← Back
Four families
122 CLINTON AVENUE
BROOKLYN · BIN 3331455
💬 Discuss this project
1905Year Built
3Stories
C3Building Class
R5BZoning
3,000 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸
Four families · Owner of record: DESCENDENT'S SEPARATE TRUST F/B/O MARIA M. SOARES · 6,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 2 filings · 9 docs
Penthouse3p · 1 filing · 11 docs
Floor 33p · 2 filings · 18 docs
Floor 21p · 1 filing · 7 docs
Floor 13p · 3 filings · 20 docs
Basement4p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
218 BROOKLYN409/23/2026
DESCENDENT'S SEPARATE TRUST F/B/O MARIA M. SOARES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEVILLE ENGINEERING GROUP908/28/2026
NYC SPECIAL CONTRACTORS308/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LBM CONSTRUCTION OF NY INGeneral Contractor109/23/2026
Building Lifecycle
All (57)Filed (12)Permit Issued (1)Violation (12)Objection (6)Special Inspection (26)
09/22/2026
Permit issued — Construction Fence
B01371122-I1-FN
09/19/2026
Objection resolved — Resolved
09/19/2026
Objection resolved — Resolved
09/17/2026
Objection raised — Scope
09/01/2026
Objection raised — Fire_Protection
08/28/2026
Filed — New Building
Proposed installation of mini split heat pump system throughout building, including central ERV system.
B01373202-S3
08/24/2026
Special inspection requirement — Metering
08/24/2026
Special inspection requirement — Electrical motors and elevators
08/24/2026
Special inspection requirement — Lighting controls
08/05/2026
Filed — New Building
Proposed installation of mini split heat pump system throughout building, including central ERV system.
B01373202-S4
08/05/2026
Special inspection requirement — Final
08/05/2026
Special inspection requirement — Structural Cold-Formed Steel
08/05/2026
Special inspection requirement — Concrete - Cast-In-Place
08/03/2026
Filed — Alteration
Proposed installation of Supported Scaffold which located in the front yard along the front wall of the building, as a temporary equipment only in conjunction with work filed under SH#B01437841 & NB #B01373202 & FD #B01367096, as per plans.
B01438943-I1
08/03/2026
Filed — Alteration
Installation of 60 Ln. Ft. of heavy duty 12 Ft. high sidewalk shed during demolition & new building construction, filed under job #B01373202. Sidewalk shed shall comply with chapter #33 of the NYC BC. No change in use, occupancy or egress under this app.
B01437841-I1
08/03/2026
Filed — New Building
Proposed installation of mini split heat pump system throughout building, including central ERV system.
B01373202-S2
08/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER BC 3307.7.4 & BC 3307.7.6.
B01371122-P1
07/31/2026
Filed — Alteration
Proposed Filing for Structural Work in Conjunction with New Building Jobs #B01373206, # B01373205 & #B01373202, as per plans.
B01438377-I1
07/30/2026
Special inspection requirement — Post-installed Anchors
07/29/2026
Filed — Alteration
PROPOSED FILING FOR FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING JOB #B01387616
B01437779-I1
07/22/2026
Filed — New Building
Proposed installation of mini split heat pump system throughout building, including central ERV system.
B01373202-I1
05/04/2026
Violation issued (HPD, open)
A
04/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER BC 3307.7.4 & BC 3307.7.6.
B01371122-I1
04/22/2026
Objection raised — Other
04/22/2026
Objection resolved — Resolved
04/09/2026
Filed — Full Demolition
Proposed full demolition of existing three (3) story and cellar building, as per plans.
B01367096-I1
04/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
04/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/06/2026
Filed — Alteration
Installation of Curb Cut for new one (1) car garage.
B01382724-I1
03/31/2026
Special inspection requirement — Air barrier continuity plan testing
03/31/2026
Special inspection requirement — Exterior lighting power
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/31/2026
Special inspection requirement — Interior lighting power
03/31/2026
Special inspection requirement — Insulation placement and R values
03/31/2026
Special inspection requirement — Fenestration air leakage
03/31/2026
Special inspection requirement — Lighting in dwelling units
03/31/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
03/31/2026
Special inspection requirement — Air barrier — testing
03/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/31/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/31/2026
Special inspection requirement — Air barrier - visual inspection
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
03/31/2026
Special inspection requirement — Fenestration areas
11/18/2025
Violation issued (HPD, closed)
I
06/09/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, closed)
I
04/09/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, closed)
I
03/22/2023
Violation issued (HPD, open)
A
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, open)
A
04/07/2021
Violation issued (HPD, closed)
A
10/16/2018
Violation issued (HPD, closed)
I
02/24/1988
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedLBM CONSTRUCTION OF NY IN09/22/2026
3 projects · most recent 08/28/2026
Concrete Steel
FiledStatusContractorScope
08/28/2026——Concrete
07/31/2026——Steel
07/29/2026——2 scope_items
3 projects · most recent 08/03/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
08/03/2026——Sidewalk Shed
08/03/2026——Scaffold
08/01/2026Permit IssuedLBM CONSTRUCTION OF NY INFence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/24/2026Metering—energy_progress
08/24/2026Electrical motors and elevators—energy_progress
08/24/2026Lighting controls—energy_progress
08/05/2026Final—progress
08/05/2026Structural Cold-Formed Steel—special
08/05/2026Concrete - Cast-In-Place—special
07/30/2026Post-installed Anchors—special
04/07/2026HVAC-R and service water heating system controls—energy_progress
04/07/2026Energy Code Compliance Inspections—progress
04/07/2026HVAC-R and service water heating equipment—energy_progress
04/07/2026HVAC-R and service water piping design and insulation—energy_progress
03/31/2026Air barrier continuity plan testing—energy_progress
03/31/2026Exterior lighting power—energy_progress
03/31/2026Fire-Resistant Penetrations and Joints—special
03/31/2026Interior lighting power—energy_progress
03/31/2026Insulation placement and R values—energy_progress
03/31/2026Fenestration air leakage—energy_progress
03/31/2026Lighting in dwelling units—energy_progress
03/31/2026Exterior Insulation and Finish Systems (EIFS)—special
03/31/2026Air barrier — testing —energy_progress
03/31/2026Fire-Resistance Rated Construction—progress
03/31/2026Electric vehicle service equipment requirements—energy_progress
03/31/2026Fenestration and door U-factor and product ratings—energy_progress
03/31/2026Air barrier - visual inspection—energy_progress
03/31/2026Energy Code Compliance Inspections—progress
Latest 25 of 26.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/03/2026B01367096-I1Request digital key ↗
08/17/2026B01382724-I1Request digital key ↗
08/17/2026B01371122-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01373202-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01373202-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026B01367096-I1Open ↗
08/17/2026B01382724-I1Open ↗
08/17/2026B01371122-P1Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026B01373202-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026B01373202-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/03/2026B01367096-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B01367096-I1Open ↗
▸Other Documents5
▸DOB NOWCommunity Board Notification1
09/03/2026B01367096-I1Open ↗
▸DOB NOWProperty Ownership Certification1
09/03/2026B01367096-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
09/03/2026B01367096-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026B01373202-I1Open ↗
▸DOB NOWStructure Photographs1
09/03/2026B01367096-I1Open ↗