← Back
BuildNYC
Two family frame
123-34 MILBURN STREET
QUEENS · St. Albans · BIN 4273944
💬 Discuss this project
1950Year Built
1.67Stories
B2Building Class
R2Zoning
1,318 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
StructuralElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic Solar Panel Installation3p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering101/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Solar ElectlElectrical103/22/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272101/17/2024
Building Lifecycle
12/15/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00976973-I1
02/02/2024
Permit issued — Solar
Q00976973-I1-SL
01/17/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00976973-I1
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service02/02/2024
2 projects · most recent 08/04/2026
HVAC Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedE D ElectricalHVAC Wiring
01/17/2024CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/14/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/14/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/14/2023Energy Code Compliance InspectionsWalid Abdullaprogress
12/14/2023FinalWalid Abdullaprogress
12/14/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account