← Back
Two family frame
1228 MORRIS AVENUE
BRONX · BIN 2102800
💬 Discuss this project
2001Year Built
2Stories
B2Building Class
R7-1Zoning
2,028 sfGross Floor Area
2Units
Rent Stabilized8 Open Violations ▸
Two family frame · Owner of record: 1228 MORRIS AVE LLC · 1,965 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 11p · 1 filing · 7 docs
CellarUnder Construction11p · 1 filing · 8 docs
1 job · most recent 03/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/11/2026Permit IssuedDPH PLUMBING & HTG CORPGas, Water/Sanitary
1 job · most recent 02/25/2025
General Wiring
FiledStatusContractorScope
02/25/2025Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
Building Lifecycle
All (7)Filed (3)Permit Issued (2)Signed Off (2)
08/03/2026
Signed off — Alteration
CAP&REMOVE EX 3 PCS BATHROOM, EX GAS BOILER & EX. HWH TANKS. REPLACED WITH EL HWH TANKS & MINI SPLIT HVAC SYSTEM FOR HEATING. TO CORRECT ECB VIOLATIONS# 39108715L, 39108713H & 39070980L.
X01180441-I1
04/10/2026
Signed off — Alteration
INTERIOR RENOIVATION OF EXISITN GBUILDING, REMOVE ILLEGAL CONDTIONS AT CELLAR TO RESOLVE ECB VIOLATIONS# 39108713H;39108715L;39070980L. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
X01180428-I1
03/11/2026
Filed — Alteration
CAP&REMOVE EX 3 PCS BATHROOM, EX GAS BOILER & EX. HWH TANKS. REPLACED WITH EL HWH TANKS & MINI SPLIT HVAC SYSTEM FOR HEATING. TO CORRECT ECB VIOLATIONS# 39108715L, 39108713H & 39070980L.
X01180441-P1
08/26/2025
Permit issued — Plumbing
X01180441-I1-PL
07/07/2025
Permit issued — General Construction
X01180428-I1-GC-CX
03/25/2025
Filed — Alteration
CAP&REMOVE EX 3 PCS BATHROOM, EX GAS BOILER & EX. HWH TANKS. REPLACED WITH EL HWH TANKS & MINI SPLIT HVAC SYSTEM FOR HEATING. TO CORRECT ECB VIOLATIONS# 39108715L, 39108713H & 39070980L.
X01180441-I1
02/26/2025
Filed — Alteration
INTERIOR RENOIVATION OF EXISITN GBUILDING, REMOVE ILLEGAL CONDTIONS AT CELLAR TO RESOLVE ECB VIOLATIONS# 39108713H;39108715L;39070980L. NO CHANGE IN USE , EGRESS OR OCCUPANCY.
X01180428-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MORRIS WEBSTER CORP303/22/2026
JNJ DEVELOPMENT403/21/2026
1228 MORRIS AVE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2024$475K—303 RE INVESTMENTS, LLC → 1228 MORRIS AVE LLC$234/sf building
10/12/2018$450K—Private party → RG MANAGEMENT CONSULTING CORP$222/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYED303/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH PLUMBING & HTG CORPPlumbing206/28/2026
LINDNER, SHMUELElectrical103/21/2026
JOHN EVAN CONTRACTING CORGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519303/11/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP08/26/2025
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR07/07/2025
BIS—ISSUEDFRANCISCO JEDRZEJCZYK08/31/2001
BISEQISSUEDFRANCISCO JEDRZEJCZYK08/31/2001
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/25/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/17/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/02/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/12/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/12/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
02/12/2025FinalNAVEEN KUMARprogress
02/12/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/12/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
02/12/2025Mechanical SystemsYounes Abouyaalaspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01180428-I1Request digital key ↗
08/17/2026X01180441-P1Request digital key ↗
08/17/2026X01180441-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X01180428-I1Open ↗
09/23/2026X01180428-I1Open ↗
08/26/2026X01180441-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01180441-P1Open ↗
08/17/2026X01180441-I1Open ↗
08/13/2026X01180428-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X01180428-I1Open ↗
09/23/2026X01180428-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026X01180441-P1Open ↗
08/17/2026X01180441-I1Open ↗
08/13/2026X01180428-I1Open ↗