← Back
BuildNYC
Zoned residential, not Manhattan
123 FATHER CAPODANNO BOULEVARD
STATEN ISLAND · BIN 5046087
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3-1Zoning
0 sfGross Floor Area
0Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: Resilient Homes Housing Development Fund Company · 3,795 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
AtticUrban Ecospaces INCUnder Construction24p · 1 filing · 20 docs
Floor 2Urban Ecospaces INCUnder Construction26p · 1 filing · 20 docs
Floor 1Urban Ecospaces INCUnder Construction35p · 2 filings · 20 docs
Site & exteriorUrban Ecospaces INCUnder Construction34p · 4 filings · 20 docs
Filed — no permit issuedConstruction fence installation4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Project Rebuild2510/10/2026
Resilient Homes HDFC806/02/2026
Urban Ecospaces710/01/2026
Neighborhood Renewal HDFC607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Melanie Cragnolin710/24/2025
Age Engineering103/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Neris1203/21/2026
Russo Development Enterprises103/21/2026
Rockaway Beach BLVD Construciton403/21/2026
Resilient Homes HDFC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Urban EcospacesGeneral Contractor607/04/2026
Urban EcospacesScaffold310/10/2026
Capital Contracting P&HPlumbing210/01/2026
Rockaway Beach BLVD ConScaffold107/08/2026
Russo Development EnterprisesScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803304/14/2025
Building Lifecycle
All (63)Filed (10)Permit Issued (12)Signed Off (1)Violation (8)Inspection (2)Objection (12)Special Inspection (18)
10/09/2026
Permit issued — Construction Fence
S00533332-I1-FN
09/30/2026
Permit issued — Plumbing
S00555909-S2-PL
09/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Permit issued — Foundation
S00555909-S1-FO
01/21/2026
Permit issued — General Construction
S00555909-I1-GC
11/07/2025
Permit issued — Construction Fence
S00533332-I1-FN
10/27/2025
Permit issued — Plumbing
S00555909-S2-PL
10/24/2025
Filed — New Building
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
S00555909-S2
08/22/2025
Permit issued — Curb Cut
S00533340-I1-CC
05/08/2025
Permit issued — Foundation
S00555909-S1-FO
04/14/2025
Filed — New Building
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
S00555909-S1
04/09/2025
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
04/09/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
04/09/2025
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
04/09/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
04/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
02/19/2025
Permit issued — General Construction
S00555909-I1-GC
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
12/16/2024
Special inspection requirement — Lowest Floor Elevation
SAMI HAJJAR P.E
12/16/2024
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
12/16/2024
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
SAMI HAJJAR P.E
12/16/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SAMI HAJJAR P.E
12/16/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
12/13/2024
Objection resolved — Addressed
12/12/2024
Objection raised — Other
12/11/2024
Filed — New Building
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
S00555909-P2
11/13/2024
Permit issued — Construction Fence
S00533332-I1-FN
11/05/2024
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
11/05/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
11/05/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SAMI HAJJAR P.E
11/05/2024
Special inspection requirement — Lowest Floor Elevation
SAMI HAJJAR P.E
11/05/2024
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
SAMI HAJJAR P.E
11/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
09/23/2021
Filed — Alteration
HUB Consultation was accepted on 6/24/2021 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 123 Father Capodanno Boulevard. Subsequent filing to NB Job Number S00555909.
S00533340-P1
08/03/2021
Filed — Alteration
HUB Consultation was accepted on 6/24/2021 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 123 Father Capodanno Boulevard. Subsequent filing to NB Job Number S00555909.
S00533340-I1
08/03/2021
Filed — Alteration
S00533332-I1
08/02/2021
Filed — New Building
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
S00555909-I1
07/08/2021
Signed off — Alteration
ERECT 171 LF OF 8' HIGH WOOD CONSTRUCTION FENCE TO ENCLOSE SITE.
S00483953-I1
05/21/2021
Permit issued — Construction Fence
S00483953-I1-FN
03/11/2021
Filed — Alteration
ERECT 171 LF OF 8' HIGH WOOD CONSTRUCTION FENCE TO ENCLOSE SITE.
S00483953-I1
03/11/2021
Objection raised — Inspections
03/11/2021
Objection resolved — Addressed
03/10/2021
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
01/21/2021
Violation issued (ECB, closed)
Construction
01/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/21/2021
Violation issued (ECB, closed)
Construction
02/28/2020
Permit issued — Construction Fence
S00311730-I1-FN
02/14/2020
Objection raised — Other
02/14/2020
Objection resolved — Addressed
02/13/2020
Filed — Alteration
Filing for a Construction Fence for BIB APP-025914 Demolition
S00311730-I1
01/29/2020
Objection raised — Scope
01/29/2020
Objection raised — Mechanical
01/29/2020
Objection raised — Inspections
01/29/2020
Objection raised — Other
01/29/2020
Objection raised — Inspections
01/29/2020
Objection raised — Structural
01/23/2020
Filed — Alteration
S00095476-I1
09/17/2019
Violation issued (ECB, closed)
Construction
07/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedUrban Ecospaces10/09/2026
DOB NOWPlumbingPermit IssuedCapital Contracting P&H09/30/2026
DOB NOWFoundationPermit IssuedUrban Ecospaces04/08/2026
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces01/21/2026
DOB NOWConstruction FencePermit IssuedUrban Ecospaces11/07/2025
DOB NOWPlumbingPermit IssuedCapital Contracting P&H10/27/2025
DOB NOWCurb CutPermit IssuedUrban Ecospaces08/22/2025
DOB NOWFoundationPermit IssuedUrban Ecospaces05/08/2025
DOB NOWGeneral ConstructionPermit IssuedUrban Ecospaces02/19/2025
DOB NOWConstruction FencePermit IssuedUrban Ecospaces11/13/2024
DOB NOWConstruction FenceSigned-offRusso Development Enterprises05/21/2021
DOB NOWConstruction FencePermit IssuedRockaway Beach BLVD Con02/28/2020
1 project · most recent 10/24/2025
Sprinkler System
FiledStatusContractorScope
10/24/2025——Sprinkler System
1 project · most recent 10/24/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
10/24/2025Permit IssuedCapital Contracting P&HPlumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 01/15/2026
FiledStatusContractorScope
01/15/2026Permit IssuedUrban Electrical2 meters, 2 new_meters
1 project · most recent 10/24/2025
FiledStatusContractorScope
10/24/2025Permit IssuedCapital Contracting P&H1 scope_items
1 project · most recent 02/13/2020
Fence
FiledStatusContractorScope
02/13/2020Permit IssuedRockaway Beach BLVD ConFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/09/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
04/09/2025FinalSAMI HAJJAR P.Eprogress
04/09/2025Footing and FoundationSAMI HAJJAR P.Eprogress
04/09/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
04/09/2025Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
12/16/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
12/16/2024Lowest Floor ElevationSAMI HAJJAR P.Eprogress
12/16/2024Subgrade InspectionsSAMI HAJJAR P.Especial
12/16/2024Helical Piles Foundation (BB # 2014-020)SAMI HAJJAR P.Especial
12/16/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SAMI HAJJAR P.Especial
12/16/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
11/05/2024Subgrade InspectionsSAMI HAJJAR P.Especial
11/05/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
11/05/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SAMI HAJJAR P.Especial
11/05/2024Lowest Floor ElevationSAMI HAJJAR P.Eprogress
11/05/2024Helical Piles Foundation (BB # 2014-020)SAMI HAJJAR P.Especial
11/05/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
03/10/2021FinalROBESPIERRE ARISTILDEprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/26/2026S00095476-I1Request digital key ↗
08/25/2026S00533332-I1Request digital key ↗
08/25/2026S00533340-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026S00311730-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
10/27/2025540267628Open ↗
06/28/2021540179420Open ↗
10/12/2020540179420Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00555909-P2Open ↗
08/13/2026S00555909-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00555909-P2Open ↗
08/13/2026S00555909-I1Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/12/2020540179420Open ↗
▸DOB NOWFlood Zone Compliance1
08/13/2026S00095476-I1Open ↗
▸DOB NOWFlood Zone Design Certification1
08/13/2026S00095476-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00483953-I1Open ↗
08/25/2026S00533340-I1Open ↗
08/18/2026S00555909-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026S00555909-S1Open ↗
08/25/2026S00555909-I1Open ↗
08/25/2026S00555909-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026S00555909-S1Open ↗
08/25/2026S00555909-I1Open ↗
08/23/2026S00483953-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/27/2025540267628Open ↗
10/12/2020540179420Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/12/2020540179420Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/27/2025540267628Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/12/2020540179420Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
10/12/2020540179420Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
10/12/2020540179420Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026S00555909-P2Open ↗
08/13/2026S00555909-I1Open ↗
▸BISSTREET TREE CHECKLIST1
10/12/2020540179420Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00555909-I1Open ↗
▸Energy Compliance1
▸BISNYCECC ANALYSIS1
10/12/2020540179420Open ↗
▸Inspections & Test Reports2
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/27/2025540267628Open ↗
▸BISSOIL REPORT1
10/12/2020540179420Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026S00483953-I1Open ↗
08/13/2026S00095476-I1Open ↗
08/13/2026S00311730-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
10/27/2025540267628Open ↗
10/12/2020540179420Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026S00555909-P2Open ↗
08/13/2026S00555909-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00555909-P2Open ↗
08/13/2026S00555909-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/12/2020540179420Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/13/2026540267628Open ↗
▸BISBPP: FILING REQUIRED1
10/12/2020540179420Open ↗
▸BISPREFAB/MODULAR CONSTRUCTION: NYS COMPLIANCE STATEMENT1
10/12/2020540179420Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/27/2025540267628Open ↗