2 Open Violations 0 unresolved · 2 paperwork only▸
ECB05/09/2011WORK W/O A PERMIT. WORK NOTED: AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS FOR 1 ROOM,BATHROOM ENCLOSURE & INSTALLED WATER & WASTE LINES FOR 3PC BATHROOM (SHOWER,TOILET,SINK) & RESIDENTIAL SINK. REMEDY: OBTANothing owed — awaiting certificate of correction
ECB04/01/2011ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID C OF O AS PER 28-118.3.128-118.3.2. NOTED: JOB #402569270 ALT TYPE I. "PROPOSED REAR 2ND BEDROOM ADDITION" W/PERMIT ENTIRE. PREMISES IS NOW OCCUPIED W/O SIGNED OFF.Nothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,100 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.