ECB09/22/2026BC3307.2.1 at time of inspection observed jersey barriers occupying roadway. Upon reviewing DOT systems no permit on record/found. In addition, DOT permit for barriers that posted on site expired.$2K due
ECB09/22/2026Observed jersey barriers at exp#1 not as per manufactures specification. Jersey barriers not continuously interlocked not fill with water/sand which poses a potential hazard by allowing unintended movement of$1K due
ECB07/29/2026Observed construction fence erected at expo 1. Fence permit expired 07/18/2026.renew permit$1K due
ECB07/27/2026Upon inspection i observed a sidewalk shed installed at expos 1 contrary to approved plans. Approved plans do not match site conditions. Incorrect height and elevation shown on plans. Incorrect cross brace sequ$1K due
ECB07/27/2026Upon inspection i observed structural work in progress on 5TH floor and work contrary to the site safety plan. No window protection provided/installed at expos 4 adjoining property rear. No overhead protection$2K due
ECB01/17/2026At time of inspection observed: at exposure# 1 inadequate storage zone, plastic barriers system contrary to manufacturer specifications bc 3301.1.3 missing interlocking couplers, not water filled, creating an u$1K due
DOB11/12/2025Borough commissioner has ordered all work stopped underpermit #B00666125-I1 on 11/7/25. Due to construction superintendentwithdrawal.
ECB10/10/2025Observed active site upon request w/out providing approve drawings or manufacturing specifications for cold form steel operations @ cellar & 1ST floor level. Stop all structural steels operational @ cellar lev$12K due
ECB10/10/2025Observed active site w/out any overhead protection for adjoining properties @ exp. 3 & 4. Gc must provide all overhead protection for ongoing construction operation. Stop all roof operations and provide overhea$10K due
ECB10/10/2025Observed hoisting equipment on 1ST floor deck at exposure #3 for which no manufacturer specification was provided upon request.bc 3301.6.1 stop all use of makeshift hoisting equipment @ exp. 3 under permit # 32$10K due
ECB10/10/2025Observed active site with multiple overloaded cmu blocks on roof deck while active construction operations in progress which directly effects ingress/egress locations @ roof level. 3305.8.7 stop all cmu block s$10K due
ECB10/10/2025Observed active site using open fire hydrant w/out DEP permit. Gc must provide active DEP permit for accessing fire hydrant without approval> 15 rcny 20-08 stop all use of fire hydrants operations under permit$6K due