Two family brick
1221 EAST 10TH STREET
BROOKLYN · BIN 3172035
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R5Zoning
3,479 sfGross Floor Area
2Units
4 Active Violations ▸FDNY Report ↗
Two family brick · 5,150 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofResidential building rooftop solar panel installationUnder Construction3p · 2 filings · 20 docs
AtticMechanical work for air supply ductUnder Construction39p · 3 filings · 20 docs
Floor 2Mechanical work for air supply ductUnder Construction40p · 4 filings · 20 docs
Floor 1Mechanical work for air supply ductUnder Construction41p · 4 filings · 20 docs
CellarMechanical work for air supply ductUnder Construction43p · 4 filings · 20 docs
Site & exteriorConstruction fence workUnder Construction50p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/26/2025$1.9M—18 PARKWAY COURT LLC → Private party$546/sf building
12/06/2023$1.3M—Private party → 18 PARKWAY COURT LLC$385/sf building
05/10/2022$1.2M—— → —$356/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect109/29/2026
Rahman Consulting507/06/2026
MSM Engineering Services504/28/2025
AL Ffred Architecture101/04/2024
J&R Design and Inspection210/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mister Expediter903/21/2026
XYZ Code Consulting103/21/2026
Highquality Construction VNW403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sakab DesignGeneral Contractor509/17/2026
Sakab DesignScaffold404/09/2026
Sega ElectricElectrical103/22/2026
Peeps ServicesGeneral Contractor107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854109/29/2026
MSM Engineering Services84491007/06/2026
Shahrish Shuvo Engineering8524106/13/2025
J&R Design and Inspection6637110/17/2023
Building Lifecycle
All (112)Filed (14)Permit Issued (9)Violation (5)Objection (54)Special Inspection (30)
09/29/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01431301-I1
09/16/2026
Permit issued — General Construction
B00814931-I1-GC
08/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MOHAMED MAHMOUD
08/18/2026
Special inspection requirement — Footing and Foundation
MOHAMED MAHMOUD
08/18/2026
Special inspection requirement — Final
Feng Zhang
08/18/2026
Special inspection requirement — Structural Steel - Welding
MOHAMED MAHMOUD
08/18/2026
Special inspection requirement — Structural Steel - Details
MOHAMED MAHMOUD
08/18/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
08/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Addressed
07/27/2026
Objection raised — Scope
07/27/2026
Objection raised — Scope
07/27/2026
Objection raised — Scope
07/27/2026
Objection raised — Admin
07/27/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
07/15/2026
Special inspection requirement — Final
TOM PETERSEN
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
07/06/2026
Filed — Alteration CO
Creating foundation design for 3 story building. Foundation work in conjunction to GC application B00814931-I1, No underpinning required under this application. No dewatering to be required for this application.
B00814931-P3
07/01/2026
Special inspection requirement — Footing and Foundation
MOHAMED MAHMOUD
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
07/01/2026
Special inspection requirement — Structural Steel - Details
MOHAMED MAHMOUD
07/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MOHAMED MAHMOUD
07/01/2026
Special inspection requirement — Structural Steel - Welding
MOHAMED MAHMOUD
07/01/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
07/01/2026
Special inspection requirement — Final
Feng Zhang
06/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2026
Permit issued — Plumbing
B00814931-S1-PL
05/21/2026
Objection resolved — Resolved
05/21/2026
Objection resolved — Resolved
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
02/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Scope
01/21/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Cost
01/14/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/24/2025
Objection resolved — Addressed
12/08/2025
Special inspection requirement — Final
Feng Zhang
12/08/2025
Special inspection requirement — Structural Cold-Formed Steel
MOHAMED MAHMOUD
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSakab Design09/16/2026
DOB NOWPlumbingPermit IssuedGregg NY Plumbing06/05/2026
DOB NOWFoundationPermit IssuedSakab Design11/03/2025
DOB NOWSupport of ExcavationPermit IssuedSakab Design10/27/2025
DOB NOWStructuralPermit IssuedSakab Design09/25/2025
DOB NOWGeneral ConstructionPermit IssuedSakab Design09/17/2025
DOB NOWConstruction FencePermit IssuedSakab Design06/26/2025
DOB NOWGeneral ConstructionPermit IssuedPeeps Services08/09/2024
DOB NOWConstruction FencePermit IssuedSakab Design06/24/2024
1 project · most recent 10/23/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/23/2023——Air Conditioning Systems
Cooling
Daikin DX13SA0484 48,000 BTU · Condensing Unit ×2
1 project · most recent 10/17/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/17/2023——Gas, Water/Sanitary
3 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedBerger Quality Electrical Con—
07/10/2026Permit IssuedCYM Electrical ContractorGeneral Wiring
04/03/2024Permit IssuedSega ElectricGeneral Wiring
2 projects · most recent 07/06/2026
Wood Steel
FiledStatusContractorScope
07/06/2026Permit IssuedSakab DesignSteel, Wood
06/07/2023——Wood
1 project · most recent 09/29/2026
FiledStatusContractorScope
09/29/2026——32 panels, 14.08 kw, 326.52 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/18/2026Structural Steel - High Strength BoltingMOHAMED MAHMOUDspecial
08/18/2026Footing and FoundationMOHAMED MAHMOUDprogress
08/18/2026FinalFeng Zhangprogress
08/18/2026Structural Steel - WeldingMOHAMED MAHMOUDspecial
08/18/2026Structural Steel - DetailsMOHAMED MAHMOUDspecial
08/18/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
08/18/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
08/18/2026Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
07/27/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
07/15/2026Energy Code Compliance InspectionsTOM PETERSENprogress
07/15/2026FinalTOM PETERSENprogress
07/15/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
07/01/2026Footing and FoundationMOHAMED MAHMOUDprogress
07/01/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/01/2026Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
07/01/2026Structural Steel - DetailsMOHAMED MAHMOUDspecial
07/01/2026Structural Steel - High Strength BoltingMOHAMED MAHMOUDspecial
07/01/2026Structural Steel - WeldingMOHAMED MAHMOUDspecial
07/01/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
07/01/2026FinalFeng Zhangprogress
12/08/2025FinalFeng Zhangprogress
12/08/2025Structural Cold-Formed SteelMOHAMED MAHMOUDspecial
12/08/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
12/08/2025Structural Steel - WeldingMOHAMED MAHMOUDspecial
12/08/2025Structural Steel - DetailsMOHAMED MAHMOUDspecial
Latest 25 of 59.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
10/04/2026B01431301-I1Request digital key ↗
08/26/2026B00881228-I1Request digital key ↗
08/26/2026B00913611-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026B00814931-I1Open ↗
08/15/2026B00814931-P1Open ↗
08/13/2026B00814931-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B00814931-P1Open ↗
08/13/2026B00814931-P1Open ↗
08/13/2026B00814931-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature15
10/05/2026B01431301-I1Open ↗
10/05/2026B01431301-I1Open ↗
10/05/2026B01431301-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/04/2026B01431301-I1Open ↗
08/26/2026B00913611-I1Open ↗
08/21/2026B00814931-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/05/2026B01431301-I1Open ↗
09/01/2026B00814931-S4Open ↗
09/01/2026B00814931-S4Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00814931-P1Open ↗
08/13/2026B00814931-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00814931-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
10/04/2026B01431301-I1Open ↗
08/26/2026B00913611-I1Open ↗
08/21/2026B00814931-P2Open ↗
Showing 3 of 13 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/14/2026B00814931-P3Open ↗
08/13/2026B00814931-S5Open ↗
08/13/2026B00814931-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00814931-S4Open ↗
08/13/2026B00814931-S5Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B00814931-S5Open ↗
08/13/2026B00814931-S4Open ↗
▸Other Documents14
▸DOB NOWPlot Diagram5
08/14/2026B00814931-P3Open ↗
08/13/2026B00814931-I1Open ↗
08/13/2026B00814931-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00869281-I1Open ↗
08/13/2026B00814931-P1Open ↗
08/13/2026B00814931-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00814931-P1Open ↗
08/13/2026B00814931-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00869281-I1Open ↗
08/13/2026B00814931-S5Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026B00814931-I1Open ↗
08/15/2026B00814931-P1Open ↗