← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1210 STRATFORD AVENUE
BRONX · BIN 2025355
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
C4-2Zoning
52,536 sfGross Floor Area
53Units
LL97 CoveredRent Stabilized77 Active Violations 76 unresolved · 1 paperwork only 2 likely answered ▸
Elevator apt, semi-fireproof without stores · Owner of record: 1210 Stratford · 12,000 sf lot · 4.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade repair work8p · 2 filings · 10 docs
Floor 1United King Construction sidewalk shed installation4p · 1 filing · 3 docs
Site & exteriorTemporary light duty pipe scaffold installation9p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Marquis Realty703/21/2026
1210 Stratford203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/13/2023$5.2M—MARQUIS REALTY LLC → 1210 STRATFORD LLC$98/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf211/09/2023
Mje Professional Services109/26/2023
Com-EX Engineering of NY108/13/2019
Green Design110/01/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 Expediting203/21/2026
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Faiz AhmedScaffold203/21/2026
United King ConstructionScaffold204/09/2026
National MicrowaveGeneral Contractor103/21/2026
JJS BuildersScaffold107/08/2026
Squan Construction ServicesGeneral Contractor103/21/2026
Faiz AhmedGeneral Contractor107/08/2026
Cross State ConstructionGeneral Contractor105/29/2002
M&S Plumbing and HeatingPlumbing110/22/2018
TJS NYGeneral Contractor110/23/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jay Kavi8500111/09/2023
Victor Suben6672111/08/2023
Building Lifecycle
08/20/2026
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI GLASS INSTALLED AT 1ST AND 2ND PANE FROM SOUTH AT WEST AT PUBLIC HALL, 1st…
HPD violation · closed
08/20/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 2 LITES CAUSING AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
HPD violation · closed
08/20/2026
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE…
HPD violation · open
06/22/2026
Elevator Category 1 inspection report filed
06/21/2026
§ 27-2021 ADM code provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and…
HPD violation · open
220 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offUnited King Construction12/30/2024
DOB NOWGeneral ConstructionSigned-offFaiz Ahmed05/29/2024
DOB NOWSidewalk ShedSigned-offUnited King Construction12/11/2023
DOB NOWSupported ScaffoldPermit IssuedFaiz Ahmed11/22/2023
DOB NOWSidewalk ShedPermit IssuedJJS Builders10/02/2018
BISOTISSUEDTJS NY10/23/2018
BISPLISSUEDCreative Plumbing in10/22/2018
BISOTISSUEDSquan Construction Services02/05/2013
BISOTISSUEDNational Microwave02/04/2013
BISOTISSUEDCross State Construction05/29/2002
3 projects · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023Permit IssuedRichard Neu—
11/12/2019Permit IssuedHirschel ElectricalGeneral Wiring
10/01/2018Permit IssuedRichard Neu—
1 project · most recent 11/08/2023
Scaffold
FiledStatusContractorScope
11/08/2023Permit IssuedFaiz AhmedScaffold
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/20/2023Post-installed AnchorsVictor Subenspecial
11/20/2023Alternative Materials - OTCR Buildings Bulletin NumberVictor Subenspecial
11/01/2023MasonryJay Kavispecial
11/01/2023Structural Stability – Alterations of existing buildingsJay Kavispecial
11/01/2023FinalMOHAMED MAHMOUDprogress
10/25/2023Tenant Protection Plan ComplianceJay Kavispecial
86 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account