← Back
Walk-up cooperative
Tbx1003-sandra Erickson Real Estate
1211 WASHINGTON AVENUE · Claremont Village-Claremont (East) · BIN 2001603
💬 Discuss this project
1931Year Built
4Stories
C6Building Class
R7-1Zoning
7,572 sfGross Floor Area
8Units
Rent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸
Walk-up cooperative · Owner of record: SEAMAN HOUSING DEVELOPMENT FUND CORPORAT ION · 3,390 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof68p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 4115p · 6 filings · 20 docs
Floor 3109p · 6 filings · 20 docs
Floor 2108p · 6 filings · 20 docs
Floor 1110p · 6 filings · 20 docs
Cellar37p · 3 filings · 20 docs
Sub-Basement78p · 4 filings · 20 docs
Site & exterior19p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEIGHBORHOOD RESTORE HDFC1207/08/2026
VIK XS SERVICES1007/08/2026
REPUBLIC EXTERIOR SERVICES703/22/2026
HPD203/21/2026
SEAMAN HOUSING DEVELOPMENT FUND CORPORAT ION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
APPLIED HVAC ENGINEERING, PLLC701/13/2026
SYNERGIC DESIGN ARCHITECTS103/21/2025
OCV ARCHITECTS502/13/2024
ECC INC401/25/2024
OSPINO ENGINEERING PLLC211/15/2023
URBAN INTEGRATIONS208/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS903/21/2026
ECC803/21/2026
Code Compliance Consulting303/21/2026
AO CONSULTING AND DRAFTING403/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMLE & WOLFF CONSTR CORPGeneral Contractor1307/08/2026
REPUBLIC EXTERIOR SERVICEGeneral Contractor603/21/2026
4 BROTHERS & SONS FENCEGeneral Contractor307/08/2026
HOD PIPING & HEATING CORPPlumbing207/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
VIK XS SERVICES INCGeneral Contractor207/08/2026
FLUID MECHANICS CORPFire Protection107/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
PHOENIX PLMBG & MECH CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174901/13/2026
METRIC CONSULTING AND INS1803701/13/2026
SYNERGIC DESIGN LLC8561103/21/2025
ENVIRONMENTAL CODE CONSUL5516201/25/2024
Building Lifecycle
All (196)Filed (21)Permit Issued (23)Signed Off (12)Violation (60)Inspection (8)Objection (42)Special Inspection (30)
04/14/2026
Signed off — Alteration
INSTALLATION OF NEW HIGH EFFICIENCY HEAT PUMPS FOR AIR CONDITIONING AND SPACE HEATING, ELECTRIC/COOLING ROOF TOP FOR VENTILATION OF COMMON AREAS, CENTRAL KITCHEN AND EXHAUST FANS.
X08034212-I1
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kenneth Wille
01/23/2026
Special inspection requirement — Maintenance information
Kenneth Wille
01/23/2026
Special inspection requirement — Final
Ryan Hansen
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kenneth Wille
01/23/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenneth Wille
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Kenneth Wille
01/13/2026
Filed — Alteration
INSTALLATION OF NEW HIGH EFFICIENCY HEAT PUMPS FOR AIR CONDITIONING AND SPACE HEATING, ELECTRIC/COOLING ROOF TOP FOR VENTILATION OF COMMON AREAS, CENTRAL KITCHEN AND EXHAUST FANS.
X08034212-P2
12/16/2025
Signed off — Alteration
RENOVATION OF ENTIRE PLUMBING SYSTEM, REPLACEMENT OF EXISTING SANITARY, VENT, STORM, COLD AND HOT WATER SYSTEMS UP TO EXISTING MAIN 6" COMBINED SEWER/STORM MAIN TO EXISTING CITY MAIN.
X08034445-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2025
Signed off — Alteration
Renovation of a 4 story+basement multi-family, masonry building. The scope includes new non-structural partitions for new apartment layouts, new stair, new finishes, minor renovation of facade with new windows. MS, PL and SP are filed separately.
X00613720-I1
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Kenneth Wille
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenneth Wille
10/22/2025
Special inspection requirement — Maintenance information
Kenneth Wille
10/22/2025
Special inspection requirement — Final
Ryan Hansen
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kenneth Wille
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kenneth Wille
10/22/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
10/10/2025
Signed off — Alteration
INSTALLATION OF WET AUTOMATIC SPRINKLER SYSTEMS, PIPING AND EQUIPMENT.
X08034448-I1
09/25/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/05/2025
Signed off — Alteration
Renovation of a 4 story+basement multi-family, masonry building. The scope includes new non-structural partitions for new apartment layouts, new stair, new finishes, minor renovation of facade with new windows. MS, PL and SP are filed separately.
X00613720-S1
09/02/2025
Signed off — Alteration
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00902510-I1
08/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/14/2025
Permit issued — Sprinklers
X08034448-I1-EW-SP
06/10/2025
Signed off — Alteration
Installation and use of the sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00915958-S2
06/05/2025
Signed off — Alteration
Installation and use of the sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00915958-S1
06/05/2025
Permit issued — Suspended Scaffold
X00915958-S2-SC
05/27/2025
Signed off — Alteration
Installation of 6 KW DC Solar PV on roof. No change of occupancy, use or egress.
X01195392-I1
05/02/2025
Signed off — Alteration
Installation and use of the sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00915958-I1
03/25/2025
Permit issued — Solar
X01195392-I1-SL
03/21/2025
Filed — Alteration
Installation of 6 KW DC Solar PV on roof. No change of occupancy, use or egress.
X01195392-I1
11/25/2024
Permit issued — Suspended Scaffold
X00915958-S2-SC
11/22/2024
Permit issued — Supported Scaffold
X00915958-S1-SF
11/13/2024
Permit issued — Plumbing
X08034445-I1-PL
11/06/2024
Permit issued — Mechanical Systems
X08034212-I1-MS
10/24/2024
Signed off — Alteration
PROTECTION INCLUDING OSHA BARRIERS IN ASSOCIATION WITH CONSTRUCTION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
X00888904-I1
10/17/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
10/17/2024
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
10/17/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SAMI HAJJAR P.E
10/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
08/26/2024
Permit issued — General Construction
X00613720-I1-GC
08/15/2024
Permit issued — General Construction
X00613720-I1-GC
08/15/2024
Permit issued — Protection and Mechanical Methods
X00888904-I1-PMM
08/15/2024
Permit issued — Structural
X00613720-S1-ST
07/18/2024
Permit issued — Construction Fence
X00902510-I1-FN
07/17/2024
Signed off — Alteration
REMOVAL AND INSTALLATION OF STRUCTURAL WOOD JOISTS. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
X00888889-I1
07/16/2024
Permit issued — Sidewalk Shed
X00915958-I1-SH
07/12/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2024
Permit issued — Sprinklers
X08034448-I1-EW-SP
05/23/2024
Violation issued (ECB, closed)
Construction
04/10/2024
Violation issued (ECB, closed)
Unknown
02/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/15/2024
Objection resolved — Addressed
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFLUID MECHANICS CORP08/14/2025
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC06/05/2025
DOB NOWSolarSigned-offACCORD POWER INC03/25/2025
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC11/25/2024
DOB NOWSupported ScaffoldSigned-offVIK XS SERVICES INC11/22/2024
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP11/13/2024
DOB NOWMechanical SystemsSigned-offLEMLE WOLFF CONSTR11/06/2024
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR08/26/2024
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR08/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offLEMLE WOLFF CONSTR08/15/2024
DOB NOWStructuralSigned-offLEMLE WOLFF CONSTR08/15/2024
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE07/18/2024
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE07/16/2024
DOB NOWSprinklersSigned-offGW MECHANICAL CORP06/25/2024
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP02/01/2024
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC11/17/2023
DOB NOWSupported ScaffoldSigned-offVIK XS SERVICES INC11/15/2023
DOB NOWStructuralSigned-offLEMLE WOLFF CONSTR08/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offLEMLE WOLFF CONSTR08/23/2023
DOB NOWStructuralSigned-offLEMLE WOLFF CONSTR08/21/2023
DOB NOWGeneral ConstructionSigned-offLEMLE WOLFF CONSTR08/17/2023
DOB NOWSidewalk ShedSigned-offREPUBLIC EXTERIOR SERVICE08/09/2023
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE07/14/2023
BISOTISSUEDROBERTS CONSTRUCTION CORP.04/09/1991
BISPLISSUEDJABLON PLUMBING CO.,04/09/1991
4 projects · most recent 03/20/2025
General Wiring
FiledStatusContractorScope
03/20/2025CompleteACCORD POWER ELECTRIC LLC—
03/07/2024CompleteALL PURPOSE ELECTRIC CORP—
02/29/2024CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
08/07/2023CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/25/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/12/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
01/23/2026Energy Code Compliance InspectionsKenneth Willeprogress
01/23/2026HVAC-R and service water heating system controlsKenneth Willeenergy_progress
01/23/2026Maintenance informationKenneth Willeenergy_progress
01/23/2026HVAC-R and service water heating equipmentKenneth Willeenergy_progress
01/23/2026HVAC-R and service water piping design and insulationKenneth Willeenergy_progress
01/23/2026Mechanical SystemsSAMI HAJJAR P.Especial
01/23/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
01/23/2026FinalRyan Hansenprogress
10/22/2025HVAC-R and service water piping design and insulationKenneth Willeenergy_progress
10/22/2025Maintenance informationKenneth Willeenergy_progress
10/22/2025HVAC-R and service water heating system controlsKenneth Willeenergy_progress
10/22/2025HVAC-R and service water heating equipmentKenneth Willeenergy_progress
10/22/2025FinalRyan Hansenprogress
10/22/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/22/2025Mechanical SystemsSAMI HAJJAR P.Especial
10/22/2025Energy Code Compliance InspectionsKenneth Willeprogress
10/17/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
10/17/2024FinalSAMI HAJJAR P.Eprogress
10/17/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
10/17/2024Construction Operations Influencing Adjacent StructuresSAMI HAJJAR P.Especial
02/08/2024FinalSAMI HAJJAR P.Eprogress
02/08/2024Construction Operations Influencing Adjacent StructuresSAMI HAJJAR P.Especial
02/08/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
02/08/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
01/25/2024HVAC-R and service water heating equipmentKenneth Willeenergy_progress
Latest 25 of 64.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/23/2026X08034445-I1Request digital key ↗
08/23/2026X08034445-P1Request digital key ↗
08/23/2026X08034448-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature22
08/31/2026X00613720-P3Open ↗
08/31/2026X00613720-S1Open ↗
08/28/2026X00613720-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/23/2026X08034445-I1Open ↗
08/23/2026X08034445-P1Open ↗
08/23/2026X08034212-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/06/2026X08034448-I1Open ↗
09/06/2026X08034448-I1Open ↗
08/31/2026X00613720-P3Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/23/2026X08034445-I1Open ↗
08/21/2026X00888889-I1Open ↗
08/15/2026X00613720-S1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X08034445-I1Open ↗
08/13/2026X08034212-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00613720-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01195392-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026X01195392-I1Open ↗
▸Other Documents18
▸DOB NOWDHCR Document16
08/23/2026X08034212-P1Open ↗
08/23/2026X08034212-I1Open ↗
08/13/2026X08034212-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWCalculations1
08/13/2026X00915958-S2Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X00915958-S2Open ↗