← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Athena Theatre
1224 ST NICHOLAS AVENUE · BIN 1063062
💬 Discuss this project
1937Year Built
6Stories
D1Building Class
R7-2Zoning
21,582 sfGross Floor Area
47Units
Rent Stabilized0 Active Violations
Elevator apt, semi-fireproof without stores · Owner of record: Tasha Realty · 5,000 sf lot · 4.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 2 docs
CellarPine Management, INC.2p · 2 filings · 8 docs
Site & exteriorPine Management, INC.7p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Tasha Co903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jeon Consulting202/12/2024
Bangash Associates103/14/2023
Enthink Engineers101/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AP-Tech ContractingGeneral Contractor307/08/2026
JTJ StudioGeneral Contractor303/21/2026
Reliable EnterprisesScaffold207/08/2026
AP Plumbing & HVACPlumbing207/08/2026
KYL ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jeon Consulting5119202/12/2024
Bangash Associates8488103/14/2023
Building Lifecycle
02/05/2026
Elevator Category 1 inspection report filed
01/23/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/14/2026
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED…
HPD violation · closed
01/14/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT BAS1, 1st APARTMENT FROM WEST AT NORTH
HPD violation · closed
01/14/2026
§ 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE IN…
HPD violation · closed
94 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJTJ Studio02/23/2024
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating02/20/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises12/12/2023
DOB NOWGeneral ConstructionSigned-offAP-Tech Contracting07/31/2023
DOB NOWGeneral ConstructionSigned-offAP-Tech Contracting03/24/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises01/27/2023
BISOTISSUEDJTJ Studio09/21/2018
BISPLISSUEDInfiniti Esc Plumbing02/23/2017
BISOTISSUEDCasur Management & Maintenance*02/17/2017
BISOTISSUEDAP-Tech Contracting09/14/2016
BISMHISSUEDMetropolitan Painting &08/22/2014
BISPLISSUEDAbsolute Plumbing & Heating & Mechanical08/13/2014
2 projects · most recent 01/27/2023
General Wiring
FiledStatusContractorScope
01/27/2023CompleteRichard Neu—
02/23/2021CompleteKYL ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/24/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/09/2024Tenant Protection Plan ComplianceBENJAMIN JEONspecial
01/23/2024Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
03/14/2023Tenant Protection Plan ComplianceFAZAL BANGASHspecial
03/03/2023Construction Operations Influencing Adjacent StructuresFAZAL BANGASHspecial
03/03/2023Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
03/03/2023FinalFAZAL BANGASHprogress
87 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account