← Back
BuildNYC
One family attached or semi-detached
1213 EVERGREEN AVENUE
BRONX · BIN 2025038
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R6Zoning
2,541 sfGross Floor Area
1Units
0 Active Violations 2 old, status unconfirmed ▸
One family attached or semi-detached · 2,000 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior and exterior repair2 filings · 3 docs
Floor 2Interior and exterior repair2 filings · 3 docs
Floor 1Interior and exterior repair2 filings · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jose A. Santos P.E.P.C.111/09/2026
Gaby Tchilinguirian R.A.110/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M W Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Symmetrical ConstrucGeneral Contractor103/21/2026
PS P HPlumbing103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292111/09/2026
Building Lifecycle
11/09/2026
Filed — Alteration
PROPOSED STRUCTURAL WORK IN CONJUNCTION WITH GC #X00925509-I1 TO ADDRESS THE FULL VACATE ORDER ISSUED DUE TO FIRE DAMAGE, AS PER THE PLANS SUBMITTED HEREWITH.
X01465655-I1
10/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
10/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
10/21/2026
Special inspection requirement — Subgrade Inspections
Jose Santos
10/21/2026
Special inspection requirement — Wood – Seismic Resistance
Jose Santos
14 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDSymmetrical Construction05/20/2010
BISOTISSUEDSymmetrical Construction02/02/2010
BISPLISSUEDPat Sementa P & H04/02/1999
BIS—ISSUEDAttorney in Fact03/24/1999
1 project · most recent 09/12/2024
General Wiring
FiledStatusContractorScope
09/12/2024Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 11/09/2026
Wood
FiledStatusContractorScope
11/09/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/21/2026Structural Stability – Alterations of existing buildingsJose Santosspecial
10/21/2026Fire-Resistant Penetrations and JointsJose Santosspecial
10/21/2026Subgrade InspectionsJose Santosspecial
10/21/2026Wood – Seismic ResistanceJose Santosspecial
09/25/2026FinalRilder Mejiaprogress
08/28/2023Final—progress
08/28/2023Structural Stability – Alterations of existing buildings—special
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account