1220 DEAN STREET
BROOKLYN · BIN 3030364
💬 Discuss this project
1877Year Built
3Stories
C2Building Class
R6Zoning
3,000 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Five to six families · Owner of record: 1220 DEAN LLC · 1,907 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 17 docs
Floor 361p · 2 filings · 20 docs
Floor 259p · 2 filings · 20 docs
Floor 160p · 1 filing · 20 docs
Cellar70p · 4 filings · 20 docs
Basement59p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1220 DEAN3404/09/2026
JENJEN HOLDINGS, LLC.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/01/2024$1.3M—JENJEN HOLDINGS LLC → 1220 DEAN LLC$437/sf building
04/27/2022$765K—— → —$255/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUKE LICALZI, P.E., P.C.1103/12/2026
ASR ENGINEERING PC107/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDING MANAGEMENT INCGeneral Contractor303/21/2026
RECORD GROUP INCGeneral Contractor303/21/2026
IMPACT BUILDERS CORPGeneral Contractor204/09/2026
LG ELITE PLUMBING INCPlumbing207/08/2026
TRINCITY ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JON LIBASCI3068203/12/2026
WORLD DESIGN ARCHITECTURE9323801/06/2026
Building Lifecycle
All (137)Filed (12)Permit Issued (6)Signed Off (4)Violation (47)Inspection (10)Objection (28)Special Inspection (30)
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/19/2026
Signed off — Alteration
interior renovation, Alt type 1. Plumbing work type conversion of one (1) family on basement and 1st floor with two (2) B rooms on 02 and three (3) B rooms on 03 into a one (1) family unit at basement and one Family on floors 01,02 and 03. Layouts as per.
B01137091-I1
03/17/2026
Signed off — Alteration
installation of mechanical split systems HVAC units, exterior condenser units located at Basement (garden level) and at building roof. Interior wall cassettes at cellar and basement and slimline air handlers at first through third floor as per plan.
B01151788-I1
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
03/16/2026
Special inspection requirement — Final
NICHOLAS AGNETA
03/16/2026
Special inspection requirement — Mechanical Systems
jon libasci
03/16/2026
Special inspection requirement — Ventilation and air distribution system
jon libasci
03/12/2026
Filed — Alteration
installation of mechanical split systems HVAC units, exterior condenser units located at Basement (garden level) and at building roof. Interior wall cassettes at cellar and basement and slimline air handlers at first through third floor as per plan.
B01151788-P1
03/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2026
Special inspection requirement — Ventilation and air distribution system
jon libasci
03/11/2026
Special inspection requirement — Final
NICHOLAS AGNETA
03/11/2026
Special inspection requirement — Mechanical Systems
jon libasci
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
03/03/2026
Signed off — Alteration
Interior demolition of existing 3 story and basement building. Demolition of existing nonbearing partitions, ceilings and soffits, removal of misc. millwork fittings and finishes as per plans. no change in egress occupancy or use under this application.
B01157949-I1
03/02/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
01/21/2026
Objection resolved — Addressed
01/20/2026
Special inspection requirement — Air barrier - visual inspection
William Alicea
01/20/2026
Special inspection requirement — Fenestration air leakage
William Alicea
01/20/2026
Special inspection requirement — Lighting in dwelling units
William Alicea
01/20/2026
Special inspection requirement — Interior lighting power
William Alicea
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
01/20/2026
Special inspection requirement — Lighting controls
William Alicea
01/20/2026
Special inspection requirement — Fenestration areas
William Alicea
01/20/2026
Special inspection requirement — Exterior lighting power
William Alicea
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
01/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
01/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
01/16/2026
Objection resolved — Addressed
01/12/2026
Objection raised — Cost
01/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/07/2026
Objection raised — Other
01/06/2026
Filed — Alteration CO
interior renovation of existing 4 story and cellar building, demolition and construction of non-bearing partitions, lighting electrical and switching as per plan. Fixtures and finishes as per plan, Covert multiple dwelling into 2 family dwelling.
B01137063-P3
01/06/2026
Filed — Alteration
interior renovation, Alt type 1. Plumbing work type conversion of one (1) family on basement and 1st floor with two (2) B rooms on 02 and three (3) B rooms on 03 into a one (1) family unit at basement and one Family on floors 01,02 and 03. Layouts as per.
B01137091-P3
01/06/2026
Special inspection requirement — Fenestration air leakage
William Alicea
01/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
01/06/2026
Special inspection requirement — Lighting controls
William Alicea
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
01/06/2026
Special inspection requirement — Fenestration areas
William Alicea
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
12/17/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/01/2025
Filed — Alteration
interior renovation, Alt type 1. Plumbing work type conversion of one (1) family on basement and 1st floor with two (2) B rooms on 02 and three (3) B rooms on 03 into a one (1) family unit at basement and one Family on floors 01,02 and 03. Layouts as per.
B01137091-P2
08/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2025
Filed — Alteration CO
interior renovation of existing 4 story and cellar building, demolition and construction of non-bearing partitions, lighting electrical and switching as per plan. Fixtures and finishes as per plan, Covert multiple dwelling into 2 family dwelling.
B01137063-P2
08/19/2025
Signed off — Alteration
INSTALLATION OF 50 PSF MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01256497-I1
08/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/08/2025
Permit issued — Plumbing
B01137091-I1-PL
07/17/2025
Filed — Alteration
INSTALLATION OF 50 PSF MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01256497-I1
07/17/2025
Permit issued — Supported Scaffold
B01256497-I1-SF
06/26/2025
Permit issued — Mechanical Systems
B01151788-I1-MS
06/24/2025
Objection resolved — Addressed
06/09/2025
Violation issued (HPD, closed)
A
06/06/2025
Objection raised — Mechanical
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Cost
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC08/08/2025
DOB NOWSupported ScaffoldSigned-offH BUILDING MANAGEMENT INC07/17/2025
DOB NOWMechanical SystemsSigned-offIMPACT BUILDERS CORP06/26/2025
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP01/27/2025
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC01/16/2025
DOB NOWGeneral ConstructionSigned-offRECORD GROUP INC01/02/2025
BISOTISSUEDGRAND RENOVATION INC04/09/2002
2 projects · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026CompleteTRINCITY ELECTRIC, INCGeneral Wiring
03/05/2025CompleteTRINCITY ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
03/16/2026Ventilation and air distribution systemjon libascienergy_progress
03/16/2026Mechanical Systemsjon libascispecial
03/16/2026Fire-Resistant Penetrations and Jointsjon libascispecial
03/16/2026FinalNICHOLAS AGNETAprogress
03/11/2026Ventilation and air distribution systemjon libascienergy_progress
03/11/2026Fire-Resistant Penetrations and Jointsjon libascispecial
03/11/2026Mechanical Systemsjon libascispecial
03/11/2026FinalNICHOLAS AGNETAprogress
01/26/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
01/26/2026HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
01/26/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
01/26/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
01/26/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
01/20/2026Interior lighting powerWilliam Aliceaenergy_progress
01/20/2026Exterior lighting powerWilliam Aliceaenergy_progress
01/20/2026Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
01/20/2026Lighting in dwelling unitsWilliam Aliceaenergy_progress
01/20/2026Air barrier - visual inspectionWilliam Aliceaenergy_progress
01/20/2026Fenestration areasWilliam Aliceaenergy_progress
01/20/2026Fenestration air leakageWilliam Aliceaenergy_progress
01/20/2026Lighting controlsWilliam Aliceaenergy_progress
01/20/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
01/20/2026Fire-Resistance Rated ConstructionWilliam Aliceaprogress
01/20/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
01/06/2026Lighting in dwelling unitsWilliam Aliceaenergy_progress
Latest 25 of 61.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026B01256497-I1Request digital key ↗
08/20/2026B01137063-P1Request digital key ↗
08/20/2026B01137063-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/13/2026B01137063-P2Open ↗
08/13/2026B01137063-I1Open ↗
08/13/2026B01137091-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature18
09/27/2026B01137091-P1Open ↗
09/27/2026B01137091-P1Open ↗
09/01/2026B01137063-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026B01256497-I1Open ↗
08/20/2026B01137063-P1Open ↗
08/20/2026B01137063-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026B01137091-P1Open ↗
09/01/2026B01137063-I1Open ↗
09/01/2026B01151788-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection18
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist11
08/13/2026B01137063-P1Open ↗
08/13/2026B01137091-P1Open ↗
08/13/2026B01137091-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStreet Tree Checklist4
08/20/2026B01137063-P1Open ↗
08/20/2026B01137063-P3Open ↗
08/20/2026B01137063-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/15/2026B01137063-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B01137063-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01137063-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/20/2026B01137063-P1Open ↗
08/20/2026B01137063-P3Open ↗
08/20/2026B01137063-P2Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWLandmark Approval1
08/13/2026B01151788-P1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/20/2026B01137063-P2Open ↗
08/20/2026B01137063-P1Open ↗
08/20/2026B01137063-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/15/2026B01137063-I1Open ↗