HPD05/09/2008SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/09/2008SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/09/2008SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/09/2008SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE BASIN/SINK IN THE BATHROOM LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/09/2008SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE LOWER SASH AT THE EAST WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/09/2008SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE LOWER AND UPPER SASHES AT THE WEST WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/09/2008SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DIVICE AT ENTRANCE DOOR TO VESTIBULE PUBLIC HALL , 1st STORY
HPD05/09/2008SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIK TILE EAST WALL IN THE BATHROOM LOCATED AT APT 4, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
ECB04/03/2026Failure to maintain building in code compliant . Noted : at time of inspection,observed at exposure 1AND 4THE canvas on the awning is torn at several areas ,and if not properly secured can injure a pedestrian wNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB02/19/2019Construction: other (DOB violation)Issued 2019; DOB's record still lists it as active