← Back
Miscellaneous religious facility
122-18 SUTPHIN BOULEVARD
QUEENS · Baisley Park · BIN 4261523
💬 Discuss this project
1930Year Built
2Stories
M9Building Class
R6BZoning
3,600 sfGross Floor Area
1Units
5 Open Violations 1 unresolved · 4 paperwork only ▸FDNY Report ↗
Miscellaneous religious facility · 2,032 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD407/08/2026
KATARIA LLC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AFM INSPECTIONS & ENGINEERING, PLLC110/05/2022
GREEN DESIGN102/26/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor603/21/2026
G.N. CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AFM INSPECTIONS & ENGINEE4675110/05/2022
Building Lifecycle
All (15)Filed (2)Permit Issued (3)Signed Off (1)Violation (7)Special Inspection (2)
06/26/2023
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATIONS TO REPAIR THE EXISTING BRICK FACADE & RESTORE IT BACK TO ITS ORIGINAL CONDITION. ALSO INSTALL NEW LINTELS OVER THE WINDOW ON THE FRONT, SIDE, AND REAR OF THE BUILDING.
Q08012245-I1
05/03/2023
Permit issued — General Construction
Q08012245-I1-GC
10/05/2022
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATIONS TO REPAIR THE EXISTING BRICK FACADE & RESTORE IT BACK TO ITS ORIGINAL CONDITION. ALSO INSTALL NEW LINTELS OVER THE WINDOW ON THE FRONT, SIDE, AND REAR OF THE BUILDING.
Q08012245-I1
09/28/2022
Special inspection requirement — Masonry
Anthony Marmo
09/28/2022
Special inspection requirement — Final
Anthony Marmo
09/14/2022
Permit issued — Sidewalk Shed
Q00260482-I1-SH
08/31/2022
Violation issued (ECB, open)
Construction
06/09/2022
Violation issued (ECB, open)
Construction
02/29/2020
Permit issued — Sidewalk Shed
Q00260482-I1-SH
02/26/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET.
Q00260482-I1
02/05/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2019
Violation issued (ECB, open)
Construction
06/26/1999
Violation issued (ECB, closed)
Construction
09/29/1995
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHOPE HOME IMPROVEMENT INC05/03/2023
DOB NOWSidewalk ShedPermit IssuedHOPE HOME IMPROVEMENT INC09/14/2022
DOB NOWSidewalk ShedPermit IssuedEMPIRE CONSTRUCTION ASSOC02/29/2020
1 project · most recent 02/26/2020
Sidewalk Shed
FiledStatusContractorScope
02/26/2020Permit IssuedHOPE HOME IMPROVEMENT INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/28/2022MasonryAnthony Marmospecial
09/28/2022FinalAnthony Marmoprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00260482-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026Q08012245-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q08012245-I1Open ↗
08/13/2026Q00260482-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026Q08012245-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q08012245-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q08012245-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00260482-I1Open ↗