| Owner | Filings | Most Recent |
|---|---|---|
| Mhany Peninsula Local Development | 22 | 03/21/2026 |
| NYC Economic Development | 13 | 07/08/2026 |
| Nycedc | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EP Engineering | 20 | 08/18/2026 |
| Reform Architecture | 1 | 08/18/2026 |
| Claire Weisz Architects | 3 | 12/06/2024 |
| Indetail Architectural and Engineering | 2 | 06/26/2023 |
| WXY Architecture + Urban Design | 1 | 05/11/2022 |
| Skyline | 3 | 07/28/2021 |
| Ancora Engineering | 2 | 03/26/2021 |
| KZ Engineering | 2 | 04/29/2020 |
| Philip Habib & Associates | 1 | 01/28/2020 |
| Safway Atlantic | 1 | 11/06/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Design 2147 | 14 | 03/21/2026 |
| Synergy Building Consultants | 2 | 03/21/2026 |
| HTX Building Consulting | 2 | 03/21/2026 |
| DVA Advisors | 17 | 03/21/2026 |
| William Vitacco Associates | 4 | 03/21/2026 |
| A1 Expediting Service | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Safway Atlantic | Scaffold | 6 | 07/08/2026 |
| CS Bridge | Scaffold | 4 | 07/08/2026 |
| Select Commercial Construction* | General Contractor | 4 | 07/08/2026 |
| Sing Construction | General Contractor | 4 | 03/21/2026 |
| On Point and on Target | General Contractor | 3 | 03/21/2026 |
| A.S.K. Electrical | Electrical | 2 | 03/22/2026 |
| I-Resolve Construction GR | General Contractor | 2 | 07/08/2026 |
| Project Eye Consultants I | General Contractor | 2 | 04/09/2026 |
| Richter & Ratner Contracting | Scaffold | 2 | 03/21/2026 |
| NM Mechanical | Plumbing | 2 | 07/08/2026 |
| Village P & H NY | Plumbing | 1 | 07/08/2026 |
| Jas Electrical Services | Electrical | 1 | 03/22/2026 |
| Crossfield Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| E.M.P. Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Village P & H NY | Fire Protection | 1 | 07/08/2026 |
| Otec Plumbing & Heating Services | Plumbing | 1 | 07/08/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| Tristar Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| LTB Mechanical | specialty_contractor | 1 | 07/08/2026 |
| Aal Construction Services | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| EP Inspections and Commis | 7079 | 4 | 03/17/2025 |
| Alan Margolin & Associates | 423 | 4 | 01/14/2025 |
| Metric Consulting and Ins | 1803 | 7 | 07/12/2023 |
| Indetail Design Architect | 4828 | 1 | 06/26/2023 |
| Domani Inspection Service | 843 | 3 | 07/28/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | NM Mechanical | 03/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Project Eye Consultants I | 01/13/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Project Eye Consultants I | 01/13/2025 |
| DOB NOW | Sprinklers | Permit Issued | E.M.P. Fire Sprinkler | 01/06/2025 |
| DOB NOW | General Construction | Signed-off | I-Resolve Construction GR | 12/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | LTB Mechanical | 11/27/2024 |
| DOB NOW | Plumbing | Signed-off | Tristar Plumbing & Heating | 10/25/2024 |
| DOB NOW | Plumbing | Permit Issued | NM Mechanical | 10/07/2024 |
| DOB NOW | General Construction | Signed-off | I-Resolve Construction GR | 10/01/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Select Commercial Construction* | 09/21/2023 |
| DOB NOW | Plumbing | Signed-off | Crossfield Plumbing & Heating | 09/19/2023 |
| DOB NOW | Plumbing | Signed-off | Village P & H NY | 09/12/2023 |
| DOB NOW | Sprinklers | Permit Issued | Village P & H NY | 09/12/2023 |
| DOB NOW | General Construction | Signed-off | Sing Construction | 08/23/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Sing Construction | 07/17/2023 |
| DOB NOW | Plumbing | Signed-off | Otec Plumbing & Heating Services | 03/16/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | On Point and on Target | 02/01/2023 |
| DOB NOW | Curb Cut | Signed-off | Aal Construction Services | 11/03/2021 |
| DOB NOW | Construction Fence | Signed-off | Richter & Ratner Contracting | 05/17/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | CS Bridge | 02/23/2021 |
| DOB NOW | Boiler Equipment | Signed-off | Pace Plumbing | 10/30/2020 |
| DOB NOW | Supported Scaffold | Signed-off | CS Bridge | 06/10/2020 |
| DOB NOW | Sidewalk Shed | Signed-off | CS Bridge | 03/06/2020 |
| DOB NOW | Construction Fence | Signed-off | Safway Atlantic | 01/22/2020 |
| DOB NOW | Construction Fence | Signed-off | Safway Atlantic | 09/19/2019 |
| DOB NOW | Construction Fence | Signed-off | Safway Atlantic | 12/14/2018 |
| DOB NOW | Construction Fence | Signed-off | Safway Atlantic | 11/07/2018 |
| BIS | PL | ISSUED | Pace Plumbing | 12/02/2021 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 04/05/2021 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 04/01/2021 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 03/31/2021 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 03/30/2021 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 03/25/2021 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 03/24/2021 |
| BIS | OT | ISSUED | Richter & Ratner Contracting | 12/17/2020 |
| BIS | OT | ISSUED | Capri Construction | 12/16/2020 |
| BIS | — | ISSUED | Richter & Ratner Contracting | 11/20/2020 |
| BIS | PL | ISSUED | Pace Plumbing | 09/30/2020 |
| BIS | OT | ISSUED | Empower CES | 09/11/2020 |
| BIS | SP | ISSUED | Sirina Fire Protection | 05/19/2020 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/18/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Climatemaster SB096 3,200 CFM · Wshp ×1 |
| 05/21/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster TE-072 69,000 BTU · Wshp ×1 Coolair OSWH8G3ADFTA-F 104,000 BTU · Heat Pump Outdoor ×1 Ventilation |
| 03/17/2025 | Permit Issued | Project Eye Consultants I | Heating and Air Conditioning Systems | Heat / Cool Bosch EP060-1HZC-FLEAUB-XFGAMXXXS7XXXX3XXXXSBA 57,900 BTU · Wshp ×2 |
| 01/14/2025 | Signed-off | I-Resolve Construction GR | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Bosch EX150-EHZC-SLSBUC-XFGMXXXXX7XXXX1DXXXSBA 148,600 BTU · Wshp ×2 Florida Heat Pump EC150-3HZC 148,600 BTU · Wshp ×2 Ventilation |
| 07/12/2023 | Permit Issued | Project Eye Consultants I | Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster TC-048 4 tons · Wshp ×2 Ventilation Ducts & Piping N/A N/A 1 CFM · Ductwork ×1 |
| 12/07/2022 | — | — | Air Conditioning Systems | Cooling Water Furnace NBH048 1,650 CFM · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | — |
| 05/21/2025 | — | — | 28 heads |
| 03/17/2025 | — | — | 1 heads |
| 01/14/2025 | Permit Issued | E.M.P. Fire Sprinkler | Sprinkler System |
| 07/07/2023 | Permit Issued | Paramount Services | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | Water/Sanitary |
| 05/21/2025 | — | — | Gas, Water/Sanitary |
| 03/17/2025 | — | — | Water/Sanitary |
| 01/14/2025 | Signed-off | Tristar Plumbing & Heating | Gas, Water/Sanitary |
| 07/07/2023 | Signed-off | Village P & H NY | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/22/2025 | Complete | Jas Electrical Services | General Wiring |
| 03/21/2025 | Complete | Jas Electrical Services | General Wiring |
| 01/04/2024 | Complete | Interstate Electric | General Wiring |
| 06/04/2023 | Permit Issued | Omd Electrical | General Wiring |
| 03/27/2023 | Permit Issued | WCK Electric | General Wiring |
| 12/08/2021 | Complete | A.S.K. Electrical | General Wiring |
| 03/12/2021 | Complete | Island Electric | — |
| 07/08/2020 | Complete | Thyssenkrupp Elevator Co | — |
| 04/23/2020 | Complete | A.S.K. Electrical | — |
| 03/09/2020 | Complete | Nash Electric Services | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/06/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/18/2025 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 02/14/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/25/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 10/15/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 08/16/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/16/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/16/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/02/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/26/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/10/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/29/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 12/17/2021 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/17/2026 | Heating Systems | — | special |
| 07/17/2026 | Exhaust and Vent Systems in Plenums and Ducts | — | special |
| 07/17/2026 | Mechanical Systems | — | special |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/17/2026 | Sprinkler Systems | — | special |
| 07/17/2026 | Post-installed Anchors | — | special |
| 07/17/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/17/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 07/17/2026 | Maintenance information | — | energy_progress |
| 07/17/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/17/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/17/2026 | Energy Code Compliance Inspections | — | progress |
| 07/17/2026 | Final | — | progress |
| 07/17/2026 | Post-installed Anchors | — | special |
| 07/17/2026 | High-Pressure Steam Piping (Welding) | — | special |
| 07/17/2026 | High Temperature Hot Water Piping (Welding) | — | special |
| 07/18/2024 | Maintenance information | MOLLY GLENN | energy_progress |
| 07/18/2024 | Energy Code Compliance Inspections | MOLLY GLENN | progress |
| 07/18/2024 | Post-installed Anchors | MOLLY GLENN | special |
| 07/18/2024 | Fire-Resistant Penetrations and Joints | MOLLY GLENN | special |
| 07/18/2024 | Post-installed Anchors | MOLLY GLENN | special |
| 07/18/2024 | High-Pressure Fuel-Gas Piping (Welding) | MOLLY GLENN | special |
| 07/18/2024 | Post-installed Anchors | MOLLY GLENN | special |
| 07/18/2024 | HVAC-R and service water heating equipment | MOLLY GLENN | energy_progress |
| 07/18/2024 | HVAC-R and service water heating system controls | MOLLY GLENN | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Pat's Exotic Beverages | Retail | Floors 2, 3, Roof | Project X01428392 |
| Delicias Y Punto | Restaurant / Food Service | Floor 1, Roof | Project X01008711 |
| Nuthatch | Office | Floor 2, Roof | Project X00843813 Project X00843817 |