← Back
BuildNYC
Walk-up apt, over six families with stores
1215 8TH AVENUE
BROOKLYN · Park Slope · BIN 3026398
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R6BZoning
8,702 sfGross Floor Area
8Units
Rent Stabilized16 Active Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 216 Thompson Street Associates · 23,244 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJM Beer Counter2p · 1 filing · 20 docs
Floor 1JM Beer Counter45p · 1 filing · 20 docs
CellarJM Beer Counter4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
216 Thompson St Associate103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tacklebox Architecture305/09/2025
EP Engineering204/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TMF ConstructionGeneral Contractor707/08/2026
Willdan Electrical of NYElectrical103/22/2026
Essential Plumbing & HeatingPlumbing107/01/2026
Peter Miceli PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899104/17/2024
Jian Engineering7397304/17/2024
Building Lifecycle
All (75)Filed (5)Permit Issued (7)Signed Off (1)Violation (33)Inspection (1)Objection (14)Special Inspection (14)
09/04/2026
Signed off — Alteration
Mechanical modifications to include new mechanical systems as per submitted plans. No change of use, occupancy or egress under this application.
B00943617-S1
06/29/2026
Permit issued — Plumbing
B00943617-S1-PL
10/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2025
Permit issued — Plumbing
B00943617-S1-PL
07/11/2025
Permit issued — General Construction
B00943617-I1-GC
05/28/2025
Permit issued — General Construction
B00943617-I1-GC
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
05/22/2025
Special inspection requirement — Final
MOLLY GLENN
05/09/2025
Filed — Alteration
Mechanical modifications to include new mechanical systems as per submitted plans. No change of use, occupancy or egress under this application.
B00943617-P2
02/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/20/2025
Special inspection requirement — Final
MOLLY GLENN
01/16/2025
Permit issued — Mechanical Systems
B00943617-S2-MS
11/29/2024
Permit issued — General Construction
B00943617-I1-GC
05/03/2024
Objection resolved — Addressed
05/03/2024
Objection resolved — Addressed
05/01/2024
Objection resolved — Addressed
04/30/2024
Objection raised — Admin
04/30/2024
Objection raised — Admin
04/30/2024
Objection raised — Scope
04/19/2024
Objection resolved — Addressed
04/18/2024
Objection raised — Other
04/17/2024
Filed — Alteration
Mechanical modifications to include new mechanical systems as per submitted plans. No change of use, occupancy or egress under this application.
B00943617-S1
04/17/2024
Filed — Alteration
Mechanical modifications to include new mechanical systems as per submitted plans. No change of use, occupancy or egress under this application.
B00943617-S2
04/17/2024
Filed — Alteration
Mechanical modifications to include new mechanical systems as per submitted plans. No change of use, occupancy or egress under this application.
B00943617-P1
04/03/2024
Violation issued (HPD, closed)
A
03/19/2024
Special inspection requirement — Final
JIAN DENG
03/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/19/2024
Special inspection requirement — Final
MOLLY GLENN
03/19/2024
Special inspection requirement — Mechanical Systems
JIAN DENG
03/19/2024
Special inspection requirement — Post-installed Anchors
JIAN DENG
03/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
03/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
03/19/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
ARIEL GOLSHAN
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
11/20/2023
Violation issued (HPD, closed)
I
11/14/2023
Permit issued — General Construction
B00943617-I1-GC
10/31/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Scope
10/27/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Other
10/27/2023
Objection raised — Other
10/17/2023
Filed — Alteration
Mechanical modifications to include new mechanical systems as per submitted plans. No change of use, occupancy or egress under this application.
B00943617-I1
03/20/2023
Violation issued (HPD, closed)
A
12/30/2022
Violation issued (HPD, closed)
A
12/30/2022
Violation issued (HPD, closed)
A
12/30/2022
Violation issued (HPD, open)
C
12/30/2022
Violation issued (HPD, closed)
A
12/30/2022
Violation issued (HPD, closed)
A
12/30/2022
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
05/24/2022
Violation issued (HPD, open)
B
05/24/2022
Violation issued (HPD, open)
A
05/24/2022
Violation issued (HPD, open)
C
05/24/2022
Violation issued (HPD, open)
B
05/24/2022
Violation issued (HPD, open)
B
05/24/2022
Violation issued (HPD, open)
B
05/24/2022
Violation issued (HPD, open)
B
05/24/2022
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEssential Plumbing & Heating06/29/2026
DOB NOWPlumbingSigned-offPeter Miceli Plumbing07/15/2025
DOB NOWGeneral ConstructionSigned-offTMF Construction07/11/2025
DOB NOWGeneral ConstructionSigned-offTMF Construction05/28/2025
DOB NOWMechanical SystemsPermit IssuedTMF Construction01/16/2025
DOB NOWGeneral ConstructionSigned-offTMF Construction11/29/2024
DOB NOWGeneral ConstructionSigned-offTMF Construction11/14/2023
1 project · most recent 04/09/2019
General Wiring
FiledStatusContractorScope
04/09/2019CompleteWilldan Electrical of NYGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/22/2025Tenant Protection Plan ComplianceJIAN DENGspecial
05/22/2025FinalMOLLY GLENNprogress
02/20/2025Tenant Protection Plan Compliance—special
02/20/2025FinalMOLLY GLENNprogress
03/19/2024FinalJIAN DENGprogress
03/19/2024Tenant Protection Plan Compliance—special
03/19/2024FinalMOLLY GLENNprogress
03/19/2024Mechanical SystemsJIAN DENGspecial
03/19/2024Post-installed AnchorsJIAN DENGspecial
03/19/2024Tenant Protection Plan ComplianceJIAN DENGspecial
03/19/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
03/19/2024Tenant Protection Plan ComplianceJIAN DENGspecial
03/19/2024Exhaust and Vent Systems in Plenums and DuctsARIEL GOLSHANspecial
03/19/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
JM Beer CounterRestaurant / Food ServiceCellar, Floor 1
Project B00943617 Alteration · Permit Entire · 10/17/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B00943617-P2Request digital key ↗
08/25/2026B00943617-S2Request digital key ↗
08/25/2026B00943617-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/25/2026B00943617-I1Open ↗
08/13/2026B00943617-P1Open ↗
08/13/2026B00943617-S2Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B00943617-S1Open ↗
08/31/2026B00943617-S1Open ↗
08/31/2026B00943617-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B00943617-P1Open ↗
08/25/2026B00943617-I1Open ↗
08/13/2026B00943617-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00943617-P1Open ↗
08/28/2026B00943617-I1Open ↗
08/27/2026B00943617-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B00943617-I1Open ↗
08/15/2026B00943617-P1Open ↗
08/13/2026B00943617-S1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProof of Historic Building3
08/25/2026B00943617-I1Open ↗
08/15/2026B00943617-P1Open ↗
08/13/2026B00943617-P2Open ↗