← Back
Two stories - detached, small or mid-size
122-01 150 AVENUE
QUEENS · BIN 4625506
💬 Discuss this project
2023Year Built
2Stories
A1Building Class
R3-2Zoning
2,537 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Floor 240p · 2 filings · 20 docs
Floor 140p · 2 filings · 20 docs
Cellar42p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2021$775K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS902/05/2026
ADNAN ENGINEERING, P.C.104/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLS DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P & R CONSTRUCTION DEVELOPMENTGeneral Contractor703/21/2026
WATERMARK PLUMBING CORPPlumbing307/08/2026
P & R CONSTR MGT NY CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616802/05/2026
Building Lifecycle
All (72)Filed (10)Permit Issued (9)Signed Off (3)Inspection (8)Objection (12)Special Inspection (30)
03/10/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
03/10/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/10/2026
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
03/10/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
03/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
03/10/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
03/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/10/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
03/10/2026
Special inspection requirement — Shutoff dampers
FAHAD FATEH
03/10/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
03/10/2026
Special inspection requirement — Wood – Prefabricated I-Joists
FAHAD FATEH
03/10/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
03/10/2026
Special inspection requirement — Fireplaces
FAHAD FATEH
03/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/10/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/10/2026
Special inspection requirement — Masonry
FAHAD FATEH
03/10/2026
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
03/10/2026
Special inspection requirement — Final
FAHAD FATEH
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/10/2026
Special inspection requirement — Preliminary
FAHAD FATEH
03/10/2026
Special inspection requirement — Footing and Foundation
FAHAD FATEH
03/10/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/10/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/10/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/10/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/05/2026
Filed — New Building
Proposed new 2 story one family dwelling with cellar.
Q00616681-P8
10/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/15/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/16/2025
Signed off — Alteration
Installation of Soldier piles and lagging for SOE for proposed stair and house. The SOE work in conjunction with Architectural and structural application Q00616681
Q00619270-I1
07/15/2025
Signed off — Alteration
installation of new plumbing and gas fixtures
Q00617419-I1
04/24/2025
Filed — New Building
Proposed new 2 story one family dwelling with cellar.
Q00616681-P6
02/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2025
Permit issued — Mechanical Systems
Q00616681-I1-GC-CX
02/13/2025
Permit issued — General Construction
Q00616681-I1-MS
02/07/2025
Filed — Alteration
installation of new plumbing and gas fixtures
Q00617419-P2
02/05/2025
Signed off — Alteration
installation of temporary construction fence
Q00617407-I1
02/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Permit issued — Plumbing
Q00617419-I1-PL
12/20/2024
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
12/09/2024
Objection resolved — Addressed
11/26/2024
Filed — New Building
Proposed new 2 story one family dwelling with cellar.
Q00616681-P3
11/05/2024
Objection resolved — Addressed
10/07/2024
Objection raised — Inspections
10/07/2024
Objection raised — Inspections
10/07/2024
Objection raised — Fire_Protection
10/07/2024
Objection raised — Scope
09/24/2024
Filed — Alteration
installation of new plumbing and gas fixtures
Q00617419-P1
12/22/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/07/2023
Permit issued — Plumbing
Q00617419-I1-PL
12/01/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/20/2023
Permit issued — Foundation
Q00616681-I1-GC-CX
06/21/2023
Filed — New Building
Proposed new 2 story one family dwelling with cellar.
Q00616681-P1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedP & R CONSTR MGT NY CORP02/13/2025
DOB NOWGeneral ConstructionPermit IssuedP & R CONSTR MGT NY CORP02/13/2025
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP01/23/2025
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP12/07/2023
DOB NOWFoundationPermit IssuedP & R CONSTRUCTION DEVELO07/20/2023
DOB NOWGeneral ConstructionPermit IssuedP & R CONSTRUCTION DEVELO03/27/2023
DOB NOWSupport of ExcavationSigned-offP & R CONSTRUCTION DEVELO03/21/2023
DOB NOWConstruction FenceSigned-offP & R CONSTRUCTION DEVELO01/27/2023
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP07/11/2022
1 project · most recent 02/05/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/05/2026Permit IssuedP & R CONSTR MGT NY CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane 4TTR3048N1000AA 48,000 BTU · Split System ×6
4TTR3036N1000BA 36,000 BTU · Split System ×3
Lg ARUN036GSS5 42,000 BTU · Vrf Outdoor ×3
Heating
Laars MFTHW140NA2 133,000 BTU · Boiler ×3
MFTHW140NA2XN 133,000 BTU · Boiler ×3
Navien NFC-250/200H 183,000 BTU · Boiler ×2
Ventilation
Panasonic RG-C811A 50 CFM · Exhaust Fan ×15
RG-C8118 50 CFM · Exhaust Fan ×3
Delta SLM-50 50 CFM · Exhaust Fan ×10
RG-C8118 50 CFM · Exhaust Fan ×2
Fantech ATMO 200E 200 CFM · Erv ×5
Zline 8654STZ-48-CB 700 CFM · Kitchen Exhaust ×3
Air King ESDQ 270 CFM · Kitchen Exhaust ×1
8654STZ-48-CB 270 CFM · Kitchen Exhaust ×1
Renewaire EV130 140 CFM · Erv ×1
3 projects · most recent 06/22/2025
General Wiring
FiledStatusContractorScope
06/22/2025CompleteTRIUMPH ELECTRIC SVC LLCGeneral Wiring
05/22/2025CompleteTRIUMPH ELECTRIC SVC LLCGeneral Wiring
09/30/2022CompleteSCOTT ELEC'L SERVICE, LLC1 meters, 1 new_meters
1 project · most recent 02/05/2026
Steel Concrete Wood
FiledStatusContractorScope
02/05/2026Permit IssuedP & R CONSTR MGT NY CORPSteel, Concrete, Wood
1 project · most recent 02/05/2026
Earthwork
FiledStatusContractorScope
02/05/2026Permit IssuedP & R CONSTR MGT NY CORPEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/01/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 109
DateRequirementInspectorRole
03/10/2026Wood – Prefabricated I-JoistsFAHAD FATEHspecial
03/10/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/10/2026Permanent certificateFAHAD FATEHenergy_progress
03/10/2026Fenestration areasFAHAD FATEHenergy_progress
03/10/2026Air barrier — testing FAHAD FATEHenergy_progress
03/10/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/10/2026Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
03/10/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/10/2026FireplacesFAHAD FATEHenergy_progress
03/10/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/10/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/10/2026Ventilation and air distribution systemFAHAD FATEHenergy_progress
03/10/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
03/10/2026Maintenance informationFAHAD FATEHenergy_progress
03/10/2026Shutoff dampersFAHAD FATEHenergy_progress
03/10/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/10/2026Interior lighting powerFAHAD FATEHenergy_progress
03/10/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/10/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
03/10/2026Footing and FoundationFAHAD FATEHprogress
03/10/2026PreliminaryFAHAD FATEHprogress
03/10/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/10/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/10/2026FinalFAHAD FATEHprogress
03/10/2026Subgrade InspectionsFAHAD FATEHspecial
Latest 25 of 109.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026Q00617407-I1Request digital key ↗
08/26/2026Q00619270-I1Request digital key ↗
08/21/2026Q00617419-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
12/11/2024440692528Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/30/2021440692528Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00616681-P8Open ↗
08/13/2026Q00616681-I1Open ↗
08/13/2026Q00616681-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00616681-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026Q00616681-P1Open ↗
09/01/2026Q00616681-P1Open ↗
09/01/2026Q00616681-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q00616681-P1Open ↗
09/01/2026Q00616681-P1Open ↗
08/23/2026Q00616681-P8Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026Q00617419-P2Open ↗
08/21/2026Q00617419-P1Open ↗
08/21/2026Q00617419-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/30/2021440692528Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/30/2021440692528Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026Q00616681-P8Open ↗
08/13/2026Q00616681-I1Open ↗
08/13/2026Q00616681-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00616681-I1Open ↗
08/13/2026Q00616681-P3Open ↗
08/13/2026Q00616681-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
03/21/2022440692528Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00616681-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00616681-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00616681-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00617419-I1Open ↗
08/13/2026Q00616681-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/13/2026Q00616681-P1Open ↗
08/13/2026Q00616681-P3Open ↗
08/13/2026Q00616681-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00616681-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/30/2021440692528Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial5
08/13/2026Q00616681-P6Open ↗
08/13/2026Q00616681-P3Open ↗
08/13/2026Q00616681-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/14/2026Q00616681-I1Open ↗
08/13/2026Q00616681-P1Open ↗
08/13/2026Q00616681-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026Q00616681-P1Open ↗
08/17/2026Q00616681-P6Open ↗
08/17/2026Q00616681-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00616681-I1Open ↗
08/13/2026Q00619270-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/21/2022440692528Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00616681-I1Open ↗