6 Open Violations 4 unresolved · 2 paperwork only▸
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB01/03/2008V-DOB VIOLATION - ACTIVE
ECB09/05/2007B4B,38,36,BQ9,50A,B,C,D.50A-BOILER ENCLOSURE NOT COMPLETED.50B-NO BOILER ROOM FIRE DOOR.50C-PIPE SAFETY OR RELIEF VALVE DISCHARGE DOWN NO THREADED END.50D-HOLES IN BOILER ROOM CEILING.BQ9-NO WORK PERMIT FILEDNothing owed — awaiting certificate of correction
ECB11/24/1995FAILURE TO PROVIDE AT LEAST TWO MEANS OF EGRESS WHERE REQUIRED. FIRST FLOOR DOES NOT HAVE A SECOND MEANS OF EGRESS. REMEDY: PROVIDE REQUIRED MEANS OF EGRESS.Nothing owed — awaiting certificate of correction
Predominantly retail with other uses · Owner of record: HARVAL EQUITY CORP · 1,000 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.