DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/18/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/29/2016FAILURE TO COMPLY W/AN ORDER BY THE COMMISSONER.THE RESPONDENT FAILED TO COMPLY W/AN UNDER WHICH WAS ISSUED BY THE DOB ON 02/25/16 TO IMMEDIATELY BACKFILL THE EXCAVATION & TO (ERECT) AM ADEQUATE JOBSITE TO SAFENothing owed — awaiting certificate of correction
ECB02/25/20163301.3.DESIGNATED CONSTRUCTION SUPERINTENDENT HAS NOT ADEQUATELY DISCHARGED HIS RESPONSIBILITIES IN THAT THE SITE WAS FOUND TO BE UNSAFE AT THE TIME OF INSPECTION.THE RESPONDENT FAILED TO ENSURE THAT THE JOBSITNothing owed — awaiting certificate of correction
ECB02/25/2016FAILURE TO NOTIFY THE DOB WITHIN 24 TO 48 HOURS OF THE START OF EXCAVATION.AT THE TIME OF INSPECTION,THE JOBSITE WAS EXCAVATED DOWN TO A DEPTH OF MORE THAN SIX FEET AND THE DOB WAS NOT NOTIFIED OF THE START OFNothing owed — awaiting certificate of correction
ECB02/25/2016FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.OBSERVED LOOSE AND UNSECURED SHEETS OF PLYWOOD AT THE JOBSITE.THESE CAN BECOME AIRBORNE DURING PERIOD OF STRONG WIND(LIKE TODAY)Nothing owed — awaiting certificate of correction
ECB02/25/2016FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.OBSERVED PLYWOOD FENCE AT EXPOSURE 1 BEING USED TO SUPPORT EXCAVATED MATERIAL.THERE IS AN ACTIVE SIDEWALK ADJOINING THE FENCE OFNothing owed — awaiting certificate of correction
ECB02/25/20163304.4.3.FAILURE TO PROVIDE THE REQUIRED LOT-WISE CONSTRUCTION FENCE.FAILURE TO PROVIDE THE REQUIRED FENCE AT THE JOBSITE.SECTION OF FENCE WAS MISSING AT EXPOSURES 2,3 AND 4.JOBSITE WAS ACCESSIBLE WHERE THERE INothing owed — awaiting certificate of correction
ECB02/25/20163304.4.5.EXCAVATED MATERIAL PLACED TOO CLOSE TO THE EDGE OF AN UNBRACED EXCAVATION.OBSERVED EXCAVATED MATERIAL STOCK PILED AT THE EDGE OF ANUNBRACED EXCAVATION.THIS CREATES A HAZARDOUS CONDITION AND MAY LEAD TONothing owed — awaiting certificate of correction
ECB02/25/2016FAILURE TO PROVIDE 3 FOOT 6 INCH GUARD RAIL ON SOLID ENCLOSURE AROUND OPEN AND ACCESIBLE SIDES OF EXCAVATION.OBSERVED EXCAVATION WHICH IS MORE THAN 6 FEET DEEP AND THERE WAS NO GUARDRAIL NOT ANY FORM OF FALL PRNothing owed — awaiting certificate of correction
ECB02/25/2016FAILURE TO PROVIDE PROTECTION AT THE SIDES OF EXCAVATION.OBSERVED EXCAVATION WHICH WAS MORE THAN SIX FEET DEEP WITH VERTICAL SHEAR CUT AND THERE WAS NO TYPE OF SUPPORT OF EXCAVATION(SOE)INSTALL TO PROVIDE PROTENothing owed — awaiting certificate of correction