← Back
Multi-story retail building (2+)
1223 SURF AVENUE
BROOKLYN · BIN 3196563
💬 Discuss this project
2013Year Built
2Stories
K2Building Class
C7Zoning
14,717 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: FOX 18 REALTY, LLC · 10,386 sf lot · 1.42 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof17p · 4 filings · 20 docs
Floor 411p · 1 filing · 20 docs
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 222p · 4 filings · 20 docs
Floor 1Under Construction41p · 8 filings · 20 docs
Cellar2p · 1 filing · 20 docs
3 jobs · most recent 07/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2026Permit IssuedBIG APPLE SEWER & DRAIN IGas, Water/Sanitary
07/06/2026Permit IssuedTRI CITY MECHANICAL GROUPGas, Water/Sanitary
05/01/2025Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
17 jobs · most recent 09/11/2026
General Wiring Lighting
FiledStatusContractorScope
09/11/2026Permit IssuedA.L. ELECTRICAL CORP.General Wiring
03/31/2026CompleteJONG HYUN KIM—
07/23/2025CompleteHESO ELECTRICAL INCGeneral Wiring
07/15/2025CompleteSIGNS CAD CORP—
07/15/2025CompleteSIGNS CAD CORP—
04/16/2025CompleteKJK ELECTRIC INC5 meters, 1 new_meters
04/09/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
04/28/2023Permit IssuedLENLITE ELEC'L CONTR'S INGeneral Wiring
04/18/2023Permit IssuedREDGRAVE ELECTL MAINTNCE2 meters, 1 new_meters
07/14/2021CompleteJONG HYUN KIM—
03/25/2021CompleteKJK ELECTRIC INCGeneral Wiring
08/21/2018CompleteATMOS ELECTRIC SVCE CORP—
08/21/2018CompleteATMOS ELECTRIC SVCE CORP—
08/20/2018CompleteATMOS ELECTRIC SVCE CORP—
08/20/2018CompleteATMOS ELECTRIC SVCE CORP—
Building Lifecycle
All (216)Filed (48)Permit Issued (26)Signed Off (14)Violation (11)Inspection (27)Objection (60)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
B01224258-S1-PL
09/14/2026
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01282044-I1
07/17/2026
Permit issued — Plumbing
B01224258-S1-PL
07/15/2026
Filed — Alteration
PROPOSE TO REFURBISH EXISTING ESTABLISHMENT # 2. REMOVAL OF EXISTING NON-BEARING PARTITONS, INSTALL NEW WALK IN BOX, MINOR NEW NON-BEARING PARTITONS AND CABINETRY. NO CHANGE TO USE , OCCUPANCY OR EGRESS.
B01224258-P3
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas SCIRE-CHIANETTA
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas SCIRE-CHIANETTA
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicholas SCIRE-CHIANETTA
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicholas SCIRE-CHIANETTA
07/14/2026
Objection resolved — Resolved
07/10/2026
Objection raised — Other
07/06/2026
Filed — Alteration
PLUMBING WORK AT ESTABLISHMENT # 1 IN CONJUCTION WITH GENERAL CONSTRUCTION FILED UNDER B01210194-I1. NO CHANGE IN USE. OCCUPANCY OR EGRESS.
B01210194-P3
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas SCIRE-CHIANETTA
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Nicholas SCIRE-CHIANETTA
06/24/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/26/2026
Filed — Alteration
PROPOSE TO REFURBISH EXISTING ESTABLISHMENT # 2. REMOVAL OF EXISTING NON-BEARING PARTITONS, INSTALL NEW WALK IN BOX, MINOR NEW NON-BEARING PARTITONS AND CABINETRY. NO CHANGE TO USE , OCCUPANCY OR EGRESS.
B01224258-P2
04/07/2026
Permit issued — Sign
B01282044-I1-SG
04/07/2026
Violation issued (FDNY_ORDER, closed)
04/07/2026
Violation issued (FDNY_ORDER, closed)
04/07/2026
Violation issued (FDNY_ORDER, closed)
03/13/2026
Signed off — Alteration
Sprinkler work modifications as shown on plans.
B01174166-S1
03/12/2026
Signed off — Alteration
ERECT A NON-ILLUMINATED ACCESORY BUSINESS AWNING FOR WONDER RESTAURANT
B01240239-I1
03/12/2026
Signed off — Alteration
INSTALL AN ILLUMINATED ACCESORY BUSINESS WALL SIGN A- WONDER AND LOGO
B01240210-I1
03/12/2026
Signed off — Alteration
B01240231-I1
02/25/2026
Signed off — Alteration
Sprinkler work modifications as shown on plans.
B01174166-S2
02/18/2026
Signed off — Alteration
Sprinkler work modifications as shown on plans.
B01174166-S3
01/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2026
Violation issued (FDNY_ORDER, closed)
01/13/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
01/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
01/09/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
01/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
01/09/2026
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
01/08/2026
Filed — Alteration
Sprinkler work modifications as shown on plans.
B01174166-P2
01/08/2026
Filed — Alteration
Sprinkler work modifications as shown on plans.
B01174166-P3
01/07/2026
Signed off — Alteration
Sprinkler work modifications as shown on plans.
B01174166-I1
12/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2025
Special inspection requirement — Final
Nicholas SCIRE-CHIANETTA
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas SCIRE-CHIANETTA
11/03/2025
Special inspection requirement — Mechanical Systems
Nicholas SCIRE-CHIANETTA
10/31/2025
Filed — Alteration
PROPOSE TO REFURBISH EXISTING ESTABLISHMENT # 2. REMOVAL OF EXISTING NON-BEARING PARTITONS, INSTALL NEW WALK IN BOX, MINOR NEW NON-BEARING PARTITONS AND CABINETRY. NO CHANGE TO USE , OCCUPANCY OR EGRESS.
B01224258-P1
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas SCIRE-CHIANETTA
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
10/31/2025
Special inspection requirement — Maintenance information
JOSEPH YOUNG
10/31/2025
Special inspection requirement — Mechanical Systems
Nicholas SCIRE-CHIANETTA
10/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
10/31/2025
Special inspection requirement — Final
Nicholas SCIRE-CHIANETTA
10/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
10/31/2025
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
10/30/2025
Filed — Alteration
Sprinkler work modifications as shown on plans.
B01174166-P1
10/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Risbergs
09/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Risbergs
09/22/2025
Special inspection requirement — Shutoff dampers
Michael Risbergs
Latest 60 of 216 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOX 18 REALTY14809/30/2026
FOX 18 REALTY LLC FOX 18103/22/2026
POSEIDON PROP INC.103/22/2026
FOX REALTY1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1003/21/2026
YOUN DESIGN CORP203/21/2026
KC EXPEDITING INC3203/21/2026
CITY EXPEDITING203/21/2026
SIGNS CAD603/21/2026
BMB BUILDING CONSULTING203/21/2026
GC1 EXPEDITING203/21/2026
WILLIAM VITACCO ASSOCIATES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HESO ELECTRICAL INC 003646General Contractor303/22/2026
ACHILLE & SON INCGeneral Contractor307/08/2026
SMVP MGMT INCGeneral Contractor303/21/2026
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
CEL TECH CONTRACTING CORPGeneral Contractor303/21/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
SIGNS CADScaffold207/08/2026
PIPESTYLISTS, INCPlumbing207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
GW MECHANICAL CORPPlumbing207/19/2026
COOPER WORKS INCGeneral Contractor204/09/2026
MKSSKR CONSULTING SERVICEGeneral Contractor204/09/2026
ATMOS ELECTRIC SVCE CORPElectrical103/22/2026
UNITECH DESIGNScaffold107/08/2026
LENLITE ELEC'L CONTR'S INElectrical103/22/2026
R & T ELECTRICAL CORPElectrical103/22/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
FRIENDLY FLOOR COVERING IGeneral Contractor104/09/2026
QPR MECHANICALGeneral Contractor103/22/2026
SIGNS CAD CORPGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
BIG APPLE SEWER & DRAIN IPlumbing109/30/2026
QPR MECHANICALPlumbing103/22/2026
TRI CITY MECHANICAL GROUP CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NSC ARCHITECTURE PC20161507/15/2026
METROSPEC SIA6420601/08/2026
FULLERTON ENGINEERING PC8636102/10/2023
KL INNOVATIVE DESIGN INC7225502/09/2022
NY ACOM ENGINEERING PLLC7061910/20/2021
O'ROURKE ENGINEERING, LLC5873101/20/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBIG APPLE SEWER & DRAIN I09/29/2026
DOB NOWPlumbingPermit IssuedGW MECHANICAL CORP07/17/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/07/2026
DOB NOWGeneral ConstructionSigned-offSIGNS CAD CORP06/20/2025
DOB NOWSignSigned-offSIGNS CAD CORP06/20/2025
DOB NOWSignSigned-offSIGNS CAD CORP06/18/2025
DOB NOWGeneral ConstructionPermit IssuedFRIENDLY FLOOR COVERING I06/16/2025
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC06/11/2025
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP06/11/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO06/10/2025
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE06/10/2025
DOB NOWPlumbingPermit IssuedGW MECHANICAL CORP06/10/2025
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE05/20/2025
DOB NOWMechanical SystemsSigned-offCOOPER WORKS04/24/2025
DOB NOWGeneral ConstructionSigned-offCOOPER WORKS04/24/2025
DOB NOWGeneral ConstructionPermit IssuedACHILLE SON12/20/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/16/2024
DOB NOWAntennaSigned-offCEL TECH CONTRACTING CORP05/05/2023
DOB NOWGeneral ConstructionPermit IssuedACHILLE SON03/23/2023
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC08/26/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/15/2021
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY04/22/2021
DOB NOWGeneral ConstructionSigned-offSMVP MGMT INC03/10/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/01/2021
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP02/06/2020
DOB NOWSignSigned-offUNITECH DESIGN INC08/26/2018
BISMHISSUEDJFZ CONSTRUCTION, INC03/31/2019
BISOTISSUEDJFZ CONSTRUCTION, INC03/31/2019
BISSPISSUEDSAFETY FIRE SPRINKLER CORP10/25/2018
BISMHISSUEDMASTER FIRE MECH CORP10/12/2018
BISOTISSUEDCAD SIGNS NYC CORP09/06/2018
BISPLISSUEDEH PLUMBING & HEATING COR08/24/2018
BISFPISSUEDMASTER FIRE SYSTEMS, INC07/26/2018
BIS—ISSUEDACHILLE & SON INC07/20/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP04/13/2018
BISEQISSUEDACHILLE & SON INC04/05/2018
BIS—ISSUEDACHILLE & SON INC04/05/2018
BISOTISSUEDJFZ CONSTRUCTION, INC04/03/2018
BISMHISSUEDJFZ CONSTRUCTION, INC04/03/2018
BISMHISSUEDJ. AND F. REFRIGERATION,*03/16/2018
+ 35 more permits on file
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
06/24/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/15/2026Fire-Resistant Penetrations and JointsNicholas SCIRE-CHIANETTAspecial
07/15/2026Energy Code Compliance InspectionsNicholas SCIRE-CHIANETTAprogress
07/15/2026Energy Code Compliance InspectionsNicholas SCIRE-CHIANETTAprogress
07/15/2026Fire-Resistant Penetrations and JointsNicholas SCIRE-CHIANETTAspecial
07/06/2026Energy Code Compliance InspectionsNicholas SCIRE-CHIANETTAprogress
07/06/2026Fire-Resistant Penetrations and JointsNicholas SCIRE-CHIANETTAspecial
01/09/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
01/09/2026Post-installed AnchorsJOSEPH YOUNGspecial
01/09/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
01/09/2026Maintenance informationJOSEPH YOUNGenergy_progress
01/09/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
11/03/2025FinalNicholas SCIRE-CHIANETTAprogress
11/03/2025Fire-Resistant Penetrations and JointsNicholas SCIRE-CHIANETTAspecial
11/03/2025Mechanical SystemsNicholas SCIRE-CHIANETTAspecial
10/31/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
10/31/2025Fire-Resistant Penetrations and JointsNicholas SCIRE-CHIANETTAspecial
10/31/2025Mechanical SystemsNicholas SCIRE-CHIANETTAspecial
10/31/2025Maintenance informationJOSEPH YOUNGenergy_progress
10/31/2025HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
10/31/2025HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
10/31/2025Energy Code Compliance InspectionsMichael Risbergsprogress
10/31/2025Post-installed AnchorsJOSEPH YOUNGspecial
10/31/2025FinalNicholas SCIRE-CHIANETTAprogress
09/22/2025Post-installed AnchorsMichael Risbergsspecial
Latest 25 of 150.
▾Documents — 691 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch31
09/03/2026B00071447-I1Request digital key ↗
09/01/2026B00469014-P3Request digital key ↗
09/01/2026B00469014-P4Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/01/2026B00469322-P6Request digital key ↗
09/01/2026B00469322-P5Request digital key ↗
09/01/2026B00469322-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/02/2026B00366110-I1Request digital key ↗
09/01/2026B00469014-P3Request digital key ↗
09/01/2026B00469014-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction6
09/01/2026B00469014-P3Request digital key ↗
09/01/2026B00469014-P4Request digital key ↗
09/01/2026B00469014-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe1
09/02/2026B00297017-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits105
▸BISWORK PERMIT APPLICATION40
10/26/2018340115565Open ↗
10/17/2018321742021Open ↗
09/07/2018340499696Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
09/09/2020340743681Open ↗
08/25/2020340743681Open ↗
08/18/2020340743681Open ↗
Showing 3 of 39 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION14
03/17/2020320251687Open ↗
06/14/2019320251687Open ↗
11/29/2018340115565Open ↗
Showing 3 of 14 on file for this type
▸BISPLACE OF ASSEMBLY4
06/09/2020321678831Open ↗
06/09/2020321678840Open ↗
Showing 2 of 4 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening3
09/18/2019321637644Open ↗
09/18/2019321637644Open ↗
09/18/2019321637644Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
01/10/2019320251687Open ↗
12/31/2018320251687Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/03/2018321637644Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
09/18/2019321637644Open ↗
▸BISLimited Alteration Application (LAA1)1
08/07/2019321631490Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
12/02/2019321637644Open ↗
Showing 1 of 3 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications251
▸DOB NOWProgress Inspector Seal & Signature107
09/01/2026B01210194-S1Open ↗
09/01/2026B00469014-P5Open ↗
09/01/2026B00469014-P5Open ↗
Showing 3 of 107 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/03/2026B00071447-I1Open ↗
09/01/2026B00469014-P3Open ↗
09/01/2026B00469014-P4Open ↗
Showing 3 of 47 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
06/09/2020321678840Open ↗
06/09/2020321678831Open ↗
06/09/2020321678840Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/01/2026B01174166-S3Open ↗
09/01/2026B01210194-S1Open ↗
09/01/2026B00469014-P5Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
07/09/2018321742021Open ↗
07/09/2018321742012Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/13/2020340743681Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/09/2018321742021Open ↗
07/09/2018321742012Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/10/2019340237201Open ↗
12/11/2018340115565Open ↗
10/16/2018320251687Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS8
02/28/2020320251687Open ↗
02/28/2020320251687Open ↗
02/28/2020320251687Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/28/2020320251687Open ↗
11/01/2019321428683Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/11/2019321742012Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/23/2018321742012Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
03/18/2020320251687Open ↗
10/03/2019321637644Open ↗
▸BISSTREET TREE CHECKLIST2
03/18/2020320251687Open ↗
08/03/2018321637644Open ↗
▸BISSTREET TREES SITE PLAN1
08/09/2018321637644Open ↗
▸Environmental & Asbestos37
▸DOB NOWOER: Notice to Proceed26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
08/20/2020340743681Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/18/2020320251687Open ↗
11/01/2019321428683Open ↗
07/19/2019340237194Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/24/2020340743681Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/01/2019321428683Open ↗
07/19/2019340237194Open ↗
02/19/2019340499696Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/24/2020340743681Open ↗
07/18/2020321678840Open ↗
07/18/2020321678831Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
03/21/2020320251687Open ↗
02/28/2020320251687Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/28/2020320251687Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/18/2019321637644Open ↗
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
06/11/2020320251687Open ↗
05/26/2020320251687Open ↗
05/18/2020320251687Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
03/27/2020320251687Open ↗
03/18/2020320251687Open ↗
07/15/2019321631490Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
06/19/2019320251687Open ↗
Showing 1 of 5 on file for this type
▸BISSUPERSEDING LETTER2
08/27/2018320251687Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT19
11/01/2019321428683Open ↗
08/07/2019321631490Open ↗
07/19/2019340237194Open ↗
Showing 3 of 19 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE8
08/01/2019320251687Open ↗
07/20/2018320251687Open ↗
Showing 2 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
07/20/2018320251687Open ↗
Showing 1 of 3 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
08/01/2019320251687Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms70
▸BISADDITIONAL INFORMATION33
08/24/2020340743681Open ↗
05/26/2020320251687Open ↗
05/01/2020320251687Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM23
06/09/2020321678831Open ↗
06/09/2020321678840Open ↗
05/01/2020320251687Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET8
07/09/2018321742012Open ↗
07/09/2018321742021Open ↗
Showing 2 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/13/2020340743681Open ↗
Showing 1 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/03/2018321637644Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification4
08/28/2026B00731480-P3Open ↗
08/28/2026B00731480-P2Open ↗
08/28/2026B00731480-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS3
09/24/2020340743681Open ↗
Showing 1 of 3 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
03/18/2020320251687Open ↗
03/18/2020320251687Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type