← Back
Fire Department
1215 INTERVALE AVENUE
BRONX · BIN 2010447
💬 Discuss this project
1931Year Built
2Stories
Y1Building Class
R7-2Zoning
16,687 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Fire Department · Owner of record: FIRE DEPARTMENT OF NEW YORK · 5,499 sf lot · 3.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 2 filings · 20 docs
Floor 321p · 4 filings · 20 docs
Floor 2Under Construction41p · 5 filings · 20 docs
Floor 1Under Construction64p · 8 filings · 20 docs
CellarUnder Construction76p · 10 filings · 20 docs
2 jobs · most recent 05/10/2024
Air Conditioning Systems Ventilation Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/10/2024——Air Conditioning Systems, Ventilation Systems
Cooling
Daikin RXSQ48TAVJUA 4 tons · Vrf Outdoor ×4
Ventilation
N/A E76 600 CFM · Makeup Air ×4
Econ-Air EA-USBI13DD-RM 1,150 CFM · Exhaust Fan ×2
07/28/2022Permit IssuedZHL GROUP INCAssociated Ducts and Piping
Ducts & Piping
N/A N/A 1 BTU · Refrigeration Unit ×1
1 job · most recent 09/06/2024
FiledStatusContractorScope
09/06/2024——2 heads
2 jobs · most recent 09/06/2024
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
09/06/2024Permit IssuedFRANCO BELLI PLMG&HTG SONGas, Plumbing-Sprinkler, Water/Sanitary
06/08/2022Permit IssuedFRANCO BELLI PLMG&HTG SONGas
2 jobs · most recent 12/17/2024
General Wiring
FiledStatusContractorScope
12/17/2024Permit IssuedPOLARIS ELEC'L CONST CORPGeneral Wiring
01/11/2018CompleteSTANCO SYSTEM ELEC'L CONT—
1 job · most recent 08/01/2022
Steel Concrete Wood
FiledStatusContractorScope
08/01/2022Permit IssuedASHNU INTERNATIONAL INCSteel, Concrete, Wood
Building Lifecycle
All (158)Filed (17)Permit Issued (20)Signed Off (2)Violation (20)Inspection (15)Objection (54)Special Inspection (30)
07/23/2026
Permit issued — Boiler Equipment
X00702742-I1-BE
07/08/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/09/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/23/2026
Permit issued — General Construction
X01343379-I1-GC
02/18/2026
Permit issued — Plumbing
X00702620-I1-PL
02/18/2026
Permit issued — Plumbing
X00702848-I1-PL
01/13/2026
Filed — Alteration
Fuel Storage MULTI-COMPONENT RENOVATION (FDNY EC82 PHASE 2). REMOVAL AND REPLACEMENT OF DISEL FUEL DISPENSING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01343379-I1
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
01/07/2026
Special inspection requirement — Final
RONALD GRAPIN
10/01/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00380549-I1
10/01/2025
Signed off — Alteration
SCAFFOLD AD PER NYC BC. NO CHANGE IN USE, EGRESS, OR OCCUAPNCY.
X00544746-I1
09/29/2025
Permit issued — Structural
X00702991-I1-ST
06/26/2025
Permit issued — General Construction
X00702558-I1-GC
06/25/2025
Permit issued — General Construction
X00702552-I1-GC
06/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/03/2025
Permit issued — Plumbing
X00702848-I1-PL
01/03/2025
Permit issued — Plumbing
X00702620-I1-PL
09/06/2024
Filed — Alteration
Plumbing Work Multi-Component (EC 82 PHASE 2) no change of use, egress, or occupancy under this application. See comment#24
X00702848-P2
09/06/2024
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
09/05/2024
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
08/13/2024
Permit issued — Structural
X00702991-I1-ST
07/03/2024
Permit issued — General Construction
X00702558-I1-GC
07/02/2024
Permit issued — General Construction
X00702552-I1-GC
06/07/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/31/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
05/23/2024
Objection resolved — Addressed
05/23/2024
Special inspection requirement — Permanent certificate
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — Mechanical Systems
GIORGI KHARDZEISHVILI
05/23/2024
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
05/10/2024
Filed — Alteration
INSTALLATION OF ROOFTOP HVAC UNIT, KITCHEN HOOD, ANSUL SYSTEM AND KITCHEN EXHAUST FAN FOR FDNY ENGINE CO 82 FLOOD REPAIR RENOVATION ( PHASE 1) NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
X00702965-P1
05/10/2024
Objection raised — Other
04/08/2024
Permit issued — Mechanical Systems
X00702719-I1-MS
01/18/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/12/2024
Permit issued — Plumbing
X00702848-I1-PL
09/15/2023
Filed — Alteration
Plumbing Work Multi-Component (EC 82 PHASE 2) no change of use, egress, or occupancy under this application. See comment#24
X00702848-P1
08/29/2023
Special inspection requirement — Energy Code Compliance Inspections
08/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2023
Permit issued — Plumbing
X00702620-I1-PL
12/28/2022
Permit issued — Supported Scaffold
X00544746-I1-SF
12/02/2022
Objection raised — Other
12/02/2022
Objection resolved — Addressed
09/01/2022
Special inspection requirement — Interior lighting power
GIORGI KHARDZEISHVILI
Latest 60 of 158 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FDNY3807/25/2026
NYC FD 0103/22/2026
FIRE DEPARTMENT OF NEW YORK203/21/2026
FIRE DEPARTMENT403/21/2026
DUREAU OF BLDG DESIGN503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAMERON ENGINEERING1101/13/2026
G. SWITZER ARCHITECTURE, PC (GSAPC)208/02/2022
360 ENGINEERING P.C.412/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC2603/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCO BELLI PLMG&HTG SONPlumbing1107/25/2026
ASHNU INTERNATIONAL INCGeneral Contractor707/08/2026
PJP INSTALLERS INCGeneral Contractor507/08/2026
BIANCHINO, AElectrical103/21/2026
JUSTIN GROUP INCGeneral Contractor104/09/2026
ZHL GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC80111201/13/2026
360 ENGINEERING P.C.7496312/21/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedFRANCO BELLI PLMG&HTG SON07/23/2026
DOB NOWGeneral ConstructionPermit IssuedJUSTIN GROUP INC02/23/2026
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON02/18/2026
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON02/18/2026
DOB NOWStructuralPermit IssuedERNEST KURIQI09/29/2025
DOB NOWGeneral ConstructionPermit IssuedERNEST KURIQI06/26/2025
DOB NOWGeneral ConstructionPermit IssuedERNEST KURIQI06/25/2025
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON01/03/2025
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON01/03/2025
DOB NOWStructuralPermit IssuedERNEST KURIQI08/13/2024
DOB NOWGeneral ConstructionPermit IssuedERNEST KURIQI07/03/2024
DOB NOWGeneral ConstructionPermit IssuedERNEST KURIQI07/02/2024
DOB NOWMechanical SystemsPermit IssuedZHL GROUP INC04/08/2024
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON01/12/2024
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON08/04/2023
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC12/28/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/13/2022
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC01/13/2022
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC07/09/2021
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC06/16/2021
BISPLISSUEDFRANCO BELLI PLMG&HTG SON02/17/2026
BISOTISSUEDASHNU INTERNATIONAL INC06/26/2025
BISPLISSUEDFRANCO BELLI PLMG&HTG SON12/17/2024
BISOTISSUEDASHNU INTERNATIONAL INC06/27/2024
BISPLISSUEDFRANCO BELLI PLMG&HTG SON08/23/2023
BISPLISSUEDFRANCO BELLI PLMG&HTG SON08/23/2023
BISOTISSUEDASHNU INTERNATIONAL INC06/26/2023
BISOTISSUEDASHNU INTERNATIONAL INC06/23/2022
BISPLISSUEDFRANCO BELLI PLMG&HTG SON05/26/2022
BISOTISSUEDASHNU INTERNATIONAL INC03/11/2022
BISPLISSUEDFRANCO BELLI PLMG&HTG SON06/23/2021
BISOTISSUEDASHNU INTERNATIONAL INC06/21/2021
BISFPISSUEDALLSTATE FIRE AND SAFETY EQUIP03/09/1999
BISPLISSUEDDELPHI PLBG. & HTG., INC10/29/1998
BISBLISSUEDDELPHI PLBG. & HTG., INC10/29/1998
BISPLISSUEDFIVE STAR P AND H CO, INC09/28/1998
BISOTISSUEDJCH DELTA CONTRACTING INC.07/23/1998
BISOTISSUEDLARRY E. TYREE, INC.10/02/1997
BISPLISSUEDDELPHI PLBG. & HTG., INC02/12/1997
BISOTISSUEDVOLMAR CONSTRUCTION CORP.04/26/1996
+ 4 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/08/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/15/2026Fail-Final CND-Occupancy InspectionFailView ↗
06/09/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/31/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
01/13/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
01/07/2026FinalRONALD GRAPINprogress
09/06/2024Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
09/06/2024Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
09/05/2024Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
09/05/2024Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
05/23/2024Permanent certificateGIORGI KHARDZEISHVILIenergy_progress
05/23/2024HVAC-R and service water heating equipmentGIORGI KHARDZEISHVILIenergy_progress
05/23/2024HVAC-R and service water piping design and insulationGIORGI KHARDZEISHVILIenergy_progress
05/23/2024Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
05/23/2024Fire-Resistance Rated ConstructionGIORGI KHARDZEISHVILIprogress
05/23/2024HVAC-R and service water heating system controlsGIORGI KHARDZEISHVILIenergy_progress
05/23/2024Duct leakage testing, insulation and designGIORGI KHARDZEISHVILIenergy_progress
05/23/2024Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
05/23/2024Mechanical SystemsGIORGI KHARDZEISHVILIspecial
05/23/2024FinalGIORGI KHARDZEISHVILIprogress
08/29/2023Energy Code Compliance Inspections—progress
08/29/2023Fire-Resistant Penetrations and Joints—special
09/01/2022Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
07/28/2022Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/28/2022MasonryGIORGI KHARDZEISHVILIspecial
05/25/2022Structural Steel - High Strength BoltingGIORGI KHARDZEISHVILIspecial
05/25/2022Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
05/25/2022Sprayed fire-resistant materialsGIORGI KHARDZEISHVILIspecial
05/25/2022MasonryGIORGI KHARDZEISHVILIspecial
Latest 25 of 43.
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch15
08/25/2026X00544746-P1Request digital key ↗
08/25/2026X00544746-I1Request digital key ↗
08/25/2026X00544746-P2Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00380549-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
05/04/2022220611443Open ↗
06/15/2021220611443Open ↗
04/23/2019220611443Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
06/23/2021220611443Open ↗
06/21/2021220611443Open ↗
▸Seals & Professional Certifications60
▸DOB NOWSpecial Inspector Seal & Signature21
09/22/2026X00702848-I1Open ↗
09/02/2026X00702848-P2Open ↗
08/29/2026X00702991-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/22/2026X00702848-I1Open ↗
09/02/2026X00702848-P2Open ↗
08/29/2026X00702991-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026X00380549-I1Open ↗
08/24/2026X00703039-I1Open ↗
08/24/2026X00702620-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/23/2019220611443Open ↗
04/23/2019220611443Open ↗
04/23/2019220611443Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
05/04/2022220611443Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/23/2019220611443Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/24/2026X00702620-I1Open ↗
08/15/2026X00702965-I1Open ↗
08/14/2026X00702719-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
06/21/2021220611443Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/23/2019220611443Open ↗
04/23/2019220611443Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/21/2021220611443Open ↗
06/21/2021220611443Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/13/2026X00702742-I1Open ↗
08/13/2026X00703039-I1Open ↗
08/13/2026X00702965-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/13/2026X01343379-I1Open ↗
08/13/2026X00702848-I1Open ↗
08/13/2026X00702991-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026X00702552-I1Open ↗
08/13/2026X00702991-I1Open ↗
08/13/2026X00702848-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/06/2019220611443Open ↗
04/23/2019220611443Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/23/2019220611443Open ↗
04/23/2019220611443Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/23/2019220611443Open ↗
04/23/2019220611443Open ↗