| Owner | Filings | Most Recent |
|---|---|---|
| UNITED DEVELOPERS | 19 | 07/08/2026 |
| 1855 ATLANTIC AVE | 7 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 02/28/2023 | $1.4M | — | — → — | $446/sf building |
| 08/24/2021 | $425K | — | Private party → MAT FUNDING LLC | — not available |
| 10/13/2020 | $350K | — | 123-07 ROCKAWAY BEACH BOULEVARD LLC → Private party | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| A&D ENGINEERING, PLLC | 1 | 07/18/2023 |
| CL ENGINEERING P.C. | 6 | 07/29/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| MISTER EXPEDITER | 1 | 03/21/2026 |
| METRO DESIGN CONSULTANTS INC | 12 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| YAFE MEOD CORP | General Contractor | 7 | 07/08/2026 |
| INFINITI ESC PLUMBING COR | Plumbing | 1 | 07/08/2026 |
| ZAPAS CONSTRUCTION CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CL ENGINEERING P.C. | 6781 | 4 | 07/29/2022 |
| IP CONCRETE TESTING AND I | 6252 | 2 | 07/29/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Signed-off | ZAPAS CONSTRUCTION CORP | 07/18/2023 |
| DOB NOW | Curb Cut | Signed-off | YAFE MEOD CORP | 07/20/2022 |
| DOB NOW | Plumbing | Signed-off | INFINITI ESC PLUMBING COR | 03/11/2022 |
| DOB NOW | Structural | Permit Issued | YAFE MEOD CORP | 02/24/2022 |
| DOB NOW | Construction Fence | Signed-off | YAFE MEOD CORP | 02/23/2022 |
| BIS | PL | ISSUED | PLUMBING PLUMBING & PLUMBING | 11/21/2007 |
| BIS | — | ISSUED | MALBRO, INC ING | 01/08/2007 |
| BIS | EQ | ISSUED | MALBRO INC | 01/08/2007 |
| BIS | — | ISSUED | MALBRO, INC | 01/08/2007 |
| BIS | EQ | ISSUED | DEC CONTRACTORS LLC | 11/17/2006 |
| BIS | OT | ISSUED | N.A | 08/20/1999 |
| BIS | OT | ISSUED | OWNER | 02/09/1999 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/29/2022 | Signed-off | YAFE MEOD CORP | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-3C30N2 28,600 BTU · Vrf Outdoor ×8 Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×8 Delta Breeze SMT150 150 CFM · Exhaust Fan ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2022 | Signed-off | INFINITI ESC PLUMBING COR | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/19/2023 | Permit Issued | SHELBY ELECTRICAL CORP | General Wiring |
| 03/14/2022 | Complete | SKY ELECTRIC LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2022 | Signed-off | YAFE MEOD CORP | Steel, Concrete, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2022 | Signed-off | YAFE MEOD CORP | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 11/27/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/18/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/18/2023 | Certified Gas-Gas-Piping-Underground | Certified | View ↗ |
| 02/03/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/11/2022 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 08/04/2022 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/25/2022 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 04/14/2022 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 04/14/2022 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 04/14/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/14/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/10/2022 | HVAC-R and service water piping design and insulation | CHRISTIAN LOZADA | energy_progress |
| 08/10/2022 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | INDARDEO PARBHUNATH | special |
| 08/10/2022 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 08/10/2022 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 08/10/2022 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 08/10/2022 | Maintenance information | CHRISTIAN LOZADA | energy_progress |
| 08/10/2022 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |
| 08/10/2022 | HVAC-R and service water heating system controls | CHRISTIAN LOZADA | energy_progress |
| 07/26/2022 | Structural Cold-Formed Steel | CHRISTIAN LOZADA | special |
| 07/26/2022 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 07/26/2022 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 07/26/2022 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 07/26/2022 | Subsurface Investigations (Borings/Test Pits) | INDARDEO PARBHUNATH | special |
| 07/26/2022 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 07/26/2022 | Final | CHRISTIAN LOZADA | progress |
| 07/26/2022 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |
| 07/26/2022 | Footing and Foundation | CHRISTIAN LOZADA | progress |
| 07/26/2022 | Lowest Floor Elevation | CHRISTIAN LOZADA | progress |
| 07/26/2022 | Structural Wood Frame | CHRISTIAN LOZADA | progress |
| 07/26/2022 | HVAC-R and service water heating system controls | CHRISTIAN LOZADA | energy_progress |
| 07/26/2022 | Fenestration air leakage | CHRISTIAN LOZADA | energy_progress |
| 07/26/2022 | HVAC-R and service water piping design and insulation | CHRISTIAN LOZADA | energy_progress |
| 07/26/2022 | Insulation placement and R values | CHRISTIAN LOZADA | energy_progress |
| 07/26/2022 | Fenestration and door U-factor and product ratings | CHRISTIAN LOZADA | energy_progress |
| 07/26/2022 | Fenestration areas | CHRISTIAN LOZADA | energy_progress |