โ† Back
BuildNYC
MANHATTAN
River Building
1228 YORK AVENUE ยท BIN 1089711
๐Ÿ’ฌ Discuss this project
โ€”Year Built
โ€”Stories
โ€”Building Class
โ€”Zoning
โ€”Gross Floor Area
โ€”Units
LL97 Covered0 Active Violations
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 310 filings
Floor 24 filings
Floor 116 filings
โ–พDesign Consultants (Architect / Engineer of Record)
โ–พFiling Representatives (Expediters)
RepresentativeFilingsMost Recent
Oculus Consulting Group1303/21/2026
J Callahan Consulting3403/21/2026
โ–พContractors (License-Anchored)
FirmTradeRolesMost Recent
Caldwell Walsh Buildingspecialty_contractor907/08/2026
Cardoza PlumbingPlumbing707/08/2026
Renew PlumbingPlumbing403/22/2026
Premier Fire SprinklerFire Protection403/21/2026
Caldwell & Walsh Building ConstructionGeneral Contractor407/08/2026
NYC Fire SprinklerFire Protection307/08/2026
Olympic Plumbing & Heating Servicespecialty_contractor307/08/2026
M J Mechanicalspecialty_contractor107/08/2026
Unique Scaffolding SystemGeneral Contractor103/21/2026
E-J Electric InstallationElectrical103/22/2026
FiremastersFire Protection103/21/2026
GrinnellFire Protection103/21/2026
Consigli ConstructionGeneral Contractor107/08/2026
Turner Construction CompanyGeneral Contractor103/21/2026
Adco ElectricalElectrical103/22/2026
Safway AtlanticGeneral Contractor1311/28/2018
United Hoisting & ScaffGeneral Contractor506/01/2017
Universal Builders SupplyGeneral Contractor106/14/2016
โ–พSpecial Inspection Agencies
AgencyLicense #FilingsMost Recent
Jaj Engineering9301007/23/2025
Atlas ATC Engineering8011811/17/2023
Oculus Consulting Group3609309/08/2022
Atlantic Engineeringlabor1381112/18/2019
Building Lifecycle
10/08/2026
Elevator Category 1 inspection report filed
08/27/2025
Signed off โ€” Alteration
INTERIOR RENOVATION TO EX LABORATORY (1ST FLOOR - FLAMHOLZ LAB) AT KRB-ROCKEFELLER UNIVERSITY. MODIFICATION TO EXISTING SPRINKLER SYSTEM, INCLUDING SPRINKLER HEADS, PIPING AND CONTROLS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01118730-I1
08/19/2025
Signed off โ€” Alteration
INTERIOR RENOVATION TO EX LABORATORY (1ST FLOOR - FLAMHOLZ LAB) AT KRB-ROCKEFELLER UNIVERSITY. MODIFICATION TO EXISTING MECHANICAL SYSTEM, INCLUDING EXISTING DUCTWORK, CONTROLS, VALVES, ETC. NEW FAN COIL UNIT. NO CHANGE IN, USE OCCUPANCY, OR EGRESS
M01118688-I1
08/19/2025
Signed off โ€” Alteration
INTERIOR RENOVATION TO EX LAB (1ST FL-FLAMHOLZ LAB) AT KRB-ROCKEFELLER UNIVERSITY. MODIFICATION TO EX PLUMBING SYSTEM, INCLUDING PIPING & CONTROLS. NEW LAB SINK. NEW SUMP PUMP. MODIFICATION TO EX LAB GAS SYSTEM INCL CYLINDERS, MANIFOLDS, PIPING, ETC.
M01118723-I1
08/13/2025
Signed off โ€” Alteration
INTERIOR RENOVATION TO EX LABORATORY (1ST FLOOR - FLAMHOLZ LAB) AT KRB-ROCKEFELLER UNIVERSITY. NEW NON-BEARING PARTITIONS. NEW SUSPENDED CEILING IN SELECTED AREAS. NEW CABINETS, COUNTERS & FINISHES AS PER DRAWINGS. NO CHANGE IN, USE OCCUPANCY, OR EGRESS
M01117239-I1
149 history events on file for this building. Sign in free to see the full history. Sign in ยท Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWโ€”M & J Mechanicalโ€”
DOB NOWโ€”Olympic Plumbing & Heating Servicesโ€”
DOB NOWโ€”Olympic Plumbing & Heating Serviceโ€”
DOB NOWโ€”Consigli Constructionโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Cardoza Plumbingโ€”
DOB NOWโ€”NYC Fire Sprinklerโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”NYC Fire Sprinklerโ€”
DOB NOWโ€”Cardoza Plumbingโ€”
DOB NOWโ€”NYC Fire Sprinklerโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Caldwell & Walsh Building Constructionโ€”
DOB NOWโ€”Cardoza Plumbingโ€”
DOB NOWโ€”Cardoza Plumbingโ€”
BISโ€”Caldwell & Walsh Building Constructionโ€”
BISโ€”Turner Construction Companyโ€”
BISโ€”Caldwell & Walsh Building Constructionโ€”
BISโ€”Grinnellโ€”
BISโ€”Caldwell & Walsh Building Constructionโ€”
BISโ€”Turner Construction Companyโ€”
BISโ€”Cardoza Plumbingโ€”
BISโ€”Cardoza Plumbingโ€”
BISโ€”Grinnellโ€”
BISโ€”Premier Fire Sprinklerโ€”
BISโ€”Firemastersโ€”
BISโ€”Safway Atlanticโ€”
BISโ€”Turner Construction Companyโ€”
BISโ€”Safway Atlanticโ€”
BISโ€”Safway Atlanticโ€”
BISโ€”Turner Construction Companyโ€”
BISโ€”Firemastersโ€”
BISโ€”Cardoza Plumbingโ€”
BISโ€”Premier Fire Sprinklerโ€”
BISโ€”Premier Fire Sprinklerโ€”
BISโ€”Safway Atlanticโ€”
+ 29 more permits on file
Nothing on file for this building.
Nothing on file for this building.
496 filed documents on file for this building. Sign in free to see the full history. Sign in ยท Create account