Four families
122 WEST 124 STREET
MANHATTAN · Harlem (South) · BIN 1057797
💬 Discuss this project
1910Year Built
5Stories
C3Building Class
C4-4Zoning
12,382 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Four families · Owner of record: 122-124 W 124TH ST LLC · 3,784 sf lot · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionCivil
Roof28p · 3 filings · 20 docs
Penthouse28p · 3 filings · 20 docs
Floor 427p · 3 filings · 20 docs
Floor 328p · 4 filings · 20 docs
Floor 227p · 3 filings · 20 docs
Floor 129p · 3 filings · 20 docs
Cellar27p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COHABS3107/08/2026
141 ENGERT2607/08/2026
122-124 W 124TH ST LLC103/22/2026
HIRAM GRAND LODGE BOARD OF TRUST103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2022$3.1M—Private party → 122-124 W 124TH ST LLC$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC611/20/2024
CAVALRY ASSOCIATES1208/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY2303/21/2026
CAVALRY MANAGEMENT603/21/2026
CAVALRY ASSOCIATES COM103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor1707/08/2026
P.H. WORKS INCPlumbing207/08/2026
S & J INDUSTRIAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC31291411/20/2024
Building Lifecycle
All (150)Filed (18)Permit Issued (12)Signed Off (5)Violation (27)Inspection (12)Objection (46)Special Inspection (30)
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
B
12/04/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
12/04/2024
Special inspection requirement — Metering
NANIK MASSAND
12/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
12/04/2024
Special inspection requirement — Permanent certificate
NANIK MASSAND
12/04/2024
Special inspection requirement — Air barrier - visual inspection
NANIK MASSAND
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
12/04/2024
Special inspection requirement — Lighting in dwelling units
NANIK MASSAND
12/04/2024
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
12/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
12/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NANIK MASSAND
12/04/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NANIK MASSAND
12/04/2024
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
12/04/2024
Special inspection requirement — Fenestration areas
NANIK MASSAND
12/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
12/04/2024
Special inspection requirement — Interior lighting power
NANIK MASSAND
12/04/2024
Special inspection requirement — Lighting controls
NANIK MASSAND
12/04/2024
Special inspection requirement — Exterior lighting power
NANIK MASSAND
12/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
12/03/2024
Violation issued (HPD, closed)
I
11/20/2024
Filed — Alteration CO
INTERIOR RETROFITTING WITH ADDITIONAL PENTHOUSE. CHANGING USE OF EXISTING COMMERCIAL BUILDING TO RESIDENTIAL
M00578237-P6
08/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2024
Filed — Alteration CO
INTERIOR RETROFITTING WITH ADDITIONAL PENTHOUSE. CHANGING USE OF EXISTING COMMERCIAL BUILDING TO RESIDENTIAL
M00578237-P5
07/22/2024
Special inspection requirement — Lighting in dwelling units
NANIK MASSAND
07/22/2024
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
07/22/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
07/22/2024
Special inspection requirement — Interior lighting power
NANIK MASSAND
07/22/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NANIK MASSAND
07/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
07/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
07/22/2024
Special inspection requirement — Fenestration areas
NANIK MASSAND
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
07/22/2024
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
06/28/2024
Filed — Alteration CO
INTERIOR RETROFITTING WITH ADDITIONAL PENTHOUSE. CHANGING USE OF EXISTING COMMERCIAL BUILDING TO RESIDENTIAL
M00578237-P4
02/29/2024
Violation issued (FDNY_NOV, closed)
11/27/2023
Violation issued (HPD, closed)
I
11/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/19/2023
Signed off — Alteration
MECHANICAL FILING IN CONJUNCTION WITH ALT 1 APPLICATION M00578237. NEW MECHANICAL EXHAUST,VENTILATION AND HEATING/COOLING SYSTEMS THROUGHOUT ENTIRE BUILDING. REUSE OF EXISTINGTWO GAS BOILERS AND GAS HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00586591-I1
10/19/2023
Signed off — Alteration
STRUCTURAL FILING IN CONJUNCTION WITH DOB APPLICATION M00578237. NO CHANGE IN USE, EXITS OR OCCUPANCY.
M00694540-I1
10/11/2023
Signed off — Alteration
PLUMBING AND SPRINKLER FILING IN CONJUNCTION WITH ALT1 APPLICATION M00578237. NEW SANITARY AND WATERSYSTEMS. ALL EXISTING GAS FIXTURES TO BE REPLACEDBY NEW ELECTRIC FIXTURES. 2 new backflow NEW AUTOMATIC WET SPRINKLERS
M00586585-I1
08/16/2023
Filed — Alteration
PLUMBING AND SPRINKLER FILING IN CONJUNCTION WITH ALT1 APPLICATION M00578237. NEW SANITARY AND WATERSYSTEMS. ALL EXISTING GAS FIXTURES TO BE REPLACEDBY NEW ELECTRIC FIXTURES. 2 new backflow NEW AUTOMATIC WET SPRINKLERS
M00586585-P5
08/15/2023
Filed — Alteration CO
INTERIOR RETROFITTING WITH ADDITIONAL PENTHOUSE. CHANGING USE OF EXISTING COMMERCIAL BUILDING TO RESIDENTIAL
M00578237-P3
07/26/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/06/2023
Signed off — Alteration
PLUMBING DEMOLITION FILING IN CONJUNCTION WITH ALT II APPLICATION #M00729750 CAPPING AND ABANDONING EXISITNG (GAS WATER HEATER, BOILERS, GAS SERVICES, GAS METER AND GAS PIPES IN THE BUILDING).
M00729756-I1
07/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2023
Filed — Alteration
MECHANICAL FILING IN CONJUNCTION WITH ALT 1 APPLICATION M00578237. NEW MECHANICAL EXHAUST,VENTILATION AND HEATING/COOLING SYSTEMS THROUGHOUT ENTIRE BUILDING. REUSE OF EXISTINGTWO GAS BOILERS AND GAS HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00586591-P1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/28/2023
Filed — Alteration
PLUMBING AND SPRINKLER FILING IN CONJUNCTION WITH ALT1 APPLICATION M00578237. NEW SANITARY AND WATERSYSTEMS. ALL EXISTING GAS FIXTURES TO BE REPLACEDBY NEW ELECTRIC FIXTURES. 2 new backflow NEW AUTOMATIC WET SPRINKLERS
M00586585-P4
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR03/03/2023
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR02/28/2023
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR02/24/2023
DOB NOWSprinklersSigned-offS & J INDUSTRIAL CORP11/22/2022
DOB NOWPlumbingSigned-offP.H. WORKS INC09/30/2022
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR08/10/2022
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR08/02/2022
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR07/29/2022
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR07/21/2022
DOB NOWConstruction FenceSigned-offMETHOD GENERAL CONTRACTOR07/20/2022
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR06/01/2022
DOB NOWPlumbingSigned-offP.H. WORKS INC05/31/2022
BISOTISSUEDALTANTIC DIVERS. INC.12/08/2004
3 projects · most recent 07/14/2023
General Wiring
FiledStatusContractorScope
07/14/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
07/14/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
08/12/2022CompleteFRIED ELECTRIC CO.—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/29/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/31/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
12/04/2024Exterior Insulation and Finish Systems (EIFS)NANIK MASSANDspecial
12/04/2024Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
12/04/2024HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
12/04/2024HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
12/04/2024MeteringNANIK MASSANDenergy_progress
12/04/2024HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
12/04/2024Fenestration air leakageNANIK MASSANDenergy_progress
12/04/2024Exterior lighting powerNANIK MASSANDenergy_progress
12/04/2024Lighting controlsNANIK MASSANDenergy_progress
12/04/2024Lighting in dwelling unitsNANIK MASSANDenergy_progress
12/04/2024Air barrier - visual inspectionNANIK MASSANDenergy_progress
12/04/2024Insulation placement and R valuesNANIK MASSANDenergy_progress
12/04/2024Permanent certificateNANIK MASSANDenergy_progress
12/04/2024Fenestration areasNANIK MASSANDenergy_progress
12/04/2024Interior lighting powerNANIK MASSANDenergy_progress
12/04/2024Fire-Resistance Rated ConstructionNANIK MASSANDprogress
12/04/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
12/04/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
12/04/2024Concrete - Cast-In-PlaceNANIK MASSANDspecial
07/22/2024HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
07/22/2024Concrete - Cast-In-PlaceNANIK MASSANDspecial
07/22/2024Exterior Insulation and Finish Systems (EIFS)NANIK MASSANDspecial
07/22/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/22/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
07/22/2024Fire-Resistance Rated ConstructionNANIK MASSANDprogress
Latest 25 of 130.
▾Documents — 191 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00586597-I1Request digital key ↗
09/03/2026M00586591-P1Request digital key ↗
09/02/2026M00694540-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits6
▸BISBPP-5 - Authorization to the Department of Transportation3
04/17/2024141006275Open ↗
03/29/2022141006275Open ↗
12/06/2021141006275Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
06/16/2023141006275Open ↗
03/24/2022141006275Open ↗
12/06/2021141006275Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026M00578237-P1Open ↗
08/13/2026M00578237-P3Open ↗
08/13/2026M00578237-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026M00578237-P3Open ↗
08/13/2026M00578237-P4Open ↗
08/13/2026M00578237-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00578237-I1Open ↗
▸Seals & Professional Certifications86
▸DOB NOWProgress Inspector Seal & Signature40
08/31/2026M00578237-P3Open ↗
08/31/2026M00578237-P3Open ↗
08/31/2026M00586585-P3Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
08/31/2026M00578237-P3Open ↗
08/31/2026M00578237-P3Open ↗
08/31/2026M00586585-P3Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00586597-I1Open ↗
09/03/2026M00586591-I1Open ↗
09/02/2026M00578237-P4Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/06/2021141006275Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/06/2021141006275Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/27/2023141006275Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
09/02/2026M00578237-P5Open ↗
09/02/2026M00578237-P6Open ↗
09/02/2026M00578237-P3Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
12/06/2021141006275Open ↗
▸BISSTREET TREE CHECKLIST1
12/06/2021141006275Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00578237-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00578237-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00578237-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/02/2026M00578237-P4Open ↗
09/02/2026M00578237-P5Open ↗
09/02/2026M00578237-P6Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00578237-I1Open ↗
08/13/2026M00586591-I1Open ↗
08/13/2026M00586585-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP: FIELD INSPECTION1
12/07/2023141006275Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/06/2021141006275Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/08/2024141006275Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
12/07/2023141006275Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/26/2024141006275Open ↗
06/27/2023141006275Open ↗
03/29/2022141006275Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/06/2021141006275Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/06/2021141006275Open ↗
▸Other Documents33
▸DOB NOWPlot Diagram6
08/13/2026M00578237-P1Open ↗
08/13/2026M00578237-I1Open ↗
08/13/2026M00578237-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026M00578237-I1Open ↗
08/13/2026M00578237-P3Open ↗
08/13/2026M00578237-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026M00578237-I1Open ↗
08/13/2026M00578237-P1Open ↗
08/13/2026M00578237-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
09/02/2026M00578237-P5Open ↗
09/02/2026M00578237-P6Open ↗
09/02/2026M00578237-P3Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
12/07/2023141006275Open ↗
03/29/2022141006275Open ↗
12/06/2021141006275Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
12/07/2023141006275Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/26/2024141006275Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/06/2021141006275Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
12/07/2023141006275Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00578237-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00578237-I1Open ↗