← Back
Two family frame
1228 ROCKLAND AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5037453
💬 Discuss this project
1965Year Built
2Stories
B2Building Class
R3-1Zoning
2,950 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,920 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof1p · 1 filing · 20 docs
Attic4p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Site & exterior12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC503/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOLLYWOOD CONS. GROUP INCGeneral Contractor603/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795203/18/2026
Building Lifecycle
All (45)Filed (5)Permit Issued (4)Violation (1)Inspection (5)Special Inspection (30)
04/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/02/2026
Special inspection requirement — Subgrade Inspections
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Footing and Foundation
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Structural Wood Frame
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Insulation placement and R values
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Permanent certificate
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Protection of exposed foundation insulation
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Fenestration air leakage
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Fenestration areas
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Metering
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Air barrier - visual inspection
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Ventilation and air distribution system
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — Interior lighting power
MICHAEL KARANTINIDIS, P.E.
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
03/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2026
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT TO REPAIR FIRE DAMAGED BUILDING.
S00827555-P1
03/18/2026
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT TO REPAIR FIRE DAMAGED BUILDING.
S00827555-P2
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL KARANTINIDIS, P.E.
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
03/12/2026
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL KARANTINIDIS, P.E.
02/17/2026
Permit issued — Plumbing
S00827555-S2-PL
03/08/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/11/2023
Permit issued — Plumbing
S00827555-S2-PL
06/20/2023
Permit issued — Foundation
S00827555-S1-GC-CX
06/12/2023
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT TO REPAIR FIRE DAMAGED BUILDING.
S00827555-S2
06/09/2023
Permit issued — Construction Fence
S00827555-I1-FN
02/21/2023
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT TO REPAIR FIRE DAMAGED BUILDING.
S00827555-S1
02/16/2023
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT TO REPAIR FIRE DAMAGED BUILDING.
S00827555-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/17/2026
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR08/11/2023
DOB NOWFoundationPermit IssuedHOLLYWOOD CONS. GROUP INC06/20/2023
DOB NOWConstruction FencePermit IssuedHOLLYWOOD CONS. GROUP INC06/09/2023
1 project · most recent 10/03/2023
General Wiring
FiledStatusContractorScope
10/03/2023CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
04/02/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/02/2026Subgrade InspectionsMICHAEL KARANTINIDIS, P.E.special
04/02/2026Structural Stability – Alterations of existing buildingsMICHAEL KARANTINIDIS, P.E.special
04/02/2026Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
04/02/2026Concrete - Cast-In-PlaceMICHAEL KARANTINIDIS, P.E.special
04/02/2026Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
04/02/2026Fire-Resistance Rated ConstructionMICHAEL KARANTINIDIS, P.E.progress
04/02/2026Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
04/02/2026Footing and FoundationMICHAEL KARANTINIDIS, P.E.progress
04/02/2026Structural Wood FrameMICHAEL KARANTINIDIS, P.E.progress
04/02/2026FinalMICHAEL KARANTINIDIS, P.E.progress
04/02/2026Insulation placement and R valuesMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Permanent certificateMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Protection of exposed foundation insulationMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Fenestration and door U-factor and product ratingsMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Fenestration air leakageMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Fenestration areasMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026MeteringMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Air barrier - visual inspectionMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Ventilation and air distribution systemMICHAEL KARANTINIDIS, P.E.energy_progress
04/02/2026Interior lighting powerMICHAEL KARANTINIDIS, P.E.energy_progress
Latest 25 of 52.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00827555-P2Request digital key ↗
08/23/2026S00827555-I1Request digital key ↗
08/23/2026S00827555-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
03/16/2023540245796Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/23/2026S00827555-P2Open ↗
08/13/2026S00827555-S1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature40
09/01/2026S00827555-P2Open ↗
09/01/2026S00827555-P2Open ↗
09/01/2026S00827555-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026S00827555-P2Open ↗
09/01/2026S00827555-P2Open ↗
09/01/2026S00827555-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00827555-I1Open ↗
08/23/2026S00827555-S1Open ↗
08/23/2026S00827555-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/01/2023540245796Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/01/2023540245796Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/23/2026S00827555-S1Open ↗
08/23/2026S00827555-P2Open ↗
08/13/2026S00827555-S1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
03/01/2023540245796Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/01/2023540245796Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00827555-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/16/2023540245796Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
03/01/2023540245796Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/23/2026S00827555-P2Open ↗
08/13/2026S00827555-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/23/2026S00827555-P2Open ↗
08/13/2026S00827555-S1Open ↗
▸DOB NOWPlot Diagram2
08/23/2026S00827555-P2Open ↗
08/13/2026S00827555-S1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/16/2023540245796Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/16/2023540245796Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
03/01/2023540245796Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/01/2023540245796Open ↗