← Back
Walk-up cooperative
122 WEST 73 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1029966
💬 Discuss this project
1882Year Built
3Stories
C6Building Class
R8BZoning
3,680 sfGross Floor Area
8Units
Rent Stabilized38 Open Violations ▸
Walk-up cooperative · Owner of record: 122 W 73 L.P. · 1,703 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 6 docs
Penthouse1p · 1 filing · 20 docs
Floor 45p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
Cellar7p · 3 filings · 20 docs
Basement1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
122 W 73 L P6907/08/2026
PLATINUM SERVICES NY1007/08/2026
FIRST STANDARD CONSTRUCTION703/22/2026
MAJOR GENERAL CON 1503/22/2026
BRENMAC303/21/2026
122 OWNERS LLC & 73 OWNERS LLC1203/21/2026
ONE DOUBLE DEUCE OWNERS503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/01/2020$4.0M—— → —$1,092/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
SANDEEP KAUR103/21/2026
GREEN STUDIO203/21/2026
MUNICIPAL BUILDING CONSULTANTS1903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST STANDARD CONSTR INCGeneral Contractor2407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1007/08/2026
MAJOR GENERAL CON 1 CORPGeneral Contractor303/21/2026
EMERALD MECHL SOLUTIONS IPlumbing307/08/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
VILLAGE P & H NY INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4231402/28/2024
Building Lifecycle
All (187)Filed (22)Permit Issued (19)Signed Off (10)Violation (54)Inspection (6)Objection (46)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/10/2024
Signed off — Alteration
installation of sprinkler system as per plans filed herewith
M00518587-I1
07/09/2024
Signed off — Alteration
installation of mechanical system as per plans filed herewith
M00518573-I1
07/09/2024
Signed off — Alteration
installation of plumbing fixtures as per plans filed herewith
M00518579-I1
05/17/2024
Filed — Alteration
installation of plumbing fixtures as per plans filed herewith
M00518579-P4
04/02/2024
Signed off — Alteration
RENOVATION, CONVERSION AND ENLARGEMENT OF EXISTING MULTIPLE DWELLING BUILDING TO 2 FAMILY RESIDENCE. NEW C OF O TO BE OBTAINED.
M00458869-I1
04/01/2024
Signed off — Alteration
foundation work for proposed conversion and enlargement
M00464078-I1
04/01/2024
Violation issued (HPD, open)
A
03/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2024
Signed off — Alteration
structural work filed renovation work consisting of enlargement and converting from 8 units to 2 dwelling units
M00464054-I1
03/07/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Filed — Alteration
installation of mechanical system as per plans filed herewith
M00518573-P1
02/27/2024
Filed — Alteration
installation of plumbing fixtures as per plans filed herewith
M00518579-P3
02/20/2024
Special inspection requirement — Sprinkler Systems
Young Suh
02/19/2024
Filed — Alteration
installation of sprinkler system as per plans filed herewith
M00518587-P2
02/15/2024
Filed — Alteration
RENOVATION, CONVERSION AND ENLARGEMENT OF EXISTING MULTIPLE DWELLING BUILDING TO 2 FAMILY RESIDENCE. NEW C OF O TO BE OBTAINED.
M00458869-P4
02/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
02/15/2024
Special inspection requirement — Chimneys and vents
Young Suh
02/15/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Young Suh
02/15/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Young Suh
02/15/2024
Special inspection requirement — Final
Young Suh
02/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
02/01/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED,ROOF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00683397-I1
01/16/2024
Signed off — Alteration
proposed SOE work for a proposed residential home.
M00464161-I1
01/16/2024
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
M00727589-I1
01/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M08041401-I1
12/19/2023
Special inspection requirement — Final
Young Suh
12/19/2023
Special inspection requirement — Mechanical Systems
Young Suh
12/19/2023
Special inspection requirement — Heating Systems
Young Suh
11/15/2023
Violation issued (HPD, open)
I
09/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/01/2023
Filed — Alteration
installation of plumbing fixtures as per plans filed herewith
M00518579-P2
06/05/2023
Permit issued — Foundation
M00464078-I1-FO
06/02/2023
Permit issued — Mechanical Systems
M00518573-I1-MS
06/02/2023
Permit issued — Support of Excavation
M00464161-I1-SE
06/01/2023
Filed — Alteration
RENOVATION, CONVERSION AND ENLARGEMENT OF EXISTING MULTIPLE DWELLING BUILDING TO 2 FAMILY RESIDENCE. NEW C OF O TO BE OBTAINED.
M00458869-P2
05/31/2023
Permit issued — Plumbing
M00518579-I1-PL
05/09/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Young Suh
05/09/2023
Special inspection requirement — Chimneys and vents
Young Suh
05/09/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Young Suh
05/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
05/09/2023
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
05/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
05/09/2023
Special inspection requirement — Final
Young Suh
03/27/2023
Permit issued — General Construction
M00458869-I1-GC
03/24/2023
Permit issued — Structural
M00464054-I1-ST
03/20/2023
Permit issued — Plumbing
M00518579-I1-PL
03/16/2023
Violation issued (HPD, open)
A
02/14/2023
Permit issued — Sidewalk Shed
M00683397-I1-SF
02/14/2023
Permit issued — Sidewalk Shed
M00683397-I1-SH
02/07/2023
Permit issued — Sprinklers
M00518587-I1-EW-SP
02/03/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/09/2023
Permit issued — Construction Fence
M08041401-I1-FN
01/06/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M08041401-I1
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offFIRST STANDARD CONSTR INC06/05/2023
DOB NOWMechanical SystemsSigned-offFIRST STANDARD CONSTR INC06/02/2023
DOB NOWSupport of ExcavationSigned-offFIRST STANDARD CONSTR INC06/02/2023
DOB NOWPlumbingSigned-offA & C PLBG & HTG CO., INC05/31/2023
DOB NOWGeneral ConstructionSigned-offFIRST STANDARD CONSTR INC03/27/2023
DOB NOWStructuralSigned-offFIRST STANDARD CONSTR INC03/24/2023
DOB NOWPlumbingSigned-offA & C PLBG & HTG CO., INC03/20/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/14/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/14/2023
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC02/07/2023
DOB NOWConstruction FenceSigned-offFIRST STANDARD CONSTR INC01/09/2023
DOB NOWPlumbingSigned-offA & C PLBG & HTG CO., INC06/24/2022
DOB NOWSupport of ExcavationSigned-offFIRST STANDARD CONSTR INC06/23/2022
DOB NOWMechanical SystemsSigned-offFIRST STANDARD CONSTR INC06/23/2022
DOB NOWSupported ScaffoldSigned-offMAJOR GENERAL CON 1 CORP04/29/2022
DOB NOWGeneral ConstructionSigned-offFIRST STANDARD CONSTR INC04/07/2022
DOB NOWStructuralSigned-offFIRST STANDARD CONSTR INC03/19/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/25/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/25/2022
BIS—ISSUED122 WEST 73RD STREET04/04/2023
BIS—ISSUED122 WEST 73RD ST L.L.P03/30/2022
BISEQISSUEDBRENMAC CORP01/25/2017
BISPLISSUEDMAC FELDER INC11/25/2009
BISBLISSUEDNEW YORK HEATING CORP09/17/2009
BISPLISSUEDNEW YORK HEATING CORP09/17/2009
4 projects · most recent 09/09/2022
General Wiring
FiledStatusContractorScope
09/09/2022CompleteSTAR ELEC'L CONTRACTORS C—
07/13/2022CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
05/03/2022CompleteFSM ELECTRICAL CORPORATIO—
02/18/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
02/20/2024Sprinkler SystemsYoung Suhspecial
02/15/2024Structural Stability – Alterations of existing buildingsYoung Suhspecial
02/15/2024Chimneys and ventsYoung Suhspecial
02/15/2024Exterior Insulation and Finish Systems (EIFS)Young Suhspecial
02/15/2024Wall Panels, Curtain Walls, and VeneersYoung Suhspecial
02/15/2024FinalYoung Suhprogress
02/15/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
12/19/2023FinalYoung Suhprogress
12/19/2023Mechanical SystemsYoung Suhspecial
12/19/2023Heating SystemsYoung Suhspecial
05/09/2023Wall Panels, Curtain Walls, and VeneersYoung Suhspecial
05/09/2023Chimneys and ventsYoung Suhspecial
05/09/2023Exterior Insulation and Finish Systems (EIFS)Young Suhspecial
05/09/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
05/09/2023Sprayed fire-resistant materialsYoung Suhspecial
05/09/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
05/09/2023FinalYoung Suhprogress
11/04/2022Sprinkler SystemsYoung Suhspecial
07/26/2022Footing and FoundationYoung Suhprogress
07/26/2022Concrete - Cast-In-PlaceYoung Suhspecial
07/26/2022Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
07/26/2022FinalYoung Suhprogress
07/22/2022Excavations - Sheeting, Shoring, and BracingYoung Suhspecial
06/29/2022Concrete - Cast-In-PlaceYoung Suhspecial
06/29/2022Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
Latest 25 of 42.
▾Documents — 260 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch13
09/03/2026M00518573-I1Request digital key ↗
09/03/2026M00518573-P1Request digital key ↗
09/03/2026M00518579-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00458869-P4Request digital key ↗
09/04/2026M00458869-P1Request digital key ↗
09/04/2026M00458869-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Foundation2
09/03/2026M00464078-P2Request digital key ↗
08/15/2026M00464078-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation2
09/03/2026M00464161-P1Request digital key ↗
09/03/2026M00464161-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00464054-I1Request digital key ↗
▸Applications & Permits49
▸BISPLAN / WORK APPROVAL APPLICATION25
07/09/2024123920631Open ↗
02/06/2024120155651Open ↗
02/06/2024120192941Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWLPC Approval/Permit13
09/04/2026M00458869-P2Open ↗
09/04/2026M00458869-P1Open ↗
09/03/2026M00518579-P1Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
04/05/2023123920631Open ↗
04/04/2023123920631Open ↗
03/30/2022123920631Open ↗
Showing 3 of 7 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/21/2022123920631Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/01/2017122861224Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/20/2023123920631Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/21/2022123920631Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)4
09/04/2026M00458869-P1Open ↗
09/04/2026M00458869-P2Open ↗
08/15/2026M00458869-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
09/04/2026M00458869-P1Open ↗
09/04/2026M00458869-P2Open ↗
08/15/2026M00458869-I1Open ↗
Showing 3 of 4 on file for this type
▸BISZONING DIAGRAM3
07/06/2021123920631Open ↗
03/29/2018122861224Open ↗
08/15/2016122861224Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/29/2021123920631Open ↗
▸BISVERIFY TAX LOT1
02/15/2024123920631Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/15/2024123920631Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/29/2021123920631Open ↗
▸Seals & Professional Certifications61
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/04/2026M00458869-P2Open ↗
09/04/2026M00458869-I1Open ↗
09/04/2026M00458869-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026M00518587-I1Open ↗
09/19/2026M00464078-I1Open ↗
09/19/2026M00464078-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026M00464078-I1Open ↗
09/19/2026M00464078-I1Open ↗
09/01/2026M00458869-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/12/2017140593891Open ↗
10/28/2016122861224Open ↗
10/28/2016122861224Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/14/2009120192941Open ↗
09/16/2009120155651Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/14/2009120192941Open ↗
09/16/2009120155651Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/24/2017140593891Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/24/2017140593891Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2017140593891Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE4
03/31/2010120192941Open ↗
02/02/2010120192941Open ↗
11/17/2009120155651Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
11/14/2009120192941Open ↗
09/16/2009120155651Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/15/2016122861224Open ↗
08/15/2016122861224Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/16/2009120155651Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
07/06/2021123920631Open ↗
01/29/2021123920631Open ↗
08/15/2016122861224Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
01/24/2017140593891Open ↗
▸BISSTREET TREE SIGNOFF1
12/09/2024123920631Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/03/2026M00518579-I1Open ↗
09/03/2026M00518587-I1Open ↗
08/15/2026M00464078-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/16/2009120155651Open ↗
09/16/2009120155651Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/14/2009120192941Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/15/2016122861224Open ↗
08/15/2016122861224Open ↗
▸BISNYCECC EXEMPTION1
03/05/2021123920631Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/29/2021123920631Open ↗
01/24/2017140593891Open ↗
▸DOB NOWSOIL REPORT2
09/03/2026M00464078-P2Open ↗
08/15/2026M00464078-I1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/28/2016122861224Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/29/2018122861224Open ↗
▸DOB NOWTR4 Plot Diagram1
08/15/2026M00464078-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026M00464078-I1Open ↗
▸Approvals, Objections & Sign-offs23
▸BISSCHEDULE A - OCCUPANCY / USE7
06/01/2023123920631Open ↗
05/24/2023123920631Open ↗
05/23/2023123920631Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL4
03/31/2021123920631Open ↗
01/24/2017140593891Open ↗
10/18/2016122861224Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/08/2024120192941Open ↗
02/08/2024120155651Open ↗
09/12/2017140593891Open ↗
▸BISFINAL3
10/30/2023120192941Open ↗
10/30/2023120192941Open ↗
10/30/2023120192941Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/14/2009120192941Open ↗
09/16/2009120155651Open ↗
▸BISLANDMARKS SIGNOFF2
06/14/2024123920631Open ↗
10/31/2023120192941Open ↗
▸BISBPP: FINAL SIGNOFF1
01/19/2024120192941Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/29/2018122861224Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT9
03/20/2024123920631Open ↗
02/08/2024120155651Open ↗
01/19/2024120192941Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/14/2024123920631Open ↗
02/08/2024120192941Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026M00458869-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00458869-I1Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET8
01/29/2021123920631Open ↗
01/21/2021123920631Open ↗
12/01/2017123203620Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
11/27/2023123920631Open ↗
06/12/2023123920631Open ↗
06/15/2022123920631Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
03/30/2023123920631Open ↗
03/30/2022123920631Open ↗
03/27/2019122861224Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/24/2017140593891Open ↗
▸Other Documents24
▸DOB NOWPlot Diagram8
09/04/2026M00458869-P1Open ↗
09/04/2026M00458869-P2Open ↗
09/03/2026M00464078-P2Open ↗
Showing 3 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
03/29/2018122861224Open ↗
03/29/2018122861224Open ↗
12/01/2017123203620Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
09/04/2026M00458869-P2Open ↗
09/04/2026M00458869-P1Open ↗
08/15/2026M00458869-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
09/04/2026M00458869-P2Open ↗
08/15/2026M00458869-I1Open ↗
08/13/2026M00458869-P4Open ↗
▸BISPLOT DIAGRAM2
01/29/2021123920631Open ↗
08/15/2016122861224Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/24/2024123920631Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00458869-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00464161-I1Open ↗