← Back
Walk-up cooperative
Celebration Townhouses
121A CIRCLE LOOP · BIN 5130927
💬 Discuss this project
1999Year Built
2Stories
C6Building Class
R3-2Zoning
15,840 sfGross Floor Area
8Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Walk-up cooperative · 8,500 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Floor 22p · 1 filing · 17 docs
Floor 11p · 1 filing · 7 docs
Cellar1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BERKOWNERS907/08/2026
CELEBRATIO403/21/2026
CELEBRATION TH OWNER CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID J DARCY, ARCHITECT507/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GDC CONTRACTING LLCGeneral Contractor203/21/2026
T.S.M. MECHANICAL CORPGeneral Contractor107/08/2026
WALTER J.GRANDE P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738412/01/2021
Building Lifecycle
All (56)Filed (5)Permit Issued (3)Signed Off (3)Violation (13)Inspection (2)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
06/13/2025
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, open)
A
03/31/2023
Violation issued (HPD, open)
A
10/24/2022
Signed off — Alteration
PROPOSED RENOVATION AND CONSTRUCTION REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614381-I1
10/19/2022
Signed off — Alteration
PROPOSED RENOVATION AND CONSTRUCTION REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614381-S1
10/18/2022
Signed off — Alteration
PROPOSED RENOVATION AND PLUMBING REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614661-I1
09/08/2022
Permit issued — Mechanical Systems
S00614381-S1-MS
07/06/2022
Filed — Alteration
PROPOSED RENOVATION AND PLUMBING REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614661-P1
07/06/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/10/2022
Violation issued (HPD, open)
A
03/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2021
Permit issued — Plumbing
S00614661-I1-PL
12/01/2021
Filed — Alteration
PROPOSED RENOVATION AND CONSTRUCTION REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614381-P1
12/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/01/2021
Special inspection requirement — Ventilation and air distribution system
anthony santoro
12/01/2021
Special inspection requirement — Maintenance information
anthony santoro
12/01/2021
Special inspection requirement — Permanent certificate
anthony santoro
12/01/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/01/2021
Special inspection requirement — Mechanical Systems
anthony santoro
12/01/2021
Special inspection requirement — Final
anthony santoro
12/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/29/2021
Special inspection requirement — Final
11/29/2021
Special inspection requirement — Mechanical Systems
anthony santoro
11/29/2021
Special inspection requirement — Energy Code Compliance Inspections
11/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
11/29/2021
Special inspection requirement — Maintenance information
11/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
11/29/2021
Special inspection requirement — Ventilation and air distribution system
11/29/2021
Special inspection requirement — Permanent certificate
11/03/2021
Filed — Alteration
PROPOSED RENOVATION AND CONSTRUCTION REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614381-S1
11/03/2021
Permit issued — Structural
S00614381-I1-GC-CX
10/20/2021
Filed — Alteration
PROPOSED RENOVATION AND CONSTRUCTION REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614381-I1
10/20/2021
Filed — Alteration
PROPOSED RENOVATION AND PLUMBING REPAIRS TO A FIRE DAMAGED RESIDENTIAL BUILDING & TO ADDRESS DOB VIOLATION NUMBERS VAC104/2018, CNE01SC AND COMPLAINT NUMBER 5137636 FOR FDNY REQUEST FOR STRUCTURAL STABILITY INSPECTION
S00614661-I1
10/20/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
10/19/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
10/19/2021
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
10/19/2021
Special inspection requirement — Interior lighting power
anthony santoro
10/19/2021
Special inspection requirement — Air barrier - visual inspection
anthony santoro
10/19/2021
Special inspection requirement — Fenestration air leakage
anthony santoro
10/19/2021
Special inspection requirement — Insulation placement and R values
anthony santoro
10/19/2021
Special inspection requirement — Permanent certificate
anthony santoro
10/19/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
10/19/2021
Special inspection requirement — Fenestration areas
anthony santoro
10/19/2021
Special inspection requirement — Final
anthony santoro
10/19/2021
Special inspection requirement — Preliminary
anthony santoro
04/20/2021
Violation issued (HPD, open)
A
04/20/2021
Violation issued (HPD, closed)
I
11/06/2019
Violation issued (HPD, closed)
I
10/29/2018
Violation issued (HPD, closed)
I
10/07/2018
Violation issued (ECB, closed)
Construction
10/07/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/07/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/07/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offT.S.M. MECHANICAL CORP09/08/2022
DOB NOWPlumbingSigned-offWALTER J.GRANDE P & H INC12/15/2021
DOB NOWStructuralSigned-offGDC CONTRACTING11/03/2021
BISPLISSUEDDUO PLUMBING & HTG CORP.03/16/2001
BISEQISSUEDSKYLINE NEW HOMES/ CELEBRATION04/19/2000
BISEQISSUEDSKYLINE NEW HOMES/ CELEBRATION11/10/1999
BISPLISSUEDDUO PLUMBING & HTG CORP.09/08/1999
BIS—ISSUEDSKYLINE NEW HOMES/ CELEBRATION08/25/1999
BIS—ISSUEDSKYLINE NEW HOMES/ CELEBRATION03/01/1999
BISEQISSUEDSKYLINE NEW HOMES/ CELEBRATION03/01/1999
2 projects · most recent 02/11/2022
General Wiring
FiledStatusContractorScope
02/11/2022CompleteMANGI ELECTRICAL CORPGeneral Wiring
11/09/2021CancelledMANGI ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
07/06/2022Energy Code Compliance Inspectionsanthony santoroprogress
07/06/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/01/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/01/2021Ventilation and air distribution systemanthony santoroenergy_progress
12/01/2021Maintenance informationanthony santoroenergy_progress
12/01/2021Permanent certificateanthony santoroenergy_progress
12/01/2021Energy Code Compliance Inspectionsanthony santoroprogress
12/01/2021Mechanical Systemsanthony santorospecial
12/01/2021Finalanthony santoroprogress
12/01/2021HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/29/2021Final—progress
11/29/2021Mechanical Systemsanthony santorospecial
11/29/2021Energy Code Compliance Inspections—progress
11/29/2021HVAC-R and service water heating equipment—energy_progress
11/29/2021Maintenance information—energy_progress
11/29/2021HVAC-R and service water heating system controls—energy_progress
11/29/2021Ventilation and air distribution system—energy_progress
11/29/2021Permanent certificate—energy_progress
10/20/2021Structural Stability – Alterations of existing buildingsanthony santorospecial
10/19/2021Fire-Resistance Rated Constructionanthony santoroprogress
10/19/2021Energy Code Compliance Inspectionsanthony santoroprogress
10/19/2021Interior lighting poweranthony santoroenergy_progress
10/19/2021Air barrier - visual inspectionanthony santoroenergy_progress
10/19/2021Fenestration air leakageanthony santoroenergy_progress
10/19/2021Insulation placement and R valuesanthony santoroenergy_progress
Latest 25 of 31.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00614381-S1Request digital key ↗
08/25/2026S00614381-I1Request digital key ↗
08/25/2026S00614381-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00614661-I1Open ↗
09/01/2026S00614661-I1Open ↗
08/28/2026S00614381-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00614381-S1Open ↗
08/25/2026S00614661-P1Open ↗
08/25/2026S00614661-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026S00614381-I1Open ↗
08/28/2026S00614381-I1Open ↗
08/25/2026S00614381-S1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00614381-S1Open ↗
08/13/2026S00614661-I1Open ↗
08/13/2026S00614381-I1Open ↗