1910Year Built
2Stories
B2Building Class
R6Zoning
1,836 sfGross Floor Area
2Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Two family frame · 2,915 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneralOther
Cellar2p · 1 filing · 5 docs
Basement2p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PATRICK E ALLEN ARCHITECT PC207/31/2024
Building Lifecycle
All (41)Filed (2)Violation (26)Objection (8)Special Inspection (5)
07/31/2024
Filed — Alteration
FILING TO REPLACE EXISTING WATER DAMAGED PLUMBING FIXTURES IN AN EXIST.TWO-FAMILY DWELLING UNIT AS PER PLANS. FILING IN CONJUNCTION WITH JOB #X01060151-I1
X01060151-S1
07/10/2024
Objection resolved — Addressed
07/05/2024
Objection resolved — Addressed
07/05/2024
Objection resolved — Addressed
07/05/2024
Objection resolved — Addressed
07/01/2024
Objection raised — Other
07/01/2024
Objection raised — Other
07/01/2024
Objection raised — Zoning
06/26/2024
Objection raised — Other
06/24/2024
Filed — Alteration
FILING TO REPLACE EXISTING WATER DAMAGED PLUMBING FIXTURES IN AN EXIST.TWO-FAMILY DWELLING UNIT AS PER PLANS. FILING IN CONJUNCTION WITH JOB #X01060151-I1
X01060151-I1
06/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/19/2024
Special inspection requirement — Energy Code Compliance Inspections
06/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
06/02/2024
Special inspection requirement — Final
10/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/14/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2022
Violation issued (HPD, closed)
A
05/18/2022
Violation issued (HPD, open)
B
05/18/2022
Violation issued (HPD, open)
B
05/18/2022
Violation issued (HPD, open)
B
05/18/2022
Violation issued (HPD, open)
A
05/18/2022
Violation issued (HPD, open)
B
05/18/2022
Violation issued (HPD, open)
B
05/18/2022
Violation issued (HPD, open)
B
12/16/2019
Violation issued (HPD, closed)
I
12/13/2019
Violation issued (HPD, closed)
C
12/13/2019
Violation issued (HPD, closed)
C
07/28/2016
Violation issued (HPD, closed)
B
07/28/2016
Violation issued (HPD, closed)
B
07/28/2016
Violation issued (HPD, closed)
B
07/08/2007
Violation issued (HPD, open)
B
03/03/2005
Violation issued (HPD, open)
B
03/03/2005
Violation issued (HPD, open)
B
07/21/2004
Violation issued (HPD, open)
B
07/21/2004
Violation issued (HPD, open)
B
07/21/2004
Violation issued (HPD, open)
B
07/21/2004
Violation issued (HPD, open)
B
08/27/2002
Violation issued (HPD, open)
B
08/27/2002
Violation issued (HPD, open)
A
Nothing on file for this building.
1 project · most recent 07/31/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/31/2024——Gas, Water/Sanitary
1 project · most recent 01/03/2025
General Wiring
FiledStatusContractorScope
01/03/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/19/2024Fire-Resistant Penetrations and Joints—special
06/19/2024Structural Stability – Alterations of existing buildings—special
06/19/2024Energy Code Compliance Inspections—progress
06/19/2024Fire-Resistance Rated Construction—progress
06/02/2024Final—progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026X01060151-S1Request digital key ↗
08/21/2026X01060151-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01060151-I1Open ↗
08/13/2026X01060151-S1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01060151-I1Open ↗