← Back
Four families
1227 BRONX RIVER AVENUE
BRONX · BIN 2024964
💬 Discuss this project
1926Year Built
2Stories
C3Building Class
R6Zoning
3,200 sfGross Floor Area
4Units
Rent Stabilized12 Open Violations 7 unresolved · 5 paperwork only ▸FDNY Report ↗
Four families · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR104/07/2026
TOM PETERSEN ARCHITECT, LLC105/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM PROFESSIONALS103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281104/07/2026
THOMAS PETERSEN ARCHITECT7854105/13/2025
Building Lifecycle
All (36)Filed (2)Permit Issued (1)Violation (23)Inspection (4)Special Inspection (6)
05/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2026
Permit issued — Solar
X01380980-I1-SL
05/15/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/07/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 17 MODULES, 6.97KW
X01380980-I1
04/07/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
04/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
03/31/2026
Special inspection requirement — Final
Mina Makar
09/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/13/2025
Filed — Alteration
X01221978-I1
04/02/2024
Violation issued (HPD, closed)
A
03/16/2023
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
10/02/2015
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
07/21/2010
Violation issued (ECB, closed)
Construction
02/03/2010
Violation issued (ECB, closed)
Construction
09/29/2009
Violation issued (ECB, closed)
Construction
06/09/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2009
Violation issued (ECB, open)
Construction
05/18/2009
Violation issued (ECB, open)
Quality of Life
01/18/2008
Violation issued (ECB, open)
HPD
12/04/2007
Violation issued (HPD, open)
B
12/04/2007
Violation issued (HPD, open)
B
11/19/2007
Violation issued (HPD, open)
B
11/19/2007
Violation issued (HPD, open)
B
11/19/2007
Violation issued (HPD, open)
B
05/04/2007
Violation issued (ECB, open)
Construction
05/04/2007
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR05/21/2026
2 jobs · most recent 03/31/2026
FiledStatusContractorScope
03/31/2026Permit IssuedISLAND ELECTRIC CORP—
05/05/2025Permit IssuedAMBER ELECTL CONTNG INC—
1 job · most recent 04/07/2026
FiledStatusContractorScope
04/07/2026Permit IssuedMOMENTUM SOLAR17 panels, 6.97 kw, 299 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/07/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
04/07/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
04/07/2026Air barrier - visual inspectionMina Makarenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsMina Makarspecial
03/31/2026Energy Code Compliance InspectionsMina Makarprogress
03/31/2026FinalMina Makarprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01221978-I1Request digital key ↗
08/17/2026X01380980-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026X01380980-I1Open ↗
08/29/2026X01380980-I1Open ↗
08/29/2026X01380980-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01221978-I1Open ↗
08/17/2026X01380980-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026X01380980-I1Open ↗
08/29/2026X01380980-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01221978-I1Open ↗
08/17/2026X01380980-I1Open ↗