← Back
BuildNYC
Over six families without stores
123 GUERNSEY STREET
BROOKLYN · Greenpoint · BIN 3065515
💬 Discuss this project
1928Year Built
4Stories
C1Building Class
R6BZoning
7,800 sfGross Floor Area
8Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Over six families without stores · 2,500 sf lot · 3.12 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof6p · 2 filings · 20 docs
Floor 4Unit 4A, Unit 4B, Unit 4C12p · 4 filings · 20 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Golonka Realty2810/13/2026
Phoenix403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jock Deboer, AIA208/13/2026
Voke Engineering205/21/2026
Clip Architects510/24/2025
Asr Engineering407/24/2025
Michael Deruvo & Associates Architects401/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Up Design Services403/21/2026
Arch-Form Design Build603/21/2026
LSK Consultant203/21/2026
WM Arch1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Agi Sewer & DrainsPlumbing407/08/2026
Cami ConstructionGeneral Contractor303/21/2026
Phoenix Sutton STRGeneral Contractor203/21/2026
ADS Plumbing & HeatingPlumbing203/21/2026
Golonka RealtyGeneral Contractor203/21/2026
H Building Managementspecialty_contractor107/08/2026
M InteriorsGeneral Contractor109/25/2026
Galicia ContractingGeneral Contractor103/21/2026
H Building ManagementGeneral Contractor104/09/2026
Fast RepairPlumbing108/21/2009
Fast Repair Inc Dba Jack CranePlumbing105/13/2002
Golonka RealtyGeneral Contractor211/20/2001
Plumbing WorksPlumbing107/29/2011
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Badaly Architect7137205/21/2026
Simon7555410/24/2025
World Design Architecture9323201/21/2025
Building Lifecycle
09/24/2026
Signed off — Alteration
Plumbing work for Apt# 4B. Replace kitchen sink, new dishwasher, new electric ventless washer/dryer combo with laundry box, new floor drain, replacement of existing gas range, existing gas shutoff valve to remain, no work to gas piping.
B01384971-S2
08/31/2026
Permit issued — Structural
B01384971-S2-ST
08/31/2026
Objection raised — Scope
08/31/2026
Objection raised — Cost
08/13/2026
Filed — Alteration
Plumbing work for Apt# 4B. Replace kitchen sink, new dishwasher, new electric ventless washer/dryer combo with laundry box, new floor drain, replacement of existing gas range, existing gas shutoff valve to remain, no work to gas piping.
B01384971-S4
123 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offM Interiors08/31/2026
DOB NOWPlumbingSigned-offAgi Sewer & Drains07/06/2026
DOB NOWGeneral ConstructionSigned-offH Building Management08/21/2025
DOB NOWMechanical SystemsSigned-offH Building Management08/21/2025
DOB NOWPlumbingSigned-offAgi Sewer & Drains08/18/2025
DOB NOWGeneral ConstructionSigned-offCami Construction02/05/2025
DOB NOWPlumbingSigned-offAgi Sewer & Drains07/17/2024
DOB NOWPlumbingSigned-offAgi Sewer & Drains04/27/2023
BISOTISSUEDGalicia Contracting04/06/2016
BISEQISSUEDPhoenix Sutton STR04/05/2016
BISEQISSUEDPhoenix Sutton STR03/28/2016
BISPLISSUEDPlumbing NYC07/29/2011
BISOTISSUEDGolonka Realty07/25/2011
BISOTISSUEDGolonka Realty03/28/2011
BISPLISSUEDFast Repair08/21/2009
BISOTISSUEDGolonka Realty04/06/2009
BISPLISSUEDFast Repair05/13/2002
BISOTISSUEDGolonka Realty11/20/2001
BISOTISSUEDGolonka Realty07/13/2000
BISPLISSUEDA.D.S. Plumbing and Heating02/10/2000
BIS—ISSUEDBest Int Construction12/14/1999
BISPLISSUEDA.D.S. Plumbing and Heating04/10/1998
BIS—ISSUEDZbigniew Golonka12/09/1992
1 project · most recent 08/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/13/2026Signed-offM InteriorsHeating and Air Conditioning Systems
3 projects · most recent 08/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/13/2026Signed-offAgi Sewer & DrainsGas, Water/Sanitary
07/24/2025——Gas, Water/Sanitary
06/09/2025——Gas, Water/Sanitary
11 projects · most recent 07/22/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
07/22/2026CompleteArgon ElectricalGeneral Wiring
07/21/2026Permit IssuedV-Tech ElectricalHVAC Wiring
04/01/2026CompleteArgon ElectricalGeneral Wiring
02/25/2026Permit IssuedArgon ElectricalGeneral Wiring
02/18/2026Permit IssuedKenneth Fisk ElectricGeneral Wiring
02/16/2026CompleteArgon ElectricalGeneral Wiring
01/29/2026CompleteArgon ElectricalGeneral Wiring
11/20/2025CompleteJoseph Weinstein ElectricGeneral Wiring
09/09/2024CompleteMechanical Construction SystemsGeneral Wiring
12/20/2023Permit IssuedBlue Seagull ElectricalGeneral Wiring
07/16/2023CompleteRidge ElectricGeneral Wiring
1 project · most recent 08/13/2026
Steel Wood
FiledStatusContractorScope
08/13/2026Signed-offM InteriorsSteel, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2025Pass-Final Sign Permit InspectionPassView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
05/13/2026Tenant Protection Plan ComplianceSHAHIN BADALYspecial
05/13/2026HVAC-R and service water heating equipment—energy_progress
05/13/2026HVAC-R and service water piping design and insulation—energy_progress
05/13/2026Energy Code Compliance Inspections—progress
05/13/2026HVAC-R and service water heating system controls—energy_progress
04/17/2026Final—progress
04/17/2026Mechanical Systems—special
04/13/2026Structural Steel - DetailsSHAHIN BADALYspecial
04/13/2026Tenant Protection Plan ComplianceSHAHIN BADALYspecial
04/13/2026Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
04/13/2026FinalKevin Muneneprogress
04/13/2026Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
04/13/2026Wood – Seismic ResistanceSHAHIN BADALYspecial
10/24/2025Interior lighting powerJaeyoung Jangenergy_progress
10/24/2025Lighting controlsJaeyoung Jangenergy_progress
10/24/2025Fire-Resistant Penetrations and JointsSIMON JIANGspecial
10/24/2025Fire-Resistance Rated ConstructionJaeyoung Jangprogress
10/24/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
10/24/2025Tenant Protection Plan ComplianceSIMON JIANGspecial
10/24/2025Lighting in dwelling unitsJaeyoung Jangenergy_progress
10/24/2025MeteringJaeyoung Jangenergy_progress
10/20/2025Tenant Protection Plan Compliance—special
10/20/2025Fire-Resistant Penetrations and JointsSIMON JIANGspecial
10/20/2025Energy Code Compliance InspectionsJaeyoung Jangprogress
10/20/2025Fire-Resistance Rated ConstructionJaeyoung Jangprogress
Latest 25 of 46.
124 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account