4 Open Violations 0 unresolved · 4 paperwork only▸
ECB02/01/2002PLUMBING WORK WITHOUT A PERMIT ALL WORK 100% COMPLETE INSTALLATION OF NEW CAST IRON ROUGHING WHICH INCLUDES WASTE,VENTING AND(2)FLOOR DRAINSIN CELLAR.INSTALLATION OF NEW CAST IRON ROUGHING WHICH INCLUDES WASTENothing owed — awaiting certificate of correction
ECB02/01/2002PLUMBING FIXTURE NOT PROPERLY TRAPPED AND/OR VENTED.CESE OF QUICK VENTS (2)IN CELLAR FOR SINKS (1)IN 2ND FLOOR KITCHEN.NOT ALLOWED REMEDY INSTALL AND PROPERLY TRAP AND/OR VENT.MUST CONNECT TO PROPPER VENT &Nothing owed — awaiting certificate of correction
ECB02/01/2002FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED 1)NEW ROUGHING WHICH INCLUDES WASTE& VENTING AND (2)FLOOR DRAINS IN CELLAR 2)NEW PVC ROUGHING IN KITCHEN ON 1ST FLOOR WHICH INCLUDES WASTE AND VENT 3)NEWNothing owed — awaiting certificate of correction
ECB02/01/2002PLUMBING WORK PERFORMED WAS REQUIRED TO BE PERFORMED BY A MASTER LICENSED PLUMBER INSTALLATION OF NEW CAST IRON ROUGHING WHICH INCLUDES WASTE,VENTING,AND FLOOR DIANES(2)IN CELLAR.INSTALLATION OF NEW CAST IRONNothing owed — awaiting certificate of correction
Two family brick · 2,346 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.