← Back
Over six families without stores
123 3 PLACE
BROOKLYN · BIN 3007947
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6BZoning
6,580 sfGross Floor Area
8Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 123 3RD PLACE MANAGEMENT LLC · 2,500 sf lot · 2.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY807/08/2026
123 3RD PLACE MANAGEMENT LLC203/22/2026
3X RESTORATION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2015$2.3M—123 3RD PLACE REALTY LLC → 123 3RD PLACE MANAGEMENT LLC$350/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SCADUTO ARCHITECT605/23/2024
FL&M ENGINEERING DESIGN &INSPECTION206/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor407/08/2026
3X RESTORATION CORPGeneral Contractor303/21/2026
INPUT ELECTRIC CORPElectrical103/22/2026
DAWN GENERAL CONTRACTOR IGeneral Contractor107/08/2026
ENVISION IT RESTORATIONGeneral Contractor107/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL SCADUTO ARCHITECT4833508/03/2023
Building Lifecycle
All (58)Filed (8)Permit Issued (6)Signed Off (5)Violation (5)Inspection (6)Objection (28)
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Other
05/24/2024
Objection resolved — Addressed
05/23/2024
Filed — Alteration
INSTALLATION OF SPLIT-SYSTEM ACs AT APTS. 3R & 4R
B01055666-I1
01/09/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-GC INTERIOR RENOVATION: NEW/REPLACE/RELOCATE FIXTURES AND PIPING THROUGHOUT APTS 1L, 1R, AND 2R. NEW RISERS UP FROM METERS
B08001733-I1
12/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2023
Signed off — Alteration
interior renovation of Apts. 1L, 1R, and 2R. replace fixtures, finishes, lighting, and interior partitions, etc. new exterior door and steps to yard from Apt. 1L. no change to use, egress, or occupancy.
B08001722-I1
12/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/01/2023
Signed off — Alteration
interior renovation of Apts. 1L, 1R, and 2R. replace fixtures, finishes, lighting, and interior partitions, etc. new exterior door and steps to yard from Apt. 1L. no change to use, egress, or occupancy.
B08001722-S1
12/01/2023
Signed off — Alteration
B00891770-I1
12/01/2023
Signed off — Alteration
B00867996-I1
11/30/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/30/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/13/2023
Permit issued — General Construction
B08001722-S1-GC
08/24/2023
Permit issued — General Construction
B08001722-S1-GC
08/10/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Other
08/03/2023
Filed — Alteration
interior renovation of Apts. 1L, 1R, and 2R. replace fixtures, finishes, lighting, and interior partitions, etc. new exterior door and steps to yard from Apt. 1L. no change to use, egress, or occupancy.
B08001722-S1
06/20/2023
Filed — Alteration
B00891770-I1
06/20/2023
Permit issued — Sidewalk Shed
B00891770-I1-SH
06/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-GC INTERIOR RENOVATION: NEW/REPLACE/RELOCATE FIXTURES AND PIPING THROUGHOUT APTS 1L, 1R, AND 2R. NEW RISERS UP FROM METERS
B08001733-P2
05/15/2023
Permit issued — Plumbing
B08001733-I1-PL
05/04/2023
Permit issued — Supported Scaffold
B00867996-I1-SF
05/03/2023
Filed — Alteration
B00867996-I1
04/25/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-GC INTERIOR RENOVATION: NEW/REPLACE/RELOCATE FIXTURES AND PIPING THROUGHOUT APTS 1L, 1R, AND 2R. NEW RISERS UP FROM METERS
B08001733-P1
01/26/2023
Permit issued — General Construction
B08001722-I1-GC
12/14/2022
Violation issued (ECB, closed)
Construction
10/13/2022
Objection raised — Other
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection raised — Other
10/13/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Inspections
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Other
09/20/2022
Objection resolved — Addressed
09/19/2022
Objection raised — Other
09/19/2022
Objection resolved — Addressed
09/15/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-GC INTERIOR RENOVATION: NEW/REPLACE/RELOCATE FIXTURES AND PIPING THROUGHOUT APTS 1L, 1R, AND 2R. NEW RISERS UP FROM METERS
B08001733-I1
09/15/2022
Filed — Alteration
interior renovation of Apts. 1L, 1R, and 2R. replace fixtures, finishes, lighting, and interior partitions, etc. new exterior door and steps to yard from Apt. 1L. no change to use, egress, or occupancy.
B08001722-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offENVISION IT RESTORATION10/13/2023
DOB NOWGeneral ConstructionSigned-offDAWN GENERAL CONTRACTOR I08/24/2023
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP06/20/2023
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C05/15/2023
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP05/04/2023
DOB NOWGeneral ConstructionSigned-off3X RESTORATION CORP01/26/2023
1 project · most recent 05/23/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/23/2024——Air Conditioning Systems
Cooling
Lg L3H36W09091800 (LMU363HV+LSN090HSV5+LSN180HSV5) 36,000 BTU · Split System ×2
1 project · most recent 12/12/2023
General Wiring
FiledStatusContractorScope
12/12/2023CompleteINPUT ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/30/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/30/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/22/2024Tenant Protection Plan Compliance—special
05/22/2024Fire-Resistant Penetrations and Joints—special
05/22/2024Mechanical Systems—special
05/22/2024HVAC-R and service water heating equipmentMichael Scadutoenergy_progress
05/22/2024HVAC-R and service water heating system controlsMichael Scadutoenergy_progress
05/22/2024HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
05/22/2024Energy Code Compliance InspectionsMichael Scadutoprogress
05/22/2024Final—progress
08/02/2023MasonryMichael Scadutospecial
08/02/2023Tenant Protection Plan ComplianceMichael Scadutospecial
05/25/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
05/25/2023Energy Code Compliance InspectionsMichael Scadutoprogress
05/25/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
05/22/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
05/22/2023Energy Code Compliance InspectionsMichael Scadutoprogress
05/22/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
04/12/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
04/12/2023Energy Code Compliance InspectionsMichael Scadutoprogress
04/12/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
09/11/2022Fenestration and door U-factor and product ratingsMichael Scadutoenergy_progress
09/11/2022Lighting in dwelling unitsMichael Scadutoenergy_progress
09/11/2022HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
09/11/2022HVAC-R and service water heating system controlsMichael Scadutoenergy_progress
09/11/2022HVAC-R and service water heating equipmentMichael Scadutoenergy_progress
09/11/2022Fenestration air leakageMichael Scadutoenergy_progress
Latest 25 of 28.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026B08001733-P1Request digital key ↗
08/28/2026B08001733-P2Request digital key ↗
08/28/2026B08001722-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B08001733-P2Open ↗
08/28/2026B08001733-I1Open ↗
08/28/2026B08001733-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B08001722-I1Open ↗
09/01/2026B08001722-I1Open ↗
08/28/2026B08001733-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B08001722-I1Open ↗
08/28/2026B08001733-P1Open ↗
08/28/2026B08001733-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B08001733-P2Open ↗
08/28/2026B08001733-P1Open ↗
08/15/2026B08001733-I1Open ↗
Showing 3 of 4 on file for this type