← Back
Office with commercial, 1-6 stories
1219 QUENTIN ROAD
BROOKLYN · BIN 3182348
💬 Discuss this project
1928Year Built
3Stories
O5Building Class
C4-4AZoning
10,800 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · 4,520 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 36p · 1 filing · 15 docs
Floor 24p · 1 filing · 15 docs
Floor 14p · 1 filing · 15 docs
Cellar4p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITISCAPE CONSULTING LTD904/09/2026
JOSEPH ZELIK REAL ESTATE203/21/2026
JOSEPH REAL ESTATE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITISCAPE CONSULTING LTD309/18/2025
GEE2000 ARCHITECT P.C.101/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITISCAPE CONSULTING LTD603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH ZELIKGeneral Contractor304/09/2026
GW MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITISCAPE CONSULTING LTD762309/18/2025
Building Lifecycle
All (40)Filed (4)Permit Issued (3)Signed Off (2)Violation (2)Inspection (7)Objection (22)
08/11/2026
Signed off — Alteration CO
INTERIOR COSMETIC RENOVATION OF EXISTING OFFICES AT 3RD FLOOR. USE GROUP VI. CHANGE IN USE TO TRADE SCHOOL - VI. CHANGE IN OCCUPANCY, CHANGE IN EGRESS, NO CHANGE BULK OR FAR
B01208865-S1
12/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/01/2025
Objection raised — Other
10/01/2025
Objection resolved — Addressed
09/18/2025
Filed — Alteration CO
INTERIOR COSMETIC RENOVATION OF EXISTING OFFICES AT 3RD FLOOR. USE GROUP VI. CHANGE IN USE TO TRADE SCHOOL - VI. CHANGE IN OCCUPANCY, CHANGE IN EGRESS, NO CHANGE BULK OR FAR
B01208865-P1
09/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
B01208865-S1-PL
07/31/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Admin
07/17/2025
Filed — Alteration CO
INTERIOR COSMETIC RENOVATION OF EXISTING OFFICES AT 3RD FLOOR. USE GROUP VI. CHANGE IN USE TO TRADE SCHOOL - VI. CHANGE IN OCCUPANCY, CHANGE IN EGRESS, NO CHANGE BULK OR FAR
B01208865-S1
07/09/2025
Permit issued — General Construction
B01208865-I1-GC
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/23/2025
Objection raised — Scope
04/23/2025
Objection raised — Structural
04/23/2025
Objection raised — Fire_Protection
04/23/2025
Objection raised — Fire_Protection
04/23/2025
Objection raised — Fire_Protection
04/23/2025
Objection raised — Energy
04/23/2025
Objection raised — Scope
04/23/2025
Objection raised — Plumbing
04/23/2025
Objection raised — Fire_Protection
04/10/2025
Filed — Alteration CO
INTERIOR COSMETIC RENOVATION OF EXISTING OFFICES AT 3RD FLOOR. USE GROUP VI. CHANGE IN USE TO TRADE SCHOOL - VI. CHANGE IN OCCUPANCY, CHANGE IN EGRESS, NO CHANGE BULK OR FAR
B01208865-I1
02/21/2023
Signed off — Alteration
B00665143-I1
05/25/2022
Permit issued — Construction Fence
B00665143-I1-FN
01/21/2022
Filed — Alteration
B00665143-I1
01/05/2022
Violation issued (FDNY_NOV, closed)
10/12/1995
Violation issued (ECB, closed)
Plumbing
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGW MECHANICAL CORP08/15/2025
DOB NOWGeneral ConstructionPermit IssuedJOSEPH ZELIK07/09/2025
DOB NOWConstruction FenceSigned-offJOSEPH ZELIK05/25/2022
BISPLISSUEDCAM ENERGY HEATING AND ME10/25/2007
BIS—ISSUEDSERVICE SIGN ERECTORS CO INC01/28/1998
BISMHISSUEDU.S.MANAGEMENT SYSTEMS04/16/1997
BISPLISSUEDWTC PLBG & HEATING CORP04/16/1997
BISPLISSUEDH BRONNER & SON PLBG & HTG06/18/1992
BISOTISSUEDJOSEPH REAL ESTATE04/30/1992
BISOTISSUEDJOSEPH REAL ESTATE04/30/1992
BIS—ISSUEDJOSEPH REAL ESTATE04/30/1992
BISOTISSUEDJOSEPH REAL ESTATE04/30/1992
BIS—ISSUEDJOSEPH REAL ESTATE01/22/1992
BISOTISSUEDJOSEPH REAL ESTATE08/07/1991
BISEQISSUEDJOSEPH REAL ESTATE08/07/1991
BISEQISSUEDJOSEPH REAL ESTATE07/24/1991
BISOTISSUEDJOSEPH REAL ESTATE07/22/1991
BISEQISSUEDJOSEPH REAL ESTATE07/22/1991
1 project · most recent 09/18/2025
Water/Sanitary
FiledStatusContractorScope
09/18/2025Signed-offGW MECHANICAL CORPWater/Sanitary
3 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026CompleteKINGS ELECTRIC CO., INC.6 meters, 2 new_meters
03/17/2026CompleteKINGS ELECTRIC CO., INC.General Wiring
07/18/2025CompletePAUL'S ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/18/2025Maintenance informationAlix Michelenergy_progress
09/18/2025Fire-Resistant Penetrations and JointsJoe Liebermanspecial
09/18/2025Energy Code Compliance InspectionsJoe Liebermanprogress
09/18/2025HVAC-R and service water heating system controlsAlix Michelenergy_progress
09/18/2025HVAC-R and service water heating equipmentAlix Michelenergy_progress
09/18/2025HVAC-R and service water piping design and insulationAlix Michelenergy_progress
04/23/2025Interior lighting powerAlix Michelenergy_progress
04/23/2025Lighting controlsAlix Michelenergy_progress
04/10/2025Energy Code Compliance InspectionsJoe Liebermanprogress
04/10/2025Fire-Resistance Rated ConstructionJoe Liebermanprogress
04/10/2025Fire-Resistant Penetrations and JointsJoe Liebermanspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00665143-I1Request digital key ↗
08/21/2026B01208865-P1Request digital key ↗
08/21/2026B01208865-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B01208865-I1Open ↗
08/31/2026B01208865-I1Open ↗
08/31/2026B01208865-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00665143-I1Open ↗
08/13/2026B01208865-P1Open ↗
08/13/2026B01208865-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B01208865-I1Open ↗
08/24/2026B01208865-P1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01208865-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01208865-I1Open ↗