29/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S7
04/03/2025
Objection resolved — Addressed
03/25/2025
Objection raised — Energy
03/17/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S6
03/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/13/2025
Special inspection requirement — Maintenance information
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/25/2025
Objection resolved — Addressed
02/25/2025
Objection resolved — Addressed
02/13/2025
Objection raised — Scope
02/13/2025
Objection raised — Inspections
02/04/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S3
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/27/2025
Objection raised — Admin
01/27/2025
Objection raised — Structural
01/27/2025
Objection raised — Structural
01/27/2025
Objection raised — Structural
01/27/2025
Objection raised — Structural
01/27/2025
Objection raised — Structural
01/24/2025
Objection raised — Structural
01/24/2025
Objection raised — Structural
01/21/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S4
01/21/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S5
12/20/2024
Special inspection requirement — Masonry
12/20/2024
Special inspection requirement — Structural Cold-Formed Steel
12/20/2024
Special inspection requirement — Structural Steel - Details
12/20/2024
Special inspection requirement — Designated Seismic System
12/20/2024
Special inspection requirement — Masonry
12/20/2024
Special inspection requirement — Subgrade Inspections
12/20/2024
Special inspection requirement — Concrete - Cast-In-Place
12/18/2024
Special inspection requirement — Final
12/18/2024
Special inspection requirement — Footing and Foundation
12/18/2024
Special inspection requirement — Final
08/31/2023
Objection resolved — Addressed
08/25/2023
Objection resolved — Addressed
08/01/2023
Objection raised — Other
08/01/2023
Objection resolved — Addressed
07/31/2023
Objection raised — Other
07/21/2023
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S1
07/21/2023
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # Q00885306.
Q00885306-S2
07/21/2023
Special inspection requirement — Metering
Rajasekhar Sakhamuri
07/21/2023
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
06/26/2023
Objection raised — Other
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection raised — Other
06/26/2023
Objection resolved — Addressed
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKDK CONSTRUCTION CORP11/10/2025
DOB NOWConstruction FencePermit IssuedKDK CONSTRUCTION CORP10/10/2025
1 project · most recent 04/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2025Permit IssuedKDK CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA4 22,000 BTU · Vrf Outdoor ×1
SUZ-KP24NAH2 24,000 BTU · Condensing Unit ×1
SUZ-KP36NAH2 33,400 BTU · Condensing Unit ×1
1 project · most recent 04/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
04/29/2025——Storm, Water/Sanitary
1 project · most recent 04/29/2025
Steel
FiledStatusContractorScope
04/29/2025Permit IssuedKDK CONSTRUCTION CORPSteel
1 project · most recent 04/29/2025
Fence
FiledStatusContractorScope
04/29/2025Permit IssuedKDK CONSTRUCTION CORPFence
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
03/13/2025HVAC-R and service water heating system controls—energy_progress
03/13/2025HVAC-R and service water piping design and insulation—energy_progress
03/13/2025HVAC-R and service water heating equipment—energy_progress
03/13/2025Maintenance information—energy_progress
03/13/2025Fire-Resistant Penetrations and Joints—special
03/13/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
12/20/2024Masonry—special
12/20/2024Structural Cold-Formed Steel—special
12/20/2024Structural Steel - Details—special
12/20/2024Designated Seismic System—special
12/20/2024Masonry—special
12/20/2024Subgrade Inspections—special
12/20/2024Concrete - Cast-In-Place—special
12/18/2024Final—progress
12/18/2024Footing and Foundation—progress
12/18/2024Final—progress
07/21/2023MeteringRajasekhar Sakhamurienergy_progress
07/21/2023Permanent certificateRajasekhar Sakhamurienergy_progress
06/14/2023Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
06/14/2023Interior lighting powerRajasekhar Sakhamurienergy_progress
06/14/2023Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
06/14/2023Maintenance informationRajasekhar Sakhamurienergy_progress
06/14/2023Electric vehicle service equipment requirementsRajasekhar Sakhamurienergy_progress
06/14/2023Fenestration areasRajasekhar Sakhamurienergy_progress
06/14/2023Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
Latest 25 of 34.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q00885306-S6Request digital key ↗
08/20/2026Q00885306-I1Request digital key ↗
08/20/2026Q00885306-S7Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/30/2023440791797Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/30/2023440791797Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00885306-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
08/23/2026Q00885306-I1Open ↗
08/23/2026Q00885306-I1Open ↗
08/23/2026Q00885306-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026Q00885306-S3Open ↗
08/13/2026Q00885306-S4Open ↗
08/13/2026Q00885306-S7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026Q00885306-I1Open ↗
08/23/2026Q00885306-I1Open ↗
08/23/2026Q00885306-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/30/2023440791797Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00885306-I1Open ↗
▸Safety & Tenant Protection4
▸BISBPP: STREET TREES SITE PLAN1
09/14/2023440791797Open ↗
▸BISSTREET TREE CHECKLIST1
09/14/2023440791797Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00885306-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00885306-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISDOB APPROVAL FOR NEW CC1
09/14/2023440791797Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2023440791797Open ↗
▸Other Documents8
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00885306-S3Open ↗
08/13/2026Q00885306-S4Open ↗
▸BISBPP: GRADE STUDY1
09/14/2023440791797Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
09/14/2023440791797Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/14/2023440791797Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00885306-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00885306-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00885306-I1Open ↗