← Back
BuildNYC
Zoned commercial or Manhattan residential
121 VETERANS ROAD WEST
STATEN ISLAND · BIN 5175948
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M2-1Zoning
0 sfGross Floor Area
0Units
5 Active Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: Aoy · 9,154 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 15Endurant Energy1p · 1 filing · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Curb cut installationUnder Construction1p · 1 filing · 3 docs
Site & exteriorEndurant Energy18p · 4 filings · 20 docs
Filed — no permit issuedBattery Storage System Installation3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Aoy103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS Designs405/08/2025
Square Arch108/20/2024
Servinsky Engineering108/19/2024
Jac Engineering111/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sologistics203/21/2026
Sparc Fire Protection Engineering103/21/2026
JLS Designs103/21/2026
LS Expeditor103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GI EndurantGeneral Contractor1810/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gta Engineering Services2940405/08/2025
Sq. Arch4802108/20/2024
Building Lifecycle
All (60)Filed (7)Permit Issued (8)Violation (2)Inspection (1)Objection (21)Special Inspection (21)
10/09/2026
Permit issued — Curb Cut
S00944489-I1-CC
04/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2025
Violation issued (ECB, open)
Construction
10/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/08/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF BESS UNITS, ESS TAX
S08031798-P1
05/01/2025
Special inspection requirement — Insulation placement and R values
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Fenestration air leakage
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Air barrier - visual inspection
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Fenestration areas
JOSEPH SULTANA, JR
05/01/2025
Special inspection requirement — Concrete - Cast-In-Place
ROBERT DYKSTRA
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH SULTANA, JR
03/06/2025
Permit issued — General Construction
S08031798-I1-GC
01/15/2025
Permit issued — General Construction
S08031798-I1-GC
08/30/2024
Permit issued — Foundation
S01089537-I1-GC-CX
08/26/2024
Permit issued — Solar
S01089564-I1-SL
08/20/2024
Filed — Alteration
SOLAR CANOPY INSTALLATION. CANOPY STRUCTURE APPLICATION SUBMITTED UNDER JOB# S01089537-I1.
S01089564-I1
08/19/2024
Filed — Alteration
STRUCTURAL DESIGN AND CONSTRUCTION OF STAND-ALONE STEEL CANOPY STRUCTURE.
S01089537-I1
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
07/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
07/31/2024
Special inspection requirement — Concrete - Cast-In-Place
ROBERT DYKSTRA
07/31/2024
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
07/31/2024
Special inspection requirement — Final
Kaijin Liang
07/31/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT DYKSTRA
07/31/2024
Special inspection requirement — Structural Cold-Formed Steel
ROBERT DYKSTRA
07/31/2024
Special inspection requirement — Structural Steel - Details
ROBERT DYKSTRA
07/31/2024
Special inspection requirement — Final
ROBERT DYKSTRA
07/31/2024
Special inspection requirement — Footing and Foundation
ROBERT DYKSTRA
07/11/2024
Permit issued — General Construction
S08031947-I1-GC
06/03/2024
Permit issued — General Construction
S08031947-I1-GC
04/18/2024
Objection resolved — Addressed
10/24/2023
Objection raised — Scope
10/06/2023
Filed — Alteration
INSTALLATION OF A 18'-0" CURB CUT INCLUDING SPLAYS
S00944489-I1
05/25/2023
Permit issued — General Construction
S08031947-I1-GC
02/14/2023
Special inspection requirement — Subgrade Inspections
ROBERT DYKSTRA
12/09/2022
Objection raised — Zoning
12/09/2022
Objection resolved — Addressed
12/09/2022
Objection raised — Zoning
12/09/2022
Objection resolved — Addressed
12/09/2022
Objection raised — Admin
12/09/2022
Objection resolved — Addressed
12/09/2022
Objection raised — Admin
12/09/2022
Objection resolved — Addressed
12/01/2022
Special inspection requirement — Concrete - Cast-In-Place
ROBERT DYKSTRA
11/30/2022
Objection raised — Zoning
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Inspections
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Admin
11/30/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Scope
11/29/2022
Objection raised — Structural
11/29/2022
Objection raised — Admin
11/29/2022
Objection raised — Structural
11/29/2022
Objection raised — Fire_Protection
11/28/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF BESS UNITS, ESS TAX
S08031798-I1
11/10/2022
Filed — Alteration
INSTALLATION OF CONCRETE PADS AND PRIVACY FENCE. BESS SYSTEM TO BE FILED ON SEPARATE APPLICATION
S08031947-I1
11/09/2022
Filed — Alteration
S08035171-I1
11/04/2022
Special inspection requirement — Sprinkler Systems
11/01/2022
Special inspection requirement — Final
JOSEPH SULTANA, JR
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedGI Endurant10/09/2026
DOB NOWGeneral ConstructionPermit IssuedGI Endurant03/06/2025
DOB NOWGeneral ConstructionPermit IssuedGI Endurant01/15/2025
DOB NOWFoundationPermit IssuedGI Endurant08/30/2024
DOB NOWSolarPermit IssuedGI Endurant08/26/2024
DOB NOWGeneral ConstructionPermit IssuedGI Endurant07/11/2024
DOB NOWGeneral ConstructionPermit IssuedGI Endurant06/03/2024
DOB NOWGeneral ConstructionPermit IssuedGI Endurant05/25/2023
2 projects · most recent 07/29/2024
General Wiring
FiledStatusContractorScope
07/29/2024CompleteKriscorp Electrical Contng—
07/13/2023CompleteSpartan Electrical of NYGeneral Wiring
1 project · most recent 08/19/2024
Steel Concrete
FiledStatusContractorScope
08/19/2024Permit IssuedGI EndurantSteel, Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/01/2025Insulation placement and R valuesJOSEPH SULTANA, JRenergy_progress
05/01/2025Fenestration air leakageJOSEPH SULTANA, JRenergy_progress
05/01/2025Air barrier - visual inspectionJOSEPH SULTANA, JRenergy_progress
05/01/2025Fenestration areasJOSEPH SULTANA, JRenergy_progress
05/01/2025Concrete - Cast-In-PlaceROBERT DYKSTRAspecial
05/01/2025Fenestration and door U-factor and product ratingsJOSEPH SULTANA, JRenergy_progress
07/31/2024Fire-Resistant Penetrations and JointsKaijin Liangspecial
07/31/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
07/31/2024Energy Code Compliance InspectionsKaijin Liangprogress
07/31/2024Concrete - Cast-In-PlaceROBERT DYKSTRAspecial
07/31/2024Air barrier - visual inspectionKaijin Liangenergy_progress
07/31/2024FinalKaijin Liangprogress
07/31/2024Structural Steel - High Strength BoltingROBERT DYKSTRAspecial
07/31/2024Structural Cold-Formed SteelROBERT DYKSTRAspecial
07/31/2024Structural Steel - DetailsROBERT DYKSTRAspecial
07/31/2024FinalROBERT DYKSTRAprogress
07/31/2024Footing and FoundationROBERT DYKSTRAprogress
02/14/2023Subgrade InspectionsROBERT DYKSTRAspecial
12/01/2022Concrete - Cast-In-PlaceROBERT DYKSTRAspecial
11/04/2022Sprinkler Systems—special
11/01/2022FinalJOSEPH SULTANA, JRprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Endurant EnergyIndustrial / Warehouse—
Project S08031798 ALT-CO - New Building with Existing Elements to Remain · Permit Entire · 11/28/2022
Project S08031947 Alteration · Permit Entire · 11/10/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S08035171-I1Request digital key ↗
08/22/2026S00944489-I1Request digital key ↗
08/21/2026S01089537-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
11/21/2023540260876Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S08031798-P1Open ↗
08/13/2026S08031798-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S08031798-I1Open ↗
08/13/2026S08031798-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/10/2024540260876Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08031798-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
09/03/2026S01089537-I1Open ↗
09/03/2026S01089537-I1Open ↗
09/03/2026S01089537-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S08035171-I1Open ↗
08/22/2026S00944489-I1Open ↗
08/21/2026S01089537-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/03/2026S01089537-I1Open ↗
09/03/2026S01089537-I1Open ↗
09/01/2026S08031798-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/21/2023540260876Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/21/2023540260876Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08031798-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08031798-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/10/2024540260876Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWOTCR Conditional Acceptance Letter3
08/13/2026S08031798-P1Open ↗
08/13/2026S08031798-P1Open ↗
08/13/2026S08031798-I1Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/10/2024540260876Open ↗
▸DOB NOWOTCR Final Acceptance Letter1
08/13/2026S08031798-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/21/2023540260876Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026S08031798-I1Open ↗
08/13/2026S08031798-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S08031798-I1Open ↗
08/19/2026S08031798-P1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
01/10/2024540260876Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/10/2024540260876Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/10/2024540260876Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/10/2024540260876Open ↗