← Back
Primarily 3 family with 1 store or office
122 AVENUE C
MANHATTAN · East Village · BIN 1004502
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
R7AZoning
3,290 sfGross Floor Area
4Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 122 ASSETS LLC · 1,260 sf lot · 2.61 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
122 ASSETS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR HUGO MARTINEZ, PE208/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW IMAGE GEN. CONTRACTOR5266208/20/2026
Building Lifecycle
All (36)Filed (2)Violation (26)Special Inspection (8)
08/20/2026
Filed — Alteration
APPLICATION FOR MINOR PLUMBING WORK AT THE COMMERCIAL KITCHEN IN THIS EXISTING (AS PER CERT. OF OCCUPANCY # 99753) EATING AND DRINKING ESTABLISHMENT USE GROUP 6 (U.G. 6), AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01434050-S1
08/20/2026
Filed — Alteration
APPLICATION FOR MINOR PLUMBING WORK AT THE COMMERCIAL KITCHEN IN THIS EXISTING (AS PER CERT. OF OCCUPANCY # 99753) EATING AND DRINKING ESTABLISHMENT USE GROUP 6 (U.G. 6), AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01434050-I1
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
VICTOR MARTINEZ
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
07/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
VICTOR MARTINEZ
07/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
VICTOR MARTINEZ
07/21/2026
Special inspection requirement — Final
VICTOR MARTINEZ
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
07/21/2026
Special inspection requirement — Post-installed Anchors
VICTOR MARTINEZ
07/21/2026
Special inspection requirement — Mechanical Systems
VICTOR MARTINEZ
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, closed)
A
05/06/2024
Violation issued (FDNY_ORDER, closed)
05/06/2024
Violation issued (FDNY_ORDER, closed)
05/06/2024
Violation issued (FDNY_ORDER, closed)
11/15/2023
Violation issued (HPD, closed)
I
03/15/2023
Violation issued (HPD, closed)
A
12/21/2022
Violation issued (HPD, closed)
C
12/21/2022
Violation issued (HPD, closed)
C
12/21/2022
Violation issued (HPD, closed)
C
12/21/2022
Violation issued (HPD, closed)
C
11/02/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/24/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
04/26/2014
Violation issued (HPD, open)
B
11/05/2012
Violation issued (HPD, closed)
B
11/05/2012
Violation issued (HPD, closed)
C
11/05/2012
Violation issued (HPD, closed)
C
11/05/2012
Violation issued (HPD, closed)
C
11/05/2012
Violation issued (HPD, closed)
C
11/05/2012
Violation issued (HPD, closed)
C
11/05/2012
Violation issued (HPD, closed)
C
11/05/2012
Violation issued (HPD, closed)
B
05/21/2009
Violation issued (HPD, open)
B
Nothing on file for this building.
1 project · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier GEMINI SPLIT SYSTEM 38ARZ003 58,000 BTU · Split System ×1
Ventilation
Dayton DAYTON / 800W87 8,000 CFM · Exhaust Fan ×1
Penn Barry MU 4015 3,200 CFM ×1
1 project · most recent 08/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/20/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/20/2026Energy Code Compliance InspectionsVICTOR MARTINEZprogress
08/20/2026Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
07/31/2026Tenant Protection Plan ComplianceVICTOR MARTINEZspecial
07/31/2026Tenant Protection Plan ComplianceVICTOR MARTINEZspecial
07/21/2026FinalVICTOR MARTINEZprogress
07/21/2026Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
07/21/2026Post-installed AnchorsVICTOR MARTINEZspecial
07/21/2026Mechanical SystemsVICTOR MARTINEZspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026M01434050-S1Request digital key ↗
08/21/2026M01434050-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026M01434050-I1Open ↗
08/21/2026M01434050-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M01434050-S1Open ↗
08/28/2026M01434050-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01434050-S1Open ↗
08/28/2026M01434050-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026M01434050-I1Open ↗
08/21/2026M01434050-S1Open ↗