← Back
BuildNYC
Two family converted from one family
123 FATHER ZEISER PLACE
BRONX · BIN 2014826
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R6Zoning
1,672 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: Dota · 2,381 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic7p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Site & exterior7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Poly Engineer1504/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/28/2024$300K—Private party → Private party$179/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Poly Engineer510/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K A Interior Design1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri State Plumbing & HeatingPlumbing307/08/2026
KJK ElectricElectrical203/22/2026
Super Power ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Poly Engineer6110510/29/2025
Building Lifecycle
05/22/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01119041-I1-GC
12/22/2025
Signed off — Alteration CO
INTERIOR RENOVATION IN CELLAR, 1ST, 2ND FLOOR AND ATTIC. CONVERT EXISTING ONE FAMILY TO TWO FAMILIES AS PER PLAN. TO REMOVE ECB VIOLATION: 35421773P, 35421852N, 35421853P, 35421851L, 35421850J, 35421774R, 35421772N.
X01119041-S1
12/10/2025
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
12/09/2025
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
De Gao
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW Plumbing10/01/2025
DOB NOWPlumbingSigned-offDW Plumbing09/03/2025
DOB NOWGeneral ConstructionPermit IssuedSuper Power Construction05/22/2025
DOB NOWPlumbingSigned-offDW Plumbing05/20/2025
1 project · most recent 10/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offTri State Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025CompleteKJK ElectricGeneral Wiring
10/01/2025CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
11/07/2025Fire-Resistant Penetrations and JointsDe Gaospecial
11/07/2025HVAC-R and service water heating equipmentDe Gaoenergy_progress
11/07/2025HVAC-R and service water piping design and insulationDe Gaoenergy_progress
11/07/2025HVAC-R and service water heating system controlsDe Gaoenergy_progress
11/07/2025Energy Code Compliance InspectionsDe Gaoprogress
10/29/2025Fire-Resistant Penetrations and JointsDe Gaospecial
10/29/2025Energy Code Compliance InspectionsDe Gaoprogress
10/29/2025HVAC-R and service water piping design and insulationDe Gaoenergy_progress
10/29/2025HVAC-R and service water heating equipmentDe Gaoenergy_progress
10/29/2025HVAC-R and service water heating system controlsDe Gaoenergy_progress
06/04/2025Fenestration areasDe Gaoenergy_progress
06/04/2025MeteringDe Gaoenergy_progress
06/04/2025Fenestration air leakageDe Gaoenergy_progress
06/04/2025Energy Code Compliance InspectionsDe Gaoprogress
06/04/2025Fenestration and door U-factor and product ratingsDe Gaoenergy_progress
06/04/2025Interior lighting powerDe Gaoenergy_progress
06/04/2025Electric vehicle service equipment requirementsDe Gaoenergy_progress
06/04/2025Air barrier - visual inspectionDe Gaoenergy_progress
06/04/2025Fire-Resistant Penetrations and JointsDe Gaospecial
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account