Convent
Mesa Lh Condominium
1222 63RD STREET · BIN 3345689
💬 Discuss this project
1902Year Built
4Stories
M4Building Class
R5BZoning
22,000 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Convent · Owner of record: 1222 REALTY GROUP LLC · 22,732 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof8p · 2 filings · 20 docs
Bulkhead1p · 1 filing
Floor 995p · 2 filings · 20 docs
Floor 8110p · 4 filings · 20 docs
Floor 7107p · 4 filings · 20 docs
Floor 6110p · 4 filings · 20 docs
Floor 5103p · 4 filings · 20 docs
Floor 4105p · 4 filings · 20 docs
Floor 3103p · 3 filings · 20 docs
Floor 2105p · 4 filings · 20 docs
Floor 1105p · 5 filings · 20 docs
Cellar112p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP607/08/2026
EMPRISE CONSTRUCTION703/22/2026
1222 REALTY GROUP LLC103/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
6301 12TH AVENUE 1403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2021$8.1M—JJSS DH LLC → 1222 REALTY GROUP LLC$368/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS5003/21/2026
Bealin Groups Corp803/21/2026
AE DESIGN SOLUTION603/21/2026
MEIYUN CHEN103/21/2026
HM LOKE CONSULTING ENGINEERING PC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPRISE CONSTRUCTION INCGeneral Contractor2007/08/2026
ADVANCED PLBG, MECH & SPRFire Protection507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor207/08/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAND INSPECTION & CONSUL67921906/15/2026
NIC 88 CORP8371906/15/2026
NIC DESIGN INC9758107/01/2025
PCMARCHITECTS PLLC2812405/13/2025
ANDREW GOODRICH, P.E., PL965305/05/2025
WELLDONE INSPECTION INC.8628206/06/2024
Building Lifecycle
All (195)Filed (38)Permit Issued (28)Signed Off (11)Violation (9)Inspection (22)Objection (57)Special Inspection (30)
09/17/2026
Signed off — Alteration CO
SUBSEQUENT FILING FOR MECHCHANICAL WORK IN CONJUCTION WITH APPLICATION#B00656215-I1.
B00656215-S3
07/10/2026
Objection raised — Other
07/10/2026
Objection raised — Other
06/15/2026
Filed — Alteration CO
SUBSEQUENT FILING FOR MECHCHANICAL WORK IN CONJUCTION WITH APPLICATION#B00656215-I1.
B00656215-P5
06/05/2026
Special inspection requirement — Concrete - Cast-In-Place
RUWAN RAJAPAKSE
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RUWAN RAJAPAKSE
06/05/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Eric Sun
06/05/2026
Special inspection requirement — Interior lighting power
Sugnam Chang
06/05/2026
Special inspection requirement — Insulation placement and R values
Sugnam Chang
06/05/2026
Special inspection requirement — Subgrade Inspections
RUWAN RAJAPAKSE
06/05/2026
Special inspection requirement — Metering
Sugnam Chang
06/05/2026
Special inspection requirement — Fenestration areas
Sugnam Chang
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Sugnam Chang
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Sugnam Chang
06/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Sugnam Chang
06/05/2026
Special inspection requirement — Fenestration air leakage
Sugnam Chang
06/05/2026
Special inspection requirement — Concrete - Precast
RUWAN RAJAPAKSE
06/05/2026
Special inspection requirement — Air barrier — testing
Sugnam Chang
06/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RUWAN RAJAPAKSE
06/05/2026
Special inspection requirement — Lighting controls
Sugnam Chang
06/05/2026
Special inspection requirement — Protection of exposed foundation insulation
Sugnam Chang
06/05/2026
Special inspection requirement — Air barrier - visual inspection
Sugnam Chang
06/05/2026
Special inspection requirement — Masonry
Eric Sun
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
02/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/26/2026
Permit issued — Structural
B00656215-S3-ST
11/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2025
Filed — Alteration CO
SUBSEQUENT FILING FOR MECHCHANICAL WORK IN CONJUCTION WITH APPLICATION#B00656215-I1.
B00656215-S3
10/08/2025
Special inspection requirement — Structural Steel - High Strength Bolting
BARNABY BURY
10/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BARNABY BURY
10/08/2025
Special inspection requirement — Structural Cold-Formed Steel
BARNABY BURY
10/08/2025
Special inspection requirement — Post-installed Anchors
BARNABY BURY
10/08/2025
Special inspection requirement — Masonry
BARNABY BURY
10/08/2025
Special inspection requirement — Structural Steel - Details
BARNABY BURY
10/08/2025
Special inspection requirement — Structural Steel - Welding
BARNABY BURY
10/08/2025
Special inspection requirement — Final
BARNABY BURY
09/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/15/2025
Special inspection requirement — Sprinkler Systems
Eric Sun
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
07/11/2025
Filed — Alteration
Subsequent Filing for exterior plumbing work.
B00788693-P9
07/10/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
B00788693-I1-PL
07/08/2025
Permit issued — Plumbing
B00788693-I1-EW-SP
07/07/2025
Signed off — Alteration
Install temporary standpipe system as per plans filed. Filed in conjunction with #B00656215-I1.
B08023084-I1
07/07/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
07/07/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/03/2025
Signed off — Alteration
B00684766-I1
07/02/2025
Permit issued — Standpipe
B00788693-S2-EW-SD
07/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/01/2025
Filed — Alteration
Subsequent Filing for exterior plumbing work.
B00788693-P6
07/01/2025
Filed — Alteration
Subsequent Filing for exterior plumbing work.
B00788693-S2
06/30/2025
Signed off — Alteration
Structural and foundation related to Alt CO B00656215-I1
B00722089-I1
06/25/2025
Signed off — Alteration
Subsequent Filing for exterior plumbing work.
B00788693-S1
06/25/2025
Signed off — Alteration CO
SUBSEQUENT FILING FOR MECHCHANICAL WORK IN CONJUCTION WITH APPLICATION#B00656215-I1.
B00656215-S2
06/20/2025
Filed — Alteration CO
SUBSEQUENT FILING FOR MECHCHANICAL WORK IN CONJUCTION WITH APPLICATION#B00656215-I1.
B00656215-P4
06/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2025
Permit issued — General Construction
B00656215-I1-GC
06/02/2025
Signed off — Alteration
NEW 20'-0" CURB CUT AT PARKING ENTRANCE.
B01187773-I1
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedEMPRISE CONSTRUCTION INC02/26/2026
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH07/08/2025
DOB NOWPlumbingSigned-offADVANCED PLBG, MECH & SPR07/08/2025
DOB NOWStandpipePermit IssuedADVANCED PLBG, MECH & SPR07/02/2025
DOB NOWGeneral ConstructionPermit IssuedEMPRISE CONSTRUCTION INC06/03/2025
DOB NOWMechanical SystemsSigned-offEMPRISE CONSTRUCTION INC05/05/2025
DOB NOWCurb CutSigned-offEMPRISE CONSTRUCTION INC04/24/2025
DOB NOWCurb CutSigned-offEMPRISE CONSTRUCTION INC04/24/2025
DOB NOWStandpipeSigned-offADVANCED PLBG, MECH & SPR11/26/2024
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC10/22/2024
DOB NOWConstruction FenceSigned-offEMPRISE CONSTRUCTION INC10/08/2024
DOB NOWGeneral ConstructionSigned-offEMPRISE CONSTRUCTION INC06/11/2024
DOB NOWGeneral ConstructionPermit IssuedEMPRISE CONSTRUCTION INC05/24/2024
DOB NOWPlumbingSigned-offADVANCED PLBG, MECH & SPR01/18/2024
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH01/17/2024
DOB NOWSupported ScaffoldSigned-offEMPRISE CONSTRUCTION INC12/19/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/11/2023
DOB NOWStandpipeSigned-offADVANCED PLBG, MECH & SPR11/30/2023
DOB NOWConstruction FenceSigned-offEMPRISE CONSTRUCTION INC09/29/2023
DOB NOWStructuralSigned-offEMPRISE CONSTRUCTION INC06/14/2023
DOB NOWSupport of ExcavationSigned-offEMPRISE CONSTRUCTION INC03/30/2023
DOB NOWGeneral ConstructionPermit IssuedEMPRISE CONSTRUCTION INC03/30/2023
DOB NOWGeneral ConstructionPermit IssuedEMPRISE CONSTRUCTION INC03/29/2023
DOB NOWSupport of ExcavationSigned-offEMPRISE CONSTRUCTION INC03/29/2023
DOB NOWGeneral ConstructionPermit IssuedEMPRISE CONSTRUCTION INC01/09/2023
DOB NOWSupport of ExcavationSigned-offEMPRISE CONSTRUCTION INC01/09/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/13/2022
DOB NOWConstruction FenceSigned-offEMPRISE CONSTRUCTION INC10/20/2022
2 projects · most recent 06/15/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026Permit IssuedEMPRISE CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Gree GMV-Q144WM/C-F(U) 144,000 BTU · Vrf Outdoor ×24
GMV-36WL/A-T(U) 37,500 BTU · Vrf Outdoor ×10
GMV-120WM/B-F(U) 120,000 BTU · Vrf Outdoor ×6
GMV-72WM/B-F(U) 72,000 BTU · Vrf Outdoor ×6
GMV-96WM/B-F(U) 96,000 BTU · Vrf Outdoor ×4
__Junk__ LBH18DTO 18,000 BTU ×2
Heating
Greenheck CWH1151DS 2,180 CFM · Unit Heater ×4
Ventilation
__Junk__ DUCTWORK 500 CFM · Ductwork ×24
———Air Conditioning Systems
Cooling
York ZF240N32B2AAA3A 246,000 BTU · Rooftop Unit ×1
1 project · most recent 07/11/2025
FiledStatusContractorScope
07/11/2025Signed-offADVANCED PLBG, MECH & SPR3,709 heads, 1 outlets
1 project · most recent 07/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
07/11/2025Permit IssuedADVANCED PLUMBING MECHStorm, Water/Sanitary
4 projects · most recent 09/03/2026
General Wiring
FiledStatusContractorScope
09/03/2026CompleteINTELOGIC ELECTRIC, INC.General Wiring
07/21/2025CompleteW 8 ELECTRIC CORPGeneral Wiring
05/23/2024CancelledW 8 ELECTRIC CORPGeneral Wiring
12/06/2022CompleteSOLAS ELECTRICAL CORP—
2 projects · most recent 06/15/2026
Steel
FiledStatusContractorScope
06/15/2026Permit IssuedEMPRISE CONSTRUCTION INCSteel
04/15/2022——2 scope_items
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
02/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/10/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/07/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
07/07/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/07/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/20/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/30/2024Pass-Final House ConnectionPassView ↗
10/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Pass-Final PL - UndergroundPassView ↗
07/18/2024Fail-Final PL - UndergroundFailView ↗
06/04/2024Pass-Final SD - Up to 3 Requested FloorsPassView ↗
05/09/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/05/2026Energy Code Compliance InspectionsSugnam Changprogress
06/05/2026Subgrade InspectionsRUWAN RAJAPAKSEspecial
06/05/2026Structural Stability – Alterations of existing buildingsRUWAN RAJAPAKSEspecial
06/05/2026MasonryEric Sunspecial
06/05/2026Fire-Resistant Penetrations and JointsEric Sunspecial
06/05/2026Fire-Resistance Rated ConstructionSugnam Changprogress
06/05/2026Excavations - Sheeting, Shoring, and BracingRUWAN RAJAPAKSEspecial
06/05/2026Concrete - PrecastRUWAN RAJAPAKSEspecial
06/05/2026Concrete - Cast-In-PlaceRUWAN RAJAPAKSEspecial
06/05/2026Alternative Materials - OTCR Buildings Bulletin NumberEric Sunspecial
06/05/2026Lighting controlsSugnam Changenergy_progress
06/05/2026Air barrier — testing Sugnam Changenergy_progress
06/05/2026Insulation placement and R valuesSugnam Changenergy_progress
06/05/2026Fenestration and door U-factor and product ratingsSugnam Changenergy_progress
06/05/2026Interior lighting powerSugnam Changenergy_progress
06/05/2026Fenestration air leakageSugnam Changenergy_progress
06/05/2026Protection of exposed foundation insulationSugnam Changenergy_progress
06/05/2026Air barrier - visual inspectionSugnam Changenergy_progress
06/05/2026Fenestration areasSugnam Changenergy_progress
06/05/2026MeteringSugnam Changenergy_progress
10/08/2025Structural Steel - DetailsBARNABY BURYspecial
10/08/2025Structural Stability – Alterations of existing buildingsBARNABY BURYspecial
10/08/2025Structural Steel - High Strength BoltingBARNABY BURYspecial
10/08/2025Structural Steel - WeldingBARNABY BURYspecial
10/08/2025FinalBARNABY BURYprogress
Latest 25 of 150.
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch34
09/03/2026B00788662-I1Request digital key ↗
08/31/2026B00684766-I1Request digital key ↗
08/29/2026B00722092-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/21/2026B01211484-I1Request digital key ↗
08/21/2026B01211466-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00164906-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION10
02/25/2026322123368Open ↗
02/25/2026322123368Open ↗
01/29/2026322123368Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/14/2025340912560Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00656215-P3Open ↗
08/13/2026B00656215-P2Open ↗
08/13/2026B00656215-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/25/2026322123368Open ↗
08/04/2025322047012Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/25/2026322123368Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00656215-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWSpecial Inspector Seal & Signature41
09/25/2026B00656215-P1Open ↗
09/25/2026B00656215-P1Open ↗
09/25/2026B00656215-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/03/2026B00788662-I1Open ↗
09/02/2026B00164906-I1Open ↗
08/31/2026B00684766-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/25/2026B00656215-P1Open ↗
09/25/2026B00656215-P1Open ↗
09/25/2026B00656215-P1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/05/2019321970097Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/23/2024340912560Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/05/2019321970097Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/23/2024340912560Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/05/2019321970097Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA1
07/05/2019321970097Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/05/2019321970097Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026B00656215-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/20/2026B00656215-I1Open ↗
08/15/2026B00656215-P1Open ↗
08/15/2026B00656215-P3Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
04/11/2025340912560Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00656215-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026B00788693-P3Open ↗
08/21/2026B00788693-P4Open ↗
08/21/2026B00788693-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/29/2026B00722089-I1Open ↗
08/20/2026B00656215-S3Open ↗
08/20/2026B00656215-S2Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/29/2026B00722089-P2Open ↗
08/29/2026B00722089-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/29/2026B00722089-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/26/2026322123368Open ↗
02/25/2026322123368Open ↗
02/25/2026322123368Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
05/29/2019321906504Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/05/2019321970097Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
01/29/2026322123368Open ↗
07/09/2025322047012Open ↗
06/25/2019321970097Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/23/2024340912560Open ↗
▸BISADDITIONAL INFORMATION1
04/14/2025340912560Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial4
08/13/2026B00656215-P3Open ↗
08/13/2026B00656215-P2Open ↗
08/13/2026B00656215-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00656215-P2Open ↗
08/13/2026B00656215-P1Open ↗
08/13/2026B00656215-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00656215-P1Open ↗
08/13/2026B00656215-P2Open ↗
08/13/2026B00656215-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026B00656215-I1Open ↗
08/15/2026B00656215-P1Open ↗
08/15/2026B00656215-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
02/04/2025340912560Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/11/2025340912560Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/25/2026322123368Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00656215-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00722092-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00656215-I1Open ↗