121 DIVISION STREET
MANHATTAN · BIN 1003609
💬 Discuss this project
1910Year Built
3Stories
K4Building Class
C6-2Zoning
—Gross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 210p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
D.A.D. LLC403/22/2026
D.A.D.LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
I-BEAM DESIGN206/11/2025
REAL CREATIVE MOTION ENGINEERING SE504/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FS CONTRACTING CORPGeneral Contractor207/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247706/11/2025
Building Lifecycle
All (73)Filed (7)Permit Issued (3)Signed Off (3)Violation (2)Inspection (7)Objection (21)Special Inspection (30)
03/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/10/2026
Signed off — Alteration CO
ALTERATION FILED TO CHANGE USE AND OCCUPANCY ON THE 2ND FLOOR .
M01076772-I1
10/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
07/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Sunil Saigal
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
07/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Sunil Saigal
07/16/2025
Special inspection requirement — Lighting in dwelling units
Sunil Saigal
07/03/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Admin
06/11/2025
Filed — Alteration CO
ALTERATION FILED TO CHANGE USE AND OCCUPANCY ON THE 2ND FLOOR .
M01076772-P2
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
06/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Sunil Saigal
06/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Sunil Saigal
06/09/2025
Special inspection requirement — Lighting in dwelling units
Sunil Saigal
05/15/2025
Signed off — Alteration
REPLACE EXISTING HEATING, VENTILATION,AND COOLING (HVAC) SYSTEM ON 2NDFLOOR NEW APARTMENT. THE WORK IS AS AS PER SUBMITTED PLANS
M01178081-I1
05/13/2025
Signed off — Alteration CO
ALTERATION FILED TO CHANGE USE AND OCCUPANCY ON THE 2ND FLOOR .
M01076772-S1
05/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2025
Permit issued — Mechanical Systems
M01178081-I1-MS
05/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2025
Special inspection requirement — Mechanical Systems
Sunil Saigal
04/14/2025
Special inspection requirement — Final
Mmdoh Megale
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
04/04/2025
Filed — Alteration
REPLACE EXISTING HEATING, VENTILATION,AND COOLING (HVAC) SYSTEM ON 2NDFLOOR NEW APARTMENT. THE WORK IS AS AS PER SUBMITTED PLANS
M01178081-P1
04/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Sunil Saigal
04/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sunil Saigal
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
04/03/2025
Special inspection requirement — Mechanical Systems
Sunil Saigal
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
04/03/2025
Special inspection requirement — Final
Sunil Saigal
04/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Sunil Saigal
03/18/2025
Filed — Alteration CO
ALTERATION FILED TO CHANGE USE AND OCCUPANCY ON THE 2ND FLOOR .
M01076772-P1
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sunil Saigal
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Sunil Saigal
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Sunil Saigal
02/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/08/2025
Filed — Alteration
REPLACE EXISTING HEATING, VENTILATION,AND COOLING (HVAC) SYSTEM ON 2NDFLOOR NEW APARTMENT. THE WORK IS AS AS PER SUBMITTED PLANS
M01178081-I1
01/21/2025
Objection resolved — Resolved
01/17/2025
Objection resolved — Resolved
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
12/30/2024
Objection raised — Accessibility
12/17/2024
Objection resolved — Resolved
12/11/2024
Objection raised — Accessibility
12/11/2024
Objection raised — Accessibility
11/27/2024
Permit issued — Plumbing
M01076772-S1-PL
11/26/2024
Permit issued — General Construction
M01076772-I1-GC
11/26/2024
Objection raised — Accessibility
11/03/2024
Objection resolved — Addressed
10/28/2024
Objection raised — Accessibility
10/23/2024
Objection resolved — Addressed
10/11/2024
Objection raised — Accessibility
10/08/2024
Filed — Alteration CO
ALTERATION FILED TO CHANGE USE AND OCCUPANCY ON THE 2ND FLOOR .
M01076772-S2
10/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Sunil Saigal
10/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Sunil Saigal
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFS CONTRACTING CORP05/06/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS11/27/2024
DOB NOWGeneral ConstructionPermit IssuedFS CONTRACTING CORP11/26/2024
BISPLISSUEDFLINT MECHANICAL CORP12/18/2018
BISFPISSUEDMEGA MECHANICAL INC12/05/2018
BISPLISSUEDFLINT MECHANICAL CORP01/12/2017
BISFPISSUEDMEGA MECHANICAL INC12/06/2016
BISEQISSUEDMEGA MECHANICAL INC12/06/2016
1 project · most recent 06/11/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/11/2025Permit IssuedFS CONTRACTING CORPHeating and Air Conditioning Systems
Heat / Cool
York TG8S080B12M911 64,000 BTU · Furnace ×1
YFD36B21S 36,000 BTU · Fan Coil Indoor ×1
1 project · most recent 06/11/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/11/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
3 projects · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025CompleteACCURATE ELEC'L CORP.General Wiring
11/03/2025CompleteACCURATE ELEC'L CORP.General Wiring
04/03/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/16/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
07/16/2025Fire-Resistance Rated ConstructionSunil Saigalprogress
07/16/2025Energy Code Compliance InspectionsSunil Saigalprogress
07/16/2025Fenestration and door U-factor and product ratingsSunil Saigalenergy_progress
07/16/2025Lighting in dwelling unitsSunil Saigalenergy_progress
06/09/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
06/09/2025Energy Code Compliance InspectionsSunil Saigalprogress
06/09/2025Fire-Resistance Rated ConstructionSunil Saigalprogress
06/09/2025Fenestration and door U-factor and product ratingsSunil Saigalenergy_progress
06/09/2025Lighting in dwelling unitsSunil Saigalenergy_progress
04/14/2025Mechanical SystemsSunil Saigalspecial
04/14/2025FinalMmdoh Megaleprogress
04/14/2025Energy Code Compliance InspectionsSunil Saigalprogress
04/14/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
04/03/2025HVAC-R and service water heating equipmentSunil Saigalenergy_progress
04/03/2025HVAC-R and service water piping design and insulationSunil Saigalenergy_progress
04/03/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
04/03/2025Mechanical SystemsSunil Saigalspecial
04/03/2025Energy Code Compliance InspectionsSunil Saigalprogress
04/03/2025FinalSunil Saigalprogress
04/03/2025HVAC-R and service water heating system controlsSunil Saigalenergy_progress
02/26/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
02/26/2025Energy Code Compliance InspectionsSunil Saigalprogress
02/26/2025HVAC-R and service water piping design and insulationSunil Saigalenergy_progress
02/26/2025HVAC-R and service water heating equipmentSunil Saigalenergy_progress
Latest 25 of 33.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026M01076772-S1Request digital key ↗
08/26/2026M01076772-P2Request digital key ↗
08/26/2026M01076772-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION9
08/27/2019123737698Open ↗
04/17/2019123737698Open ↗
02/01/2019140581430Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION8
12/19/2018140820324Open ↗
12/05/2018140581430Open ↗
11/29/2018140820324Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01076772-P2Open ↗
08/13/2026M01076772-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature10
09/05/2026M01076772-P1Open ↗
09/05/2026M01076772-P1Open ↗
08/27/2026M01076772-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026M01178081-I1Open ↗
08/24/2026M01178081-P1Open ↗
08/13/2026M01076772-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/05/2026M01076772-P1Open ↗
08/27/2026M01076772-P2Open ↗
08/26/2026M01178081-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/04/2019140581430Open ↗
02/04/2019140581430Open ↗
02/04/2019140820324Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/22/2019140820324Open ↗
10/31/2018140581430Open ↗
04/27/2017140581430Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/04/2019140581430Open ↗
02/04/2019140581430Open ↗
▸BISEQUIPMENT USE PERMITS1
02/04/2019140581430Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/04/2019140820324Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M01076772-I1Open ↗
08/13/2026M01076772-P2Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026M01178081-I1Open ↗
08/24/2026M01178081-P1Open ↗
08/13/2026M01076772-S2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/04/2019140581430Open ↗
02/04/2019140581430Open ↗
02/04/2019140820324Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/04/2019140581430Open ↗
02/04/2019140820324Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/29/2018140820324Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/04/2019140581430Open ↗
02/04/2019140820324Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/17/2019123737698Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/17/2019123737698Open ↗
02/04/2019140581430Open ↗
11/29/2018140820324Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms12
▸BISBOROUGH INTAKE FORM6
08/27/2019123737698Open ↗
02/04/2019140581430Open ↗
02/04/2019140820324Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
01/31/2019140581430Open ↗
01/22/2019140820324Open ↗
04/27/2017140581430Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/29/2018140820324Open ↗
12/02/2016140581430Open ↗
▸BISEFILING COVER SHEET1
04/17/2019123737698Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/13/2026M01076772-I1Open ↗
08/13/2026M01076772-P2Open ↗
▸BISPLOT DIAGRAM1
04/17/2019123737698Open ↗