← Back
Primarily 2 family with 1 store or office
1219 ATLANTIC AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3053937
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
C6-3AZoning
1,750 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 406 MADISON VENTURE LLC · 833 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof2p · 1 filing · 15 docs
Floor 37p · 2 filings · 20 docs
Floor 2
Floor 11p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST GROUP CAPITAL807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/01/2021$675K—1219 ATLANTIC LLC → 406 MADISON VENTURE LLC$386/sf building
03/06/2020$635K—— → —$363/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP208/15/2023
ELEVATED ENGINEERING NYC212/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
YOUBER DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OM CONSTRUCTION INCGeneral Contractor407/08/2026
VIOLATION REMOVAL 18 INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500208/15/2023
TECNICO SPECIAL INSPECTIO5939212/22/2021
Building Lifecycle
All (112)Filed (4)Permit Issued (3)Signed Off (2)Violation (45)Objection (38)Special Inspection (20)
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
B
12/04/2024
Violation issued (HPD, closed)
I
01/12/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO RENOVATE THE 3RD FLOOR APT #2. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00720035-I1
01/02/2024
Permit issued — General Construction
B00720035-I1-GC
11/28/2023
Violation issued (HPD, closed)
I
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Jay Kavi
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jay Kavi
08/18/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
08/18/2023
Special inspection requirement — Lighting in dwelling units
Jay Kavi
08/15/2023
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE THE 3RD FLOOR APT #2. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00720035-P1
08/02/2023
Special inspection requirement — Lighting in dwelling units
Jay Kavi
08/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
08/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Jay Kavi
08/02/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
08/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jay Kavi
02/10/2023
Permit issued — General Construction
B00720035-I1-GC
12/28/2022
Objection raised — Fire_Protection
12/28/2022
Objection resolved — Addressed
12/28/2022
Objection raised — Other
12/28/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Fire_Protection
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Fire_Protection
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Other
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Scope
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Other
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Scope
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Inspections
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Accessibility
11/29/2022
Objection resolved — Addressed
11/24/2022
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE THE 3RD FLOOR APT #2. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
B00720035-I1
11/17/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
03/01/2022
Signed off — Alteration
Proposed temporary shoring/ bracing to stabilize the existing 3-story building as per plan. No change to egress, occupancy or use.
B00564514-I1
12/23/2021
Objection resolved — Addressed
12/23/2021
Special inspection requirement — Structural Wood Frame
Jose Lockhart
12/23/2021
Special inspection requirement — Structural Cold-Formed Steel
Jose Lockhart
12/23/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Lockhart
12/23/2021
Special inspection requirement — Structural Steel - Details
Jose Lockhart
12/23/2021
Special inspection requirement — Final
Jose Lockhart
12/22/2021
Filed — Alteration
Proposed temporary shoring/ bracing to stabilize the existing 3-story building as per plan. No change to egress, occupancy or use.
B00564514-P1
12/22/2021
Objection raised — Scope
12/21/2021
Special inspection requirement — Structural Cold-Formed Steel
Jose Lockhart
12/21/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Lockhart
12/21/2021
Special inspection requirement — Structural Steel - Details
Jose Lockhart
12/21/2021
Special inspection requirement — Structural Wood Frame
12/21/2021
Special inspection requirement — Final
Jose Lockhart
11/16/2021
Permit issued — Structural
B00564514-I1-ST
09/29/2021
Objection resolved — Addressed
09/29/2021
Objection resolved — Addressed
09/29/2021
Objection resolved — Addressed
09/29/2021
Objection resolved — Addressed
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOM CONSTRUCTION INC01/02/2024
DOB NOWGeneral ConstructionSigned-offOM CONSTRUCTION INC02/10/2023
DOB NOWStructuralSigned-offVIOLATION REMOVAL 18 INC11/16/2021
2 projects · most recent 09/23/2022
General Wiring
FiledStatusContractorScope
09/23/2022CompleteUL ELECTRICAL CORP.General Wiring
12/15/2021Permit IssuedS. J. ELECTRIC INC.1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/18/2023Fire-Resistant Penetrations and JointsJay Kavispecial
08/18/2023Energy Code Compliance InspectionsJay Kaviprogress
08/18/2023Fire-Resistance Rated ConstructionJay Kaviprogress
08/18/2023FinalBRIAN MCCAFFREYprogress
08/18/2023Lighting in dwelling unitsJay Kavienergy_progress
08/02/2023Lighting in dwelling unitsJay Kavienergy_progress
08/02/2023Fire-Resistant Penetrations and JointsJay Kavispecial
08/02/2023Energy Code Compliance InspectionsJay Kaviprogress
08/02/2023FinalBRIAN MCCAFFREYprogress
08/02/2023Fire-Resistance Rated ConstructionJay Kaviprogress
12/23/2021Structural Wood FrameJose Lockhartprogress
12/23/2021Structural Cold-Formed SteelJose Lockhartspecial
12/23/2021Structural Stability – Alterations of existing buildingsJose Lockhartspecial
12/23/2021Structural Steel - DetailsJose Lockhartspecial
12/23/2021FinalJose Lockhartprogress
12/21/2021Structural Cold-Formed SteelJose Lockhartspecial
12/21/2021Structural Stability – Alterations of existing buildingsJose Lockhartspecial
12/21/2021Structural Steel - DetailsJose Lockhartspecial
12/21/2021Structural Wood Frame—progress
12/21/2021FinalJose Lockhartprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B00720035-P1Request digital key ↗
08/15/2026B00564514-I1Request digital key ↗
08/15/2026B00564514-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B00564514-I1Open ↗
08/31/2026B00564514-I1Open ↗
08/31/2026B00720035-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B00564514-I1Open ↗
08/31/2026B00564514-I1Open ↗
08/31/2026B00564514-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B00720035-P1Open ↗
08/28/2026B00720035-I1Open ↗
08/13/2026B00564514-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B00720035-P1Open ↗
08/14/2026B00720035-I1Open ↗
08/13/2026B00564514-I1Open ↗
Showing 3 of 4 on file for this type