← Back
Over six families without stores
1223 BUSHWICK AVENUE
BROOKLYN · BIN 3078193
💬 Discuss this project
1915Year Built
4Stories
C1Building Class
R6Zoning
17,800 sfGross Floor Area
24Units
Rent Stabilized33 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1223 BUSHWICK LLC · 5,000 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Roof2p · 1 filing · 8 docs
Floor 49p · 2 filings · 20 docs
Floor 31p · 1 filing · 19 docs
Floor 2
Floor 16p · 1 filing · 16 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NUMI ACQUISITIONS1207/08/2026
1223 BUSHWICK2703/22/2026
CAVALRY ASSOCIATES103/22/2026
1248 DEKALB LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING203/21/2026
CAVALRY MANAGEMENT1003/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
CAVALRY LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing407/08/2026
BENJAMIN DREBINElectrical403/21/2026
CEL TECH ELECTRIC INCGeneral Contractor303/21/2026
CAVALRY LLCGeneral Contractor207/08/2026
E.T. VANDERBECK INCGeneral Contractor107/08/2026
J.A. LEE ELECTRIC INCGeneral Contractor107/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB DESIGN GROUP, LLC513303/31/2025
M. INT'L ENGINEERING PLLC3129407/27/2023
FULLERTON ENGINEERING PC8636111/04/2021
Building Lifecycle
All (137)Filed (10)Permit Issued (7)Signed Off (5)Violation (60)Inspection (3)Objection (22)Special Inspection (30)
07/27/2026
Violation issued (ECB, open)
Construction
05/28/2026
Violation issued (HPD, closed)
C
05/01/2026
Violation issued (HPD, closed)
A
04/17/2026
Signed off — Alteration
Modification to existing VERIZON site on the roof. Installation of (1) new platform with related cabinets and (1) antenna. Replacement of (6) antennas and (6) RRH units. Removal of (1) cabinet. Relocation of (2) GPS antennas and (3) antennas.
B01197369-I1
04/13/2026
Violation issued (HPD, closed)
B
04/13/2026
Violation issued (HPD, closed)
B
03/17/2026
Violation issued (HPD, closed)
C
03/17/2026
Violation issued (HPD, closed)
B
02/12/2026
Violation issued (HPD, closed)
C
12/20/2025
Violation issued (HPD, closed)
C
12/07/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
C
12/04/2025
Violation issued (HPD, closed)
C
12/04/2025
Violation issued (HPD, open)
C
11/19/2025
Violation issued (HPD, closed)
I
05/12/2025
Violation issued (HPD, closed)
C
04/28/2025
Permit issued — Antenna
B01197369-I1-AN
04/07/2025
Objection resolved — Addressed
04/03/2025
Objection raised — Cost
03/31/2025
Filed — Alteration
Modification to existing VERIZON site on the roof. Installation of (1) new platform with related cabinets and (1) antenna. Replacement of (6) antennas and (6) RRH units. Removal of (1) cabinet. Relocation of (2) GPS antennas and (3) antennas.
B01197369-I1
08/23/2024
Violation issued (HPD, closed)
B
08/23/2024
Violation issued (HPD, closed)
B
08/23/2024
Violation issued (HPD, closed)
A
06/28/2024
Violation issued (HPD, open)
C
06/28/2024
Violation issued (HPD, open)
B
06/28/2024
Violation issued (HPD, closed)
C
06/28/2024
Violation issued (HPD, closed)
B
05/01/2024
Violation issued (HPD, open)
C
04/22/2024
Violation issued (HPD, closed)
C
04/09/2024
Violation issued (HPD, closed)
C
03/26/2024
Violation issued (HPD, open)
C
03/26/2024
Violation issued (HPD, closed)
C
03/12/2024
Violation issued (ECB, open)
Construction
02/29/2024
Violation issued (ECB, closed)
Construction
02/26/2024
Violation issued (HPD, closed)
C
02/26/2024
Violation issued (HPD, closed)
C
12/23/2023
Violation issued (HPD, closed)
C
12/23/2023
Violation issued (HPD, closed)
C
12/23/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/21/2023
Violation issued (HPD, closed)
C
08/17/2023
Signed off — Alteration
Carrier:Dish Wireless. New Antenna Installation. Install (2) exterior cabinet on the new platform on building wall. Install (3) new antennas,(3) new OVP devices, and (6) new RRH units on new antenna frame. In conformance w/ TPPN #5/98. No change in use, e
B00616779-I1
08/17/2023
Signed off — Alteration
INTERIOR RENO OF RES UNITS ON 004, AND DUPLEXING OF 001 UNITS TO ACCESSORY SPACE IN CEL. ADDRESSING VIOLATIONS 35002143Y, 34854501Z, 39071356M, 39071355K, 39071354Z, 39071353R, 39071352P, 35071871L, 35482104R, 35482119J. ALSO ADDRESSING VACATE 3876721
B00789672-I1
08/09/2023
Signed off — Alteration
MECHANICAL FILING IN CONJUNCTION WITH ALT 2 APPLICATION B00789672. WORKT TO ADDRESS FIRE DAMAGES IN CELLAR AND APT 6A AND PROPOSE INTERIOR RNOVATION TO 4APT IN 4TH FLOOR
B00815341-I1
08/04/2023
Signed off — Alteration
PLUMBING FILING IN CONJUNCTION WITH ALT II APPLICATION B00789672. WORK TO ADDRESS VIOLATONS #35002143Y AND 34854501Z, ADDRESS FIRE DAMAGES IN CELLAR AND APT 6D AND PROPOSE INTERIOR RENOVATION TO 4 APTS IN 4TH FLOOR
B00815025-I1
08/03/2023
Violation issued (ECB, closed)
Boilers
08/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
NANIK MASSAND
07/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
07/31/2023
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
07/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
07/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
07/31/2023
Special inspection requirement — Maintenance information
NANIK MASSAND
07/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
07/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP04/28/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/12/2023
DOB NOWMechanical SystemsSigned-offCAVALRY LLC04/11/2023
DOB NOWAntennaPermit IssuedMIC GEN'L CONTRACTING INC01/30/2023
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC11/02/2022
DOB NOWAntennaSigned-offE.T. VANDERBECK INC10/31/2022
DOB NOWAntennaPermit IssuedCEL TECH ELECTRIC INC08/15/2019
BISOTISSUEDCEL TECH ELECTRIC INC08/04/2014
BISBLISSUEDAPPROVED OIL OF BKLYN,INC01/24/2006
BISPLISSUEDH BRONNER & SON PLBG & HTG01/04/2006
BISOTISSUEDTECH-NEL ELECTRIC, INC09/28/2001
5 projects · most recent 11/03/2025
General Wiring
FiledStatusContractorScope
11/03/2025CompleteACCURATE ELEC'L CORP.General Wiring
08/22/2023CompleteACCURATE ELEC'L CORP.General Wiring
02/02/2023CompleteACCURATE ELEC'L CORP.General Wiring
10/11/2022Permit IssuedASSOCIATED ELEC CONT OF NGeneral Wiring
11/24/2019Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
07/31/2023Tenant Protection Plan ComplianceNANIK MASSANDspecial
07/31/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/31/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
07/31/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
07/31/2023HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
07/31/2023Maintenance informationNANIK MASSANDenergy_progress
07/31/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
07/28/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
07/28/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
07/28/2023FinalNANIK MASSANDprogress
07/28/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
07/28/2023Interior lighting powerNANIK MASSANDenergy_progress
07/28/2023Lighting controlsNANIK MASSANDenergy_progress
07/25/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
07/25/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
07/25/2023FinalNANIK MASSANDprogress
07/25/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
07/25/2023Lighting controlsNANIK MASSANDenergy_progress
07/25/2023Interior lighting powerNANIK MASSANDenergy_progress
07/25/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
07/25/2023Tenant Protection Plan Compliance—special
07/25/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
07/25/2023Maintenance informationNANIK MASSANDenergy_progress
07/25/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
07/25/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
Latest 25 of 31.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
08/27/2026B00815025-P1Request digital key ↗
08/27/2026B00815025-I1Request digital key ↗
08/27/2026B00789672-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Antenna2
08/15/2026B00132690-I1Request digital key ↗
08/14/2026B00132690-P1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/15/2015321211951Open ↗
06/18/2014320964088Open ↗
▸BISWORK PERMIT APPLICATION1
08/06/2014320964088Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature16
08/28/2026B00815025-I1Open ↗
08/28/2026B00815025-I1Open ↗
08/28/2026B00815025-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00616779-I1Open ↗
08/28/2026B00132690-P1Open ↗
08/28/2026B00132690-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B00815025-I1Open ↗
08/28/2026B00815025-I1Open ↗
08/24/2026B00815341-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/15/2015321211951Open ↗
06/18/2014320964088Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2015321211951Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/15/2015321211951Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/15/2015321211951Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B00815025-I1Open ↗
08/27/2026B00789672-I1Open ↗
08/27/2026B00789672-P4Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2015321211951Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/15/2015321211951Open ↗
06/18/2014320964088Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00616779-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
10/15/2015321211951Open ↗
06/18/2014320964088Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/15/2015321211951Open ↗
06/18/2014320964088Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/15/2015321211951Open ↗
06/18/2014320964088Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026B00132690-P1Open ↗