← Back
Primarily 4 family with 1 store or office
1223 COLGATE AVENUE
BRONX · BIN 2025033
💬 Discuss this project
1935Year Built
2Stories
S4Building Class
R6Zoning
2,860 sfGross Floor Area
5Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · 8,088 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2023$1.1M—— → —$385/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR ARCHITECT P.C410/21/2025
DENNIS V. PANETTIERI, ARCHITECT104/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAC CONSTRUCTION803/21/2026
ALBA CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor104/09/2026
YAFE MEOD CORPGeneral Contractor104/09/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.1171410/21/2025
NORMAN C. LOK818103/04/2024
Building Lifecycle
All (59)Filed (5)Permit Issued (3)Signed Off (3)Violation (28)Inspection (6)Special Inspection (14)
04/30/2026
Violation issued (HPD, open)
A
03/04/2026
Signed off — Alteration
DOB NOW BUILD APPLICATION FILED FOR PROPOSED ENLARGING EXISTING CURB CUT ON BRONX RIVER AVENUE AT THE SUBJECT PREMISES. NO CHANGE IN USE OR OCCUPANCY.
X01215483-I1
03/02/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/03/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/02/2025
Signed off — Alteration
Install new (2) fixtures in the cellar floor (1 lavatory, 1 toilet) and Replacement of existing 3pc bathroom, 1 kitchen sink on the first floor.
X00986973-S1
12/01/2025
Signed off — Alteration
Install new (2) fixtures in the cellar floor (1 lavatory, 1 toilet) and Replacement of existing 3pc bathroom, 1 kitchen sink on the first floor.
X00986973-I1
11/18/2025
Violation issued (HPD, open)
I
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
10/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANGEL ROJAS
10/21/2025
Filed — Alteration
Install new (2) fixtures in the cellar floor (1 lavatory, 1 toilet) and Replacement of existing 3pc bathroom, 1 kitchen sink on the first floor.
X00986973-P2
10/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
10/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
X00986973-S1-PL
06/04/2025
Violation issued (HPD, open)
A
05/06/2025
Permit issued — Curb Cut
X01215483-I1-CC
04/29/2025
Permit issued — General Construction
X00986973-I1-GC-CX
04/24/2025
Filed — Alteration
DOB NOW BUILD APPLICATION FILED FOR PROPOSED ENLARGING EXISTING CURB CUT ON BRONX RIVER AVENUE AT THE SUBJECT PREMISES. NO CHANGE IN USE OR OCCUPANCY.
X01215483-I1
04/15/2025
Special inspection requirement — Wood – Seismic Resistance
ANGEL ROJAS
04/15/2025
Special inspection requirement — Structural Steel - Details
NORMAN LOK
04/15/2025
Special inspection requirement — Final
ANGEL ROJAS
04/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
04/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANGEL ROJAS
04/05/2025
Filed — Alteration
Install new (2) fixtures in the cellar floor (1 lavatory, 1 toilet) and Replacement of existing 3pc bathroom, 1 kitchen sink on the first floor.
X00986973-P1
04/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/02/2025
Special inspection requirement — Wood – Seismic Resistance
04/02/2025
Special inspection requirement — Final
04/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/02/2025
Special inspection requirement — Structural Steel - Details
11/25/2024
Violation issued (HPD, open)
I
04/02/2024
Violation issued (HPD, open)
A
03/04/2024
Filed — Alteration
Install new (2) fixtures in the cellar floor (1 lavatory, 1 toilet) and Replacement of existing 3pc bathroom, 1 kitchen sink on the first floor.
X00986973-S1
03/04/2024
Filed — Alteration
Install new (2) fixtures in the cellar floor (1 lavatory, 1 toilet) and Replacement of existing 3pc bathroom, 1 kitchen sink on the first floor.
X00986973-I1
12/11/2023
Violation issued (ECB, closed)
Construction
12/11/2023
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
12/11/2023
Violation issued (ECB, closed)
Construction
11/16/2023
Violation issued (HPD, open)
I
03/16/2023
Violation issued (HPD, open)
A
11/04/2022
Violation issued (HPD, open)
I
02/17/2022
Violation issued (HPD, open)
A
02/17/2022
Violation issued (HPD, open)
I
04/02/2021
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
I
10/10/2018
Violation issued (HPD, closed)
I
10/27/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
09/04/2014
Violation issued (HPD, closed)
A
09/04/2014
Violation issued (HPD, closed)
B
09/04/2014
Violation issued (HPD, closed)
B
03/17/2000
Violation issued (HPD, open)
B
09/20/1977
Violation issued (HPD, open)
A
09/20/1977
Violation issued (HPD, open)
B
09/20/1977
Violation issued (HPD, open)
B
09/20/1977
Violation issued (HPD, open)
B
09/13/1977
Violation issued (HPD, open)
A
09/13/1977
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP07/08/2025
DOB NOWCurb CutSigned-offMAMC CONSULTING REPS LLC05/06/2025
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP04/29/2025
1 project · most recent 05/05/2025
General Wiring
FiledStatusContractorScope
05/05/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/02/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/03/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/27/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/27/2025Tenant Protection Plan ComplianceANGEL ROJASspecial
10/16/2025Tenant Protection Plan Compliance—special
10/16/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
04/15/2025Wood – Seismic ResistanceANGEL ROJASspecial
04/15/2025Structural Steel - DetailsNORMAN LOKspecial
04/15/2025FinalANGEL ROJASprogress
04/15/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
04/15/2025Tenant Protection Plan ComplianceANGEL ROJASspecial
04/02/2025Tenant Protection Plan Compliance—special
04/02/2025Wood – Seismic Resistance—special
04/02/2025Final—progress
04/02/2025Structural Stability – Alterations of existing buildings—special
04/02/2025Structural Steel - Details—special
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X00986973-I1Request digital key ↗
08/21/2026X00986973-P2Request digital key ↗
08/21/2026X00986973-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00986973-P2Open ↗
08/29/2026X00986973-S1Open ↗
08/29/2026X00986973-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026X01215483-I1Open ↗
08/13/2026X00986973-I1Open ↗
08/13/2026X00986973-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026X00986973-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026X00986973-P2Open ↗
08/13/2026X00986973-I1Open ↗
08/13/2026X00986973-P1Open ↗
Showing 3 of 4 on file for this type