Two family frame
121-31 199 STREET
QUEENS · St. Albans · BIN 4273494
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3AZoning
2,200 sfGross Floor Area
2Units
Two family frame · 8,960 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC206/26/2026
BAZINI ENGINEERING, P.C.207/01/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NULITE FUEL OIL CO., LTDGeneral Contractor307/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272206/26/2026
BAZINI ENGINEERING, P.C.1808207/01/2024
Building Lifecycle
All (20)Filed (4)Permit Issued (3)Signed Off (1)Special Inspection (12)
07/01/2026
Special inspection requirement — Final
Walid Abdulla
07/01/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/26/2026
Filed — Alteration
Q01399446-P1
06/19/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/19/2026
Special inspection requirement — Final
Walid Abdulla
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/18/2026
Permit issued — Solar
Q01399446-I1-SL
05/12/2026
Filed — Alteration
Q01399446-I1
07/11/2025
Signed off — Alteration
REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01041006-I1
04/23/2025
Permit issued — Mechanical Systems
Q01041006-I1-MS
07/01/2024
Filed — Alteration
REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01041006-P1
06/26/2024
Special inspection requirement — Final
Joseph Bazini
06/26/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
05/23/2024
Permit issued — Mechanical Systems
Q01041006-I1-MS
05/06/2024
Filed — Alteration
REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01041006-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/18/2026
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD04/23/2025
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD05/23/2024
2 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
05/12/2026CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/01/2026FinalWalid Abdullaprogress
07/01/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/01/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/01/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/01/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/19/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
06/19/2026Energy Code Compliance InspectionsWalid Abdullaprogress
06/19/2026FinalWalid Abdullaprogress
06/19/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/19/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/26/2024FinalJoseph Baziniprogress
06/26/2024Mechanical SystemsJoseph Bazinispecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q01041006-I1Request digital key ↗
08/22/2026Q01041006-P1Request digital key ↗
08/16/2026Q01399446-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
09/20/2026Q01399446-I1Open ↗
09/20/2026Q01399446-I1Open ↗
09/20/2026Q01399446-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/20/2026Q01399446-I1Open ↗
09/20/2026Q01399446-I1Open ↗
09/18/2026Q01399446-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026Q01041006-I1Open ↗
08/16/2026Q01399446-P1Open ↗
08/16/2026Q01399446-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026Q01041006-I1Open ↗
08/16/2026Q01399446-P1Open ↗
08/16/2026Q01399446-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026Q01399446-I1Open ↗